← Back
One story - permanent living quarter
169 MACKENZIE STREET
BROOKLYN · BIN 3246709
💬 Discuss this project
1930Year Built
1Stories
A2Building Class
R3-1Zoning
576 sfGross Floor Area
1Units
3 Open Violations 1 unresolved · 2 paperwork only ▸FDNY Report ↗
One story - permanent living quarter · 2,400 sf lot · 0.24 FAR built · Flood zone AE
Locations of Work
ArchitectureStructural
Roof1p · 2 filings · 20 docs
Nothing on file for this building.
Building Lifecycle
All (29)Filed (3)Permit Issued (1)Signed Off (1)Violation (4)Inspection (2)Objection (2)Special Inspection (16)
07/03/2023
Signed off — Alteration
FILING THIS JOB TO CLEAR THE OPEN ECB VIOLATIONS #35525499H & #39030260R FOR WORK WITHOUT PERMIT. REPLACE EX. PART OF THE ROOF ABOVE 1ST FLOOR, NO CHANGE OF USE, EGRESS OR OCCUPANCY.
B08014451-I1
06/29/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
06/27/2023
Special inspection requirement — Wood – Prefabricated I-Joists
NASHAT IBRAHIM
06/27/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
NASHAT IBRAHIM
06/27/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
JUN YAN
06/27/2023
Special inspection requirement — Final
NASHAT IBRAHIM
06/27/2023
Special inspection requirement — Structural Wood Frame
NASHAT IBRAHIM
06/27/2023
Special inspection requirement — Fire-Resistance Rated Construction
NASHAT IBRAHIM
06/27/2023
Special inspection requirement — Energy Code Compliance Inspections
NASHAT IBRAHIM
06/27/2023
Special inspection requirement — Insulation placement and R values
NASHAT IBRAHIM
06/22/2023
Filed — Alteration
FILING THIS JOB TO CLEAR THE OPEN ECB VIOLATIONS #35525499H & #39030260R FOR WORK WITHOUT PERMIT. REPLACE EX. PART OF THE ROOF ABOVE 1ST FLOOR, NO CHANGE OF USE, EGRESS OR OCCUPANCY.
B08014451-P1
06/07/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
NASHAT IBRAHIM
06/07/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
JUN YAN
06/07/2023
Special inspection requirement — Wood – Prefabricated I-Joists
NASHAT IBRAHIM
06/07/2023
Special inspection requirement — Energy Code Compliance Inspections
NASHAT IBRAHIM
06/07/2023
Special inspection requirement — Final
NASHAT IBRAHIM
06/07/2023
Special inspection requirement — Fire-Resistance Rated Construction
NASHAT IBRAHIM
06/07/2023
Special inspection requirement — Structural Wood Frame
NASHAT IBRAHIM
06/07/2023
Special inspection requirement — Insulation placement and R values
NASHAT IBRAHIM
06/05/2023
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
03/17/2023
Permit issued — Structural
B08014451-I1-GC-CX
10/24/2022
Objection raised — Other
10/24/2022
Objection resolved — Addressed
10/21/2022
Filed — Alteration
FILING THIS JOB TO CLEAR THE OPEN ECB VIOLATIONS #35525499H & #39030260R FOR WORK WITHOUT PERMIT. REPLACE EX. PART OF THE ROOF ABOVE 1ST FLOOR, NO CHANGE OF USE, EGRESS OR OCCUPANCY.
B08014451-I1
06/14/2021
Filed — Alteration CO
B00502098-I1
03/03/2021
Violation issued (ECB, open)
Construction
01/06/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/13/2020
Violation issued (ECB, open)
Construction
12/01/2009
Violation issued (ECB, open)
Zoning
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NMI ARCHITECTURE, PLLC306/22/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NMI ARCHITECTURE PLLC603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
7421 LORENZO & SONS CONSTGeneral Contractor303/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JUN YAN, PE7170206/22/2023
NMI ARCHITECTURE, PLLC6825206/22/2023
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-off7421 LORENZO & SONS CONST03/17/2023
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
06/29/2023Pass-Final General Construction Non-Directive 14PassView ↗
06/05/2023Fail-Final General Construction Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
06/27/2023Wood – Prefabricated I-JoistsNASHAT IBRAHIMspecial
06/27/2023Fire-Resistant Penetrations and JointsNASHAT IBRAHIMspecial
06/27/2023Structural Stability – Alterations of existing buildingsJUN YANspecial
06/27/2023FinalNASHAT IBRAHIMprogress
06/27/2023Structural Wood FrameNASHAT IBRAHIMprogress
06/27/2023Fire-Resistance Rated ConstructionNASHAT IBRAHIMprogress
06/27/2023Energy Code Compliance InspectionsNASHAT IBRAHIMprogress
06/27/2023Insulation placement and R valuesNASHAT IBRAHIMenergy_progress
06/07/2023Fire-Resistant Penetrations and JointsNASHAT IBRAHIMspecial
06/07/2023Structural Stability – Alterations of existing buildingsJUN YANspecial
06/07/2023Wood – Prefabricated I-JoistsNASHAT IBRAHIMspecial
06/07/2023Energy Code Compliance InspectionsNASHAT IBRAHIMprogress
06/07/2023FinalNASHAT IBRAHIMprogress
06/07/2023Fire-Resistance Rated ConstructionNASHAT IBRAHIMprogress
06/07/2023Structural Wood FrameNASHAT IBRAHIMprogress
06/07/2023Insulation placement and R valuesNASHAT IBRAHIMenergy_progress
▾Documents — 28 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
09/01/2026B00502098-I1Request digital key ↗
08/28/2026B08014451-P1Request digital key ↗
08/14/2026B08014451-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026B00502098-I1Open ↗
▸Seals & Professional Certifications19
▸DOB NOWProgress Inspector Seal & Signature10
08/29/2026B08014451-P1Open ↗
08/29/2026B08014451-P1Open ↗
08/29/2026B08014451-P1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
08/29/2026B08014451-P1Open ↗
08/29/2026B08014451-P1Open ↗
08/29/2026B08014451-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
09/01/2026B00502098-I1Open ↗
08/28/2026B08014451-I1Open ↗
08/28/2026B08014451-P1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
09/01/2026B00502098-I1Open ↗
08/28/2026B08014451-P1Open ↗
08/14/2026B08014451-I1Open ↗
▸Other Documents2
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026B00502098-I1Open ↗
▸DOB NOWPlot Diagram1
08/13/2026B00502098-I1Open ↗