← Back
Two family converted from one family
2172 EAST 36 STREET
BROOKLYN · BIN 3241594
💬 Discuss this project
1925Year Built
2Stories
B3Building Class
R4Zoning
1,404 sfGross Floor Area
2Units
Two family converted from one family · 3,125 sf lot · 0.45 FAR built · Flood zone X500
Locations of Work
Architecture
Floor 22p · 1 filing · 12 docs
Floor 11 filing · 12 docs
Cellar1 filing · 12 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/14/2022$960K—Private party → Private party$684/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
WT ENGINEERING STUDIO202/18/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
H J BUILDING CONSULTING403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SPLEN CONSTRUCTION INCGeneral Contractor303/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
WT ENGINEERING STUDIO6730202/18/2022
Building Lifecycle
All (23)Filed (2)Permit Issued (1)Special Inspection (20)
02/25/2022
Permit issued — General Construction
B00679688-I1-GC
02/18/2022
Filed — Alteration
Interior renovation of existing two story building with general construction work as per plans filed here with. Plumbing work will be filed subsequently. No change in use, egress or certificate of occupancy.
B00679688-I1
02/18/2022
Filed — Alteration
Interior renovation of existing two story building with general construction work as per plans filed here with. Plumbing work will be filed subsequently. No change in use, egress or certificate of occupancy.
B00679688-S1
02/18/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
WAI LUN WAYNE TSANG
02/18/2022
Special inspection requirement — Energy Code Compliance Inspections
WAI LUN WAYNE TSANG
02/18/2022
Special inspection requirement — Fire-Resistance Rated Construction
WAI LUN WAYNE TSANG
02/18/2022
Special inspection requirement — Air barrier - visual inspection
WAI LUN WAYNE TSANG
02/18/2022
Special inspection requirement — Insulation placement and R values
WAI LUN WAYNE TSANG
02/18/2022
Special inspection requirement — Maintenance information
WAI LUN WAYNE TSANG
02/18/2022
Special inspection requirement — Lighting controls
WAI LUN WAYNE TSANG
02/18/2022
Special inspection requirement — Fenestration air leakage
WAI LUN WAYNE TSANG
02/18/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
WAI LUN WAYNE TSANG
02/18/2022
Special inspection requirement — Permanent certificate
WAI LUN WAYNE TSANG
02/18/2022
Special inspection requirement — Lighting in dwelling units
WAI LUN WAYNE TSANG
02/18/2022
Special inspection requirement — Fenestration areas
WAI LUN WAYNE TSANG
02/18/2022
Special inspection requirement — Interior lighting power
WAI LUN WAYNE TSANG
02/18/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
WAI LUN WAYNE TSANG
02/18/2022
Special inspection requirement — Energy Code Compliance Inspections
WAI LUN WAYNE TSANG
02/18/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
WAI LUN WAYNE TSANG
02/18/2022
Special inspection requirement — HVAC-R and service water heating equipment
WAI LUN WAYNE TSANG
02/18/2022
Special inspection requirement — HVAC-R and service water heating system controls
WAI LUN WAYNE TSANG
02/18/2022
Special inspection requirement — Maintenance information
WAI LUN WAYNE TSANG
02/18/2022
Special inspection requirement — Permanent certificate
WAI LUN WAYNE TSANG
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedSPLEN CONSTRUCTION INC02/25/2022
1 project · most recent 02/18/2022
Gas Water/Sanitary
FiledStatusContractorScope
02/18/2022——Gas, Water/Sanitary
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
02/18/2022Fire-Resistant Penetrations and JointsWAI LUN WAYNE TSANGspecial
02/18/2022Energy Code Compliance InspectionsWAI LUN WAYNE TSANGprogress
02/18/2022Fire-Resistance Rated ConstructionWAI LUN WAYNE TSANGprogress
02/18/2022Air barrier - visual inspectionWAI LUN WAYNE TSANGenergy_progress
02/18/2022Insulation placement and R valuesWAI LUN WAYNE TSANGenergy_progress
02/18/2022Maintenance informationWAI LUN WAYNE TSANGenergy_progress
02/18/2022Lighting controlsWAI LUN WAYNE TSANGenergy_progress
02/18/2022Fenestration air leakageWAI LUN WAYNE TSANGenergy_progress
02/18/2022Fenestration and door U-factor and product ratingsWAI LUN WAYNE TSANGenergy_progress
02/18/2022Permanent certificateWAI LUN WAYNE TSANGenergy_progress
02/18/2022Lighting in dwelling unitsWAI LUN WAYNE TSANGenergy_progress
02/18/2022Fenestration areasWAI LUN WAYNE TSANGenergy_progress
02/18/2022Interior lighting powerWAI LUN WAYNE TSANGenergy_progress
02/18/2022Fire-Resistant Penetrations and JointsWAI LUN WAYNE TSANGspecial
02/18/2022Energy Code Compliance InspectionsWAI LUN WAYNE TSANGprogress
02/18/2022HVAC-R and service water piping design and insulationWAI LUN WAYNE TSANGenergy_progress
02/18/2022HVAC-R and service water heating equipmentWAI LUN WAYNE TSANGenergy_progress
02/18/2022HVAC-R and service water heating system controlsWAI LUN WAYNE TSANGenergy_progress
02/18/2022Maintenance informationWAI LUN WAYNE TSANGenergy_progress
02/18/2022Permanent certificateWAI LUN WAYNE TSANGenergy_progress
▾Documents — 12 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/31/2026B00679688-S1Request digital key ↗
08/31/2026B00679688-I1Request digital key ↗
▸Seals & Professional Certifications8
▸DOB NOWProgress Inspector Seal & Signature4
08/29/2026B00679688-I1Open ↗
08/29/2026B00679688-I1Open ↗
08/24/2026B00679688-S1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/13/2026B00679688-I1Open ↗
08/13/2026B00679688-S1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/29/2026B00679688-I1Open ↗
08/24/2026B00679688-S1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026B00679688-S1Open ↗
08/13/2026B00679688-I1Open ↗