← Back
One story - permanent living quarter
461 MAYFAIR DRIVE SOUTH
BROOKLYN · BIN 3242940
💬 Discuss this project
1970Year Built
1Stories
A2Building Class
R2Zoning
2,310 sfGross Floor Area
1Units
1 Open Violation ▸FDNY Report ↗
One story - permanent living quarter · 3,817 sf lot · 0.61 FAR built · Flood zone AE
Locations of Work
ArchitectureStructuralPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction15p · 1 filing · 20 docs
Floor 1Under Construction30p · 1 filing · 20 docs
2 jobs · most recent 05/28/2026
General Wiring
FiledStatusContractorScope
05/28/2026Permit IssuedBAY ELECTRIC INC.General Wiring
05/28/2026Permit IssuedBAY ELECTRIC INC.General Wiring
1 job · most recent 05/14/2026
Steel
FiledStatusContractorScope
05/14/2026Permit IssuedNINO GENERAL CONTRACTINGSteel
1 job · most recent 05/14/2026
Fence
FiledStatusContractorScope
05/14/2026Permit IssuedNINO GENERAL CONTRACTINGFence
Building Lifecycle
All (59)Filed (5)Permit Issued (5)Violation (1)Inspection (2)Objection (16)Special Inspection (30)
08/21/2026
Violation issued (ECB, open)
Construction
07/08/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
07/02/2026
Permit issued — Structural
B01304133-S2-ST
07/02/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/17/2026
Permit issued — Plumbing
B01304133-S4-PL
06/08/2026
Objection resolved — Addressed
05/26/2026
Objection raised — Cost
05/14/2026
Filed — Alteration
HORIZONTAL SECOND STORY ENLARGEMENT AND INTERIOR RENOVATION OF EXISTING SINGLE FAMILY DWELLING. INCREASE IN BULK AND FAR. NO CHANGE IN EGRESS, OCCUPANCY AND USE
B01304133-S4
05/14/2026
Special inspection requirement — HVAC-R and service water heating equipment
Alix Michel
05/14/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Joe Lieberman
05/14/2026
Special inspection requirement — Energy Code Compliance Inspections
Joe Lieberman
05/14/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joe Lieberman
05/14/2026
Special inspection requirement — Maintenance information
Alix Michel
05/14/2026
Special inspection requirement — HVAC-R and service water heating system controls
Alix Michel
05/14/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Alix Michel
04/21/2026
Objection resolved — Addressed
04/17/2026
Permit issued — Foundation
B01304133-S1-FO
04/16/2026
Permit issued — General Construction
B01304133-I1-GC
04/14/2026
Permit issued — Construction Fence
B01304133-S3-FN
04/10/2026
Objection resolved — Addressed
04/10/2026
Objection resolved — Addressed
04/03/2026
Objection raised — Cost
04/03/2026
Objection raised — Admin
02/26/2026
Objection resolved — Addressed
02/18/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Joe Lieberman
02/17/2026
Filed — Alteration
HORIZONTAL SECOND STORY ENLARGEMENT AND INTERIOR RENOVATION OF EXISTING SINGLE FAMILY DWELLING. INCREASE IN BULK AND FAR. NO CHANGE IN EGRESS, OCCUPANCY AND USE
B01304133-S3
02/17/2026
Objection raised — Other
02/16/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
SHAHRIAR QUAYYUM
02/13/2026
Objection raised — Other
02/12/2026
Objection raised — Cost
02/12/2026
Objection resolved — Addressed
02/09/2026
Objection raised — Admin
02/09/2026
Objection resolved — Addressed
02/02/2026
Objection resolved — Addressed
01/29/2026
Filed — Alteration
HORIZONTAL SECOND STORY ENLARGEMENT AND INTERIOR RENOVATION OF EXISTING SINGLE FAMILY DWELLING. INCREASE IN BULK AND FAR. NO CHANGE IN EGRESS, OCCUPANCY AND USE
B01304133-S2
01/29/2026
Filed — Alteration
HORIZONTAL SECOND STORY ENLARGEMENT AND INTERIOR RENOVATION OF EXISTING SINGLE FAMILY DWELLING. INCREASE IN BULK AND FAR. NO CHANGE IN EGRESS, OCCUPANCY AND USE
B01304133-S1
01/29/2026
Special inspection requirement — Footing and Foundation
Joe Lieberman
01/29/2026
Special inspection requirement — Structural Cold-Formed Steel
Joe Lieberman
01/29/2026
Special inspection requirement — Structural Steel - Details
Joe Lieberman
01/29/2026
Special inspection requirement — Final
Joe Lieberman
01/29/2026
Special inspection requirement — Concrete - Cast-In-Place
Joe Lieberman
01/29/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Joe Lieberman
01/29/2026
Special inspection requirement — Final
Joe Lieberman
11/05/2025
Objection raised — Other
10/23/2025
Filed — Alteration
HORIZONTAL SECOND STORY ENLARGEMENT AND INTERIOR RENOVATION OF EXISTING SINGLE FAMILY DWELLING. INCREASE IN BULK AND FAR. NO CHANGE IN EGRESS, OCCUPANCY AND USE
B01304133-I1
10/21/2025
Special inspection requirement — Insulation placement and R values
Alix Michel
10/21/2025
Special inspection requirement — Maintenance information
Alix Michel
10/21/2025
Special inspection requirement — Permanent certificate
Alix Michel
10/21/2025
Special inspection requirement — Air barrier - visual inspection
Alix Michel
10/21/2025
Special inspection requirement — Fenestration air leakage
Alix Michel
10/21/2025
Special inspection requirement — Air barrier — testing
Alix Michel
10/21/2025
Special inspection requirement — Fire-Resistance Rated Construction
Joe Lieberman
10/21/2025
Special inspection requirement — Energy Code Compliance Inspections
Joe Lieberman
10/21/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Alix Michel
10/21/2025
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
Joe Lieberman
10/21/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joe Lieberman
10/21/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Joe Lieberman
10/21/2025
Special inspection requirement — Interior lighting power
Alix Michel
10/21/2025
Special inspection requirement — Metering
Alix Michel
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CITISCAPE CONSULTING LTD1408/29/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/03/2025$992K—Private party → Private party$429/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CITISCAPE CONSULTING LTD505/14/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CITISCAPE CONSULTING LTD803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NINO GENERAL CONTRACTINGGeneral Contractor407/08/2026
M & M PIPING AND HEATINGPlumbing106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CITISCAPE CONSULTING LTD762405/14/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedNINO GENERAL CONTRACTING07/02/2026
DOB NOWPlumbingPermit IssuedM & M PIPING AND HEATING06/17/2026
DOB NOWFoundationPermit IssuedNINO GENERAL CONTRACTING04/17/2026
DOB NOWGeneral ConstructionPermit IssuedNINO GENERAL CONTRACTING04/16/2026
DOB NOWConstruction FencePermit IssuedNINO GENERAL CONTRACTING04/14/2026
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
07/08/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/02/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 31
DateRequirementInspectorRole
05/14/2026HVAC-R and service water heating equipmentAlix Michelenergy_progress
05/14/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationJoe Liebermanspecial
05/14/2026Energy Code Compliance InspectionsJoe Liebermanprogress
05/14/2026Fire-Resistant Penetrations and JointsJoe Liebermanspecial
05/14/2026Maintenance informationAlix Michelenergy_progress
05/14/2026HVAC-R and service water heating system controlsAlix Michelenergy_progress
05/14/2026HVAC-R and service water piping design and insulationAlix Michelenergy_progress
02/18/2026Structural Stability – Alterations of existing buildingsJoe Liebermanspecial
02/16/2026Subsurface Investigations (Borings/Test Pits)SHAHRIAR QUAYYUMspecial
01/29/2026Footing and FoundationJoe Liebermanprogress
01/29/2026Structural Cold-Formed SteelJoe Liebermanspecial
01/29/2026Structural Steel - DetailsJoe Liebermanspecial
01/29/2026FinalJoe Liebermanprogress
01/29/2026Concrete - Cast-In-PlaceJoe Liebermanspecial
01/29/2026Structural Stability – Alterations of existing buildingsJoe Liebermanspecial
01/29/2026FinalJoe Liebermanprogress
10/21/2025Insulation placement and R valuesAlix Michelenergy_progress
10/21/2025Maintenance informationAlix Michelenergy_progress
10/21/2025Permanent certificateAlix Michelenergy_progress
10/21/2025Air barrier - visual inspectionAlix Michelenergy_progress
10/21/2025Fenestration air leakageAlix Michelenergy_progress
10/21/2025Air barrier — testing Alix Michelenergy_progress
10/21/2025Fire-Resistance Rated ConstructionJoe Liebermanprogress
10/21/2025Energy Code Compliance InspectionsJoe Liebermanprogress
10/21/2025Fenestration and door U-factor and product ratingsAlix Michelenergy_progress
Latest 25 of 31.
▾Documents — 35 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/17/2026B01304133-S3Request digital key ↗
08/15/2026B01304133-S4Request digital key ↗
08/15/2026B01304133-S2Request digital key ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZoning Exhibit form (1-5)1
08/14/2026B01304133-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/14/2026B01304133-I1Open ↗
▸Seals & Professional Certifications20
▸DOB NOWProgress Inspector Seal & Signature9
09/01/2026B01304133-S4Open ↗
09/01/2026B01304133-S4Open ↗
09/01/2026B01304133-S4Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/01/2026B01304133-S4Open ↗
08/26/2026B01304133-S2Open ↗
08/25/2026B01304133-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/17/2026B01304133-S2Open ↗
08/17/2026B01304133-S1Open ↗
08/17/2026B01304133-I1Open ↗
Showing 3 of 5 on file for this type
▸Inspections & Test Reports3
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/14/2026B01304133-S1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/14/2026B01304133-S1Open ↗
▸DOB NOWSOIL REPORT1
08/14/2026B01304133-S1Open ↗
▸Other Documents5
▸DOB NOWPlot Diagram2
08/14/2026B01304133-I1Open ↗
08/14/2026B01304133-S1Open ↗
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
08/15/2026B01304133-S2Open ↗
▸DOB NOWSite Survey: Initial1
08/14/2026B01304133-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/14/2026B01304133-I1Open ↗