One story - permanent living quarter
1414 SHORE BOULEVARD
BROOKLYN · BIN 3246617
💬 Discuss this project
1935Year Built
1Stories
A2Building Class
R3-1Zoning
924 sfGross Floor Area
1Units
One story - permanent living quarter · 3,617 sf lot · 0.26 FAR built · Flood zone AE
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NICHOLAS MERHIGE, PE308/25/2026
Building Lifecycle
All (3)Filed (3)
08/25/2026
Filed — Alteration
General Construction, Foundation and structural work at 1st floor OSP and roof indicated on drawings filed herewith. No change in use egress or occupancy under this application
B01439488-I1
08/25/2026
Filed — Alteration
Install Temporary wood construction fence to be removed upon completion of work at rear yard indicated on drawings filed herewith No change i use egress or occupancy under this application
B01442451-I1
08/25/2026
Filed — Alteration
plumbing work at 1st floor indicated on drawings filed herewith No change in Use Egress or Occupancy under this application
B01439501-I1
Nothing on file for this building.
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
09/09/2026Subsurface Investigations (Borings/Test Pits)—special
08/20/2026Fenestration areas—energy_progress
08/20/2026Air barrier - visual inspection—energy_progress
08/20/2026Interior lighting power—energy_progress
08/20/2026Fenestration air leakage—energy_progress
08/20/2026Electric vehicle service equipment requirements—energy_progress
08/20/2026Maintenance information—energy_progress
08/20/2026Permanent certificate—energy_progress
08/20/2026Insulation placement and R values—energy_progress
08/20/2026Fenestration and door U-factor and product ratings—energy_progress
08/11/2026Fire-Resistant Penetrations and Joints—special
08/11/2026Structural Stability – Alterations of existing buildings—special
08/11/2026Energy Code Compliance Inspections—progress
08/11/2026Fire-Resistance Rated Construction—progress
08/10/2026Fire-Resistant Penetrations and Joints—special
08/10/2026Energy Code Compliance Inspections—progress
08/10/2026HVAC-R and service water piping design and insulation—energy_progress
07/31/2026Final—progress
07/31/2026Lowest Floor Elevation—progress
▾Documents — 17 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/26/2026B01442451-I1Request digital key ↗
08/26/2026B01439488-I1Request digital key ↗
08/26/2026B01439501-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
08/26/2026B01439488-I1Open ↗
▸Seals & Professional Certifications4
▸DOB NOWDPL-1: Design Professional Seal & Signature4
09/14/2026B01439488-S1Open ↗
08/26/2026B01442451-I1Open ↗
08/26/2026B01439488-I1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
09/14/2026B01439488-S1Open ↗
08/26/2026B01439488-I1Open ↗
08/26/2026B01439501-I1Open ↗
▸Inspections & Test Reports2
▸DOB NOWSOIL REPORT1
09/14/2026B01439488-S1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
09/14/2026B01439488-S1Open ↗
▸Other Documents4
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
09/14/2026B01439488-S1Open ↗
08/26/2026B01439488-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/26/2026B01439488-I1Open ↗
▸DOB NOWPlot Diagram1
08/26/2026B01439488-I1Open ↗