← Back
Two family brick
10201 AVENUE N
BROOKLYN · BIN 3233940
💬 Discuss this project
1960Year Built
2Stories
B1Building Class
R5BZoning
1,600 sfGross Floor Area
2Units
Two family brick · 3,000 sf lot · 0.53 FAR built · Flood zone X500
Locations of Work
Architecture
Roof2p · 1 filing · 9 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TOM PETERSEN ARCHITECT, LLC105/07/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SOLAR CONTRACTING LLCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
THOMAS PETERSEN ARCHITECT7854105/07/2026
Building Lifecycle
All (8)Filed (1)Permit Issued (1)Signed Off (1)Special Inspection (5)
07/31/2026
Signed off — Alteration
SCOPE OF WORK IS SOLELY FOR THE INSTALLATION OF THE SOLAR ELECTRONIC GENERATING SYSTEM. ALL OTHER WORK IS NOT TO BE RELIED UPON AS BEINGAPPROVED AND/OR PERMITTED BY THE NYC DEPARTMENT OF BUILDINGS.
B01398775-I1
05/12/2026
Permit issued — Solar
B01398775-I1-SL
05/07/2026
Filed — Alteration
SCOPE OF WORK IS SOLELY FOR THE INSTALLATION OF THE SOLAR ELECTRONIC GENERATING SYSTEM. ALL OTHER WORK IS NOT TO BE RELIED UPON AS BEINGAPPROVED AND/OR PERMITTED BY THE NYC DEPARTMENT OF BUILDINGS.
B01398775-I1
05/07/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
TOM PETERSEN
05/07/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
TOM PETERSEN
05/07/2026
Special inspection requirement — Energy Code Compliance Inspections
TOM PETERSEN
05/07/2026
Special inspection requirement — Final
TOM PETERSEN
05/07/2026
Special inspection requirement — Air barrier - visual inspection
TOM PETERSEN
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSOLAR CONTRACTING LLC05/12/2026
2 projects · most recent 07/24/2026
FiledStatusContractorScope
07/24/2026CompleteSOLAR ELEC CONTRACTNG LLC—
05/07/2026CompleteSOLAR ELEC CONTRACTNG LLC2 meters
1 project · most recent 05/07/2026
FiledStatusContractorScope
05/07/2026Signed-offSOLAR CONTRACTING LLC12 panels, 5.2 kw, 657.39 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
05/07/2026Structural Stability – Alterations of existing buildingsTOM PETERSENspecial
05/07/2026Fire-Resistant Penetrations and JointsTOM PETERSENspecial
05/07/2026Energy Code Compliance InspectionsTOM PETERSENprogress
05/07/2026FinalTOM PETERSENprogress
05/07/2026Air barrier - visual inspectionTOM PETERSENenergy_progress
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/17/2026B01398775-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
08/26/2026B01398775-I1Open ↗
08/26/2026B01398775-I1Open ↗
08/26/2026B01398775-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/26/2026B01398775-I1Open ↗
08/26/2026B01398775-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/17/2026B01398775-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/17/2026B01398775-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/17/2026B01398775-I1Open ↗