← Back
Two family frame
1494 EAST 96 STREET
BROOKLYN · BIN 3233651
💬 Discuss this project
1920Year Built
2Stories
B2Building Class
R4-1Zoning
1,248 sfGross Floor Area
2Units
Two family frame · Owner of record: PHILEO OUTREACH INTERNATIONAL MINISTRIES , INC. · 5,593 sf lot · 0.22 FAR built · Flood zone X500
Locations of Work
ArchitecturePlumbing
Floor 24p · 2 filings · 20 docs
Floor 12p · 1 filing · 14 docs
Cellar3p · 2 filings · 20 docs
1 job · most recent 03/06/2024
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
03/06/2024——Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Toshiba MCY-MAP0487HS-UL 27,000 BTU · Vrf Outdoor ×3
MCY-MAP0367HS-UL 8,500 BTU · Vrf Outdoor ×1
— 48JCEWO6A3M5-3W2CO Rooftop Unit ×1
48LCEA174M5-4S2CO Rooftop Unit ×1
Ventilation
Toshiba MCY- MAP0367HS-UL 27,000 BTU · Vrf Outdoor ×2
1 job · most recent 03/06/2024
Steel
FiledStatusContractorScope
03/06/2024——Steel
Building Lifecycle
All (20)Filed (2)Special Inspection (18)
09/16/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
FERAS AYOUB
04/30/2024
Filed — Alteration
B01038220-I1
04/01/2024
Special inspection requirement — Maintenance information
03/27/2024
Special inspection requirement — Electrical motors and elevators
03/27/2024
Special inspection requirement — Air barrier - visual inspection
03/27/2024
Special inspection requirement — Exterior lighting power
03/27/2024
Special inspection requirement — Lighting in dwelling units
03/06/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
FILING HEREWITH MECHANICAL WORK FOR THE RENOVATION OF THE EXISTING BUILDING INCLUDES NEW VRF SYSTEM(S), VENTILATION, EXHAUST AND ROOF TOP UNITS.
B00975529-I1
12/12/2023
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
12/12/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
12/12/2023
Special inspection requirement — Fenestration areas
12/12/2023
Special inspection requirement — Insulation placement and R values
12/12/2023
Special inspection requirement — Lighting controls
12/12/2023
Special inspection requirement — Interior lighting power
12/12/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
12/12/2023
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
12/12/2023
Special inspection requirement — Energy Code Compliance Inspections
12/12/2023
Special inspection requirement — Fire-Resistance Rated Construction
12/12/2023
Special inspection requirement — Fenestration air leakage
12/11/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/23/2014$570K—WRH, LLC → PHILEO OUTREACH INTERNATIONAL MINISTRIES, INC.$457/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HANY RIZKALLA ARCHITECT PLLC204/30/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
WSCONSULTANT & EXPEDITING SERVICES403/21/2026
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
09/16/2024Subsurface Investigations (Borings/Test Pits)FERAS AYOUBspecial
04/01/2024Maintenance information—energy_progress
03/27/2024Electrical motors and elevators—energy_progress
03/27/2024Air barrier - visual inspection—energy_progress
03/27/2024Exterior lighting power—energy_progress
03/27/2024Lighting in dwelling units—energy_progress
12/12/2023Exterior Insulation and Finish Systems (EIFS)—special
12/12/2023Fenestration and door U-factor and product ratings—energy_progress
12/12/2023Fenestration areas—energy_progress
12/12/2023Insulation placement and R values—energy_progress
12/12/2023Lighting controls—energy_progress
12/12/2023Interior lighting power—energy_progress
12/12/2023Fire-Resistant Penetrations and Joints—special
12/12/2023Wall Panels, Curtain Walls, and Veneers—special
12/12/2023Energy Code Compliance Inspections—progress
12/12/2023Fire-Resistance Rated Construction—progress
12/12/2023Fenestration air leakage—energy_progress
12/11/2023Structural Stability – Alterations of existing buildings—special
▾Documents — 22 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/25/2026B00975529-P1Request digital key ↗
08/25/2026B00975529-I1Request digital key ↗
08/25/2026B01038220-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/25/2026B01038220-I1Open ↗
08/25/2026B01038220-P1Open ↗
08/13/2026B00975529-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature1
09/02/2026B00975529-I1Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/25/2026B01038220-P1Open ↗
08/25/2026B01038220-I1Open ↗
08/13/2026B00975529-P1Open ↗
Showing 3 of 6 on file for this type
▸Inspections & Test Reports3
▸DOB NOWSOIL REPORT2
08/13/2026B00975529-P1Open ↗
08/13/2026B00975529-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B00975529-I1Open ↗
▸Other Documents4
▸DOB NOWSite Survey: Initial2
08/13/2026B00975529-I1Open ↗
08/13/2026B00975529-P1Open ↗
▸DOB NOWProperty Ownership Certification2
08/13/2026B00975529-I1Open ↗
08/13/2026B00975529-P1Open ↗