← Back
Elevator cooperative
3096 BRIGHTON 6 STREET
BROOKLYN · BIN 3245100
💬 Discuss this project
1929Year Built
6Stories
D4Building Class
R7-1Zoning
—Gross Floor Area
71Units
30 Open Violations 28 unresolved · 2 paperwork only ▸FDNY Report ↗
Elevator cooperative · Owner of record: 3096 OWNERS CORP CO MARTIN GELFAND · 5.22 FAR built · Flood zone AE
Locations of Work
ArchitecturePlumbing
Permit Issued — active, not yet Signed-off
Floor 2Under Construction1p · 1 filing · 1 doc
Floor 1
1 job · most recent 03/24/2026
Gas Water/Sanitary
FiledStatusContractorScope
03/24/2026Permit IssuedAUSTIN PLBG & HTG CO.INCGas, Water/Sanitary
2 jobs · most recent 05/12/2026
General Wiring
FiledStatusContractorScope
05/12/2026Permit IssuedJOSEPH WEINSTEIN ELECTRICGeneral Wiring
09/19/2024Permit IssuedRICHARD NEU—
Building Lifecycle
All (94)Filed (5)Permit Issued (4)Violation (60)Objection (24)Special Inspection (1)
08/10/2026
Permit issued — Plumbing
B01373616-S2-PL
08/07/2026
Permit issued — General Construction
B01373616-I1-GC
05/27/2026
Violation issued (HPD, closed)
C
05/01/2026
Violation issued (HPD, closed)
A
04/18/2026
Objection resolved — Resolved
04/18/2026
Objection resolved — Resolved
04/17/2026
Objection raised — Scope
04/17/2026
Objection raised — Cost
04/17/2026
Objection resolved — Resolved
04/08/2026
Objection resolved — Addressed
04/08/2026
Objection resolved — Addressed
04/08/2026
Objection resolved — Addressed
04/07/2026
Objection resolved — Addressed
04/02/2026
Objection raised — Scope
04/02/2026
Objection raised — Plumbing
04/02/2026
Objection raised — Scope
04/02/2026
Objection raised — Scope
03/31/2026
Objection raised — Scope
03/31/2026
Objection raised — Scope
03/31/2026
Objection resolved — Addressed
03/31/2026
Objection raised — Scope
03/31/2026
Objection resolved — Addressed
03/31/2026
Objection raised — Fire_Protection
03/31/2026
Objection resolved — Addressed
03/31/2026
Objection raised — Cost
03/31/2026
Objection resolved — Addressed
03/31/2026
Objection raised — Scope
03/31/2026
Objection resolved — Addressed
03/24/2026
Filed — Alteration
Replace at the same location: stove, kitchen sink and faucet, toilet, lavatory; Replace bathtub with shower. Replace water piping 10lf.
B01373616-S2
03/24/2026
Filed — Alteration
Replace at the same location: stove, kitchen sink and faucet, toilet, lavatory; Replace bathtub with shower. Replace water piping 10lf.
B01373616-I1
03/24/2026
Violation issued (FDNY_NOV, closed)
03/17/2026
Special inspection requirement — Final
DENIS PORTAEV
03/06/2026
Violation issued (ECB, closed)
Construction
03/06/2026
Violation issued (ECB, closed)
Unknown
03/06/2026
Violation issued (ECB, open)
Construction
02/08/2026
Violation issued (HPD, closed)
C
09/05/2025
Violation issued (HPD, open)
C
09/05/2025
Violation issued (HPD, open)
A
08/13/2025
Violation issued (HPD, closed)
C
08/13/2025
Violation issued (HPD, open)
B
08/13/2025
Violation issued (HPD, open)
B
08/13/2025
Violation issued (HPD, open)
B
07/31/2025
Violation issued (HPD, closed)
C
06/06/2025
Violation issued (HPD, closed)
A
01/27/2025
Violation issued (HPD, open)
C
12/12/2024
Permit issued — Sidewalk Shed
B01099729-I1-SH
09/25/2024
Filed — Alteration
WINDOW LINTEL REPLACEMENT AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY WITH THIS APPLICATION.
B01103605-I1
08/22/2024
Filed — Alteration
B01099729-I1
08/22/2024
Permit issued — Sidewalk Shed
B01099729-I1-SH
07/31/2024
Violation issued (ECB, open)
Construction
04/06/2021
Violation issued (ECB, open)
Construction
03/07/2021
Violation issued (HPD, open)
A
03/07/2021
Violation issued (HPD, open)
A
02/09/2021
Violation issued (HPD, open)
C
02/09/2021
Violation issued (HPD, open)
C
02/09/2021
Violation issued (HPD, open)
B
02/09/2021
Violation issued (HPD, open)
B
02/09/2021
Violation issued (HPD, open)
B
01/08/2021
Filed — Alteration
B00444194-I1
12/12/2020
Violation issued (ECB, closed)
Construction
Latest 60 of 94 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
UNITED KING CONSTRUCTION404/09/2026
3096 OWNERS2803/22/2026
MAXTIN MANAGEMENT403/21/2026
3096 BRIGHTON 6 STREET303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NYC SPECIAL CONTRACTORS203/24/2026
MCHENERY TESTING LAB109/25/2024
MJE PROFESSIONAL SERVICES108/22/2024
CHRISTOPHER TEETER101/08/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SKY MANAGEMENT GROUP203/21/2026
SNR EXPEDITING DESIGN203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
UNITED KING CONSTRUCTIONGeneral Contractor404/09/2026
BEKKERMAN, MIKHAILElectrical103/21/2026
MP & L METAL INCElectrical103/21/2026
NYC SPECIAL CONTRACTORSGeneral Contractor108/08/2026
AUSTIN PLBG & HTG CO.INCPlumbing108/11/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MCHENERY TESTING LAB9181209/25/2024
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedAUSTIN PLBG & HTG CO.INC08/10/2026
DOB NOWGeneral ConstructionPermit IssuedNYC SPECIAL CONTRACTORS08/07/2026
DOB NOWSidewalk ShedPermit IssuedUNITED KING CONSTRUCTION12/12/2024
DOB NOWSidewalk ShedPermit IssuedUNITED KING CONSTRUCTION08/22/2024
BISEQISSUEDPIONEER GENERAL CONSTRUCT12/05/2011
BISPLISSUEDACCURATE MECHANICAL INC03/14/2007
BIS—ISSUEDY & E CONSTRUCTION & DEVELOPMENT03/08/2007
BISPLISSUEDH BRONNER & SON PLBG & HTG01/25/2006
BISPLISSUEDARCO PLBG AND HTG INC03/25/2005
BIS—ISSUEDIBM INDUSTRIES INC03/18/2005
BISPLISSUEDBALTER LEHIGH PLUMBING & HEATING05/11/2001
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
03/17/2026FinalDENIS PORTAEVprogress
▾Documents — 24 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch2
08/24/2026B01099729-I1Request digital key ↗
08/24/2026B01103605-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing Legalization1
09/02/2026B00444194-I1Request digital key ↗
▸Applications & Permits4
▸BISPLAN / WORK APPROVAL APPLICATION3
11/07/2012320512904Open ↗
10/12/2012320512904Open ↗
11/28/2011320397708Open ↗
▸BISWORK PERMIT APPLICATION1
12/08/2011320397708Open ↗
▸Seals & Professional Certifications8
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/13/2026B01099729-I1Open ↗
08/13/2026B00444194-I1Open ↗
08/13/2026B01103605-I1Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
10/12/2012320512904Open ↗
11/28/2011320397708Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
11/28/2011320397708Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
11/28/2011320397708Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/25/2026B01373616-I1Open ↗
▸Trade Schedules & Equipment1
▸BISFA - FDNY APPROVAL : FD-FAA1
02/22/2013320512904Open ↗
▸Safety & Tenant Protection1
▸DOB NOWTenant Protection Plan1
08/13/2026B00444194-I1Open ↗
▸Environmental & Asbestos2
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
10/12/2012320512904Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026B01103605-I1Open ↗
▸Approvals, Objections & Sign-offs2
▸BISADMINISTRATIVE OBJECTIONS2
10/12/2012320512904Open ↗
11/28/2011320397708Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
10/12/2012320512904Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET2
10/12/2012320512904Open ↗
11/28/2011320397708Open ↗