← Back
Two family frame
1919 ROCKAWAY PARKWAY
BROOKLYN · BIN 3233720
💬 Discuss this project
1915Year Built
2Stories
B2Building Class
R4-1Zoning
1,968 sfGross Floor Area
2Units
10 Open Violations ▸FDNY Report ↗
Two family frame · 2,040 sf lot · 0.96 FAR built · Flood zone X500
Locations of Work
ArchitecturePlumbing
Cellar3p · 1 filing · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
LUCKNER MEADE 1919103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ARC-HI-TECT ASSOCIATE INC201/16/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ARCHITECTURAL DESIGN SOLUTIONS203/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ARC-HI-TECH ASSOCIATES IN6963201/16/2026
Building Lifecycle
All (21)Filed (2)Violation (14)Objection (4)Special Inspection (1)
02/16/2026
Objection resolved — Addressed
02/16/2026
Objection resolved — Addressed
02/11/2026
Objection raised — Other
02/11/2026
Objection raised — Admin
01/16/2026
Filed — Alteration
APPLICATION TO RESTORE TO PRIOR LEGAL CONDITION. REMOVE FULL-HEIGHTPARTITIONS AND ILLEGALLY CREATED APARTMENT INCLUDING TWO BED ROOMS,RESIDENTIAL KITCHEN W/ SINK, GAS STOVE & A 3 PC BATHROOM AT THE CELLAR.ALSO RENOVATE EXISTING CELLAR AS PER PLAN TO COMPL
B01339964-I1
01/16/2026
Filed — Alteration
APPLICATION TO RESTORE TO PRIOR LEGAL CONDITION. REMOVE FULL-HEIGHTPARTITIONS AND ILLEGALLY CREATED APARTMENT INCLUDING TWO BED ROOMS,RESIDENTIAL KITCHEN W/ SINK, GAS STOVE & A 3 PC BATHROOM AT THE CELLAR.ALSO RENOVATE EXISTING CELLAR AS PER PLAN TO COMPL
B01339964-S1
12/25/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
IGOR LISOVENKO
07/08/2025
Violation issued (ECB, open)
Unknown
07/08/2025
Violation issued (ECB, open)
Construction
09/05/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/05/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/03/2010
Violation issued (ECB, closed)
Construction
01/17/2010
Violation issued (HPD, open)
B
01/17/2010
Violation issued (HPD, open)
B
11/16/2009
Violation issued (ECB, closed)
Construction
11/16/2009
Violation issued (ECB, closed)
Construction
11/16/2009
Violation issued (ECB, closed)
Unknown
11/16/2009
Violation issued (DOB, open)
VW-VIOLATION WORK WITHOUT PERMIT - ACTIVE
03/14/2002
Violation issued (HPD, open)
B
03/08/2002
Violation issued (HPD, open)
B
03/05/2002
Violation issued (HPD, open)
B
Nothing on file for this building.
1 project · most recent 01/16/2026
Gas Water/Sanitary
FiledStatusContractorScope
01/16/2026——Gas, Water/Sanitary
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
12/25/2025Fire-Resistant Penetrations and JointsIGOR LISOVENKOspecial
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/18/2026B01339964-I1Request digital key ↗
08/18/2026B01339964-S1Request digital key ↗
▸Seals & Professional Certifications3
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/13/2026B01339964-I1Open ↗
08/13/2026B01339964-S1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/30/2026B01339964-S1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026B01339964-I1Open ↗
08/13/2026B01339964-S1Open ↗