← Back
Multi-story retail building (2+)
1727 SHEEPSHEAD BAY ROAD
BROOKLYN · BIN 3247041
💬 Discuss this project
1927Year Built
2Stories
K2Building Class
R4Zoning
2,500 sfGross Floor Area
3Units
1 Open Violation 0 unresolved · 1 paperwork only ▸FDNY Report ↗
Multi-story retail building (2+) · Owner of record: DMK REALTY LLC · 1,668 sf lot · 1.5 FAR built · Flood zone X500
Locations of Work
ArchitectureMechanical
Floor 22p · 1 filing · 20 docs
Floor 11p · 1 filing · 18 docs
2 jobs · most recent 07/09/2025
FiledStatusContractorScope
07/09/2025Permit IssuedKINGS ELECTRIC CO., INC.3 meters, 3 new_meters
05/22/2023CompleteOPTIMAL ELECTRIC, INC—
Building Lifecycle
All (56)Filed (8)Permit Issued (6)Signed Off (6)Violation (2)Inspection (4)Special Inspection (30)
10/31/2025
Signed off — Alteration
B00860252-I1
10/21/2025
Signed off — Alteration
MINOR INTERIOR RENOVATION TO PART OF THE EXISTING COMMERCIAL SPACE AT FIRST FLOOR, INCLUDING DEMOLITION AND INSTALLATION OF NON-BEARING PARTITIONS, REPLACEMENT OF FIXTURES, FINISHES AND CASEWORK.
B01232001-I1
10/21/2025
Signed off — Alteration
SUBSEQUENT MECHANICAL SYSTEMS FILING
B01224155-I1
10/17/2025
Signed off — Alteration
SUBSEQUENT MECHANICAL SYSTEMS FILING
B01224155-S2
10/03/2025
Signed off — Alteration
SUBSEQUENT MECHANICAL SYSTEMS FILING
B01224155-S1
08/26/2025
Permit issued — Mechanical Systems
B01224155-S2-MS
08/22/2025
Special inspection requirement — Lighting in dwelling units
Yevgeniy Rybak
08/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Yevgeniy Rybak
08/22/2025
Special inspection requirement — Energy Code Compliance Inspections
Yevgeniy Rybak
08/22/2025
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
Yevgeniy Rybak
08/22/2025
Special inspection requirement — Final
Yevgeniy Rybak
08/22/2025
Special inspection requirement — Energy Code Compliance Inspections
Yevgeniy Rybak
08/22/2025
Special inspection requirement — Lighting controls
Yevgeniy Rybak
08/22/2025
Special inspection requirement — Interior lighting power
Yevgeniy Rybak
08/22/2025
Special inspection requirement — Final
Yevgeniy Rybak
08/22/2025
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
Yevgeniy Rybak
08/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Yevgeniy Rybak
08/21/2025
Filed — Alteration
SUBSEQUENT MECHANICAL SYSTEMS FILING
B01224155-S2
08/21/2025
Filed — Alteration
MINOR INTERIOR RENOVATION TO PART OF THE EXISTING COMMERCIAL SPACE AT FIRST FLOOR, INCLUDING DEMOLITION AND INSTALLATION OF NON-BEARING PARTITIONS, REPLACEMENT OF FIXTURES, FINISHES AND CASEWORK.
B01232001-P1
08/21/2025
Filed — Alteration
SUBSEQUENT MECHANICAL SYSTEMS FILING
B01224155-P1
08/21/2025
Special inspection requirement — HVAC-R and service water heating equipment
Yevgeniy Rybak
08/21/2025
Special inspection requirement — Maintenance information
Yevgeniy Rybak
08/21/2025
Special inspection requirement — Energy Code Compliance Inspections
Yevgeniy Rybak
08/21/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Yevgeniy Rybak
08/21/2025
Special inspection requirement — HVAC-R and service water heating system controls
Yevgeniy Rybak
08/21/2025
Special inspection requirement — Ventilation and air distribution system
Yevgeniy Rybak
08/20/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Yevgeniy Rybak
08/20/2025
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
Yevgeniy Rybak
08/20/2025
Special inspection requirement — Energy Code Compliance Inspections
Yevgeniy Rybak
08/20/2025
Special inspection requirement — Final
Yevgeniy Rybak
08/20/2025
Special inspection requirement — Lighting in dwelling units
Yevgeniy Rybak
08/20/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Yevgeniy Rybak
08/20/2025
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
Yevgeniy Rybak
08/20/2025
Special inspection requirement — Energy Code Compliance Inspections
Yevgeniy Rybak
08/20/2025
Special inspection requirement — Final
Yevgeniy Rybak
08/20/2025
Special inspection requirement — Interior lighting power
Yevgeniy Rybak
08/20/2025
Special inspection requirement — Lighting controls
Yevgeniy Rybak
06/09/2025
Permit issued — General Construction
B01232001-I1-GC
06/05/2025
Filed — Alteration
MINOR INTERIOR RENOVATION TO PART OF THE EXISTING COMMERCIAL SPACE AT FIRST FLOOR, INCLUDING DEMOLITION AND INSTALLATION OF NON-BEARING PARTITIONS, REPLACEMENT OF FIXTURES, FINISHES AND CASEWORK.
B01232001-I1
06/02/2025
Permit issued — Plumbing
B01224155-S1-PL
05/30/2025
Permit issued — General Construction
B01224155-I1-GC
05/27/2025
Filed — Alteration
SUBSEQUENT MECHANICAL SYSTEMS FILING
B01224155-I1
05/27/2025
Filed — Alteration
SUBSEQUENT MECHANICAL SYSTEMS FILING
B01224155-S1
05/12/2025
Special inspection requirement — Final
Yevgeniy Rybak
05/12/2025
Special inspection requirement — Mechanical Systems
Yevgeniy Rybak
10/25/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00879015-I1
06/07/2023
Permit issued — General Construction
B00860252-I1-GC
05/26/2023
Permit issued — Sidewalk Shed
B00879015-I1-SH
05/25/2023
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00879015-I1
04/17/2023
Filed — Alteration
B00860252-I1
02/10/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/27/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/27/2023
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
01/27/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/14/2002
Violation issued (ECB, closed)
Construction
05/14/2002
Violation issued (ECB, open)
Zoning
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/21/2022$1.1M—— → —$428/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RYBAK ARCHITECTS, P.C.608/21/2025
PAUL PERDEK, PROF. ENG. PLLC105/25/2023
CONSELA ENGINEERING P.C.104/17/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE DESIGN SOLUTION203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FIRST CNSTRCTION ZONE INCGeneral Contractor304/09/2026
NADKOS INCGeneral Contractor107/08/2026
POWERS BRIDGING & SCAFFOLDINGGeneral Contractor107/08/2026
AMOK INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RYBAK ARCHITECTS, P.C.4044508/21/2025
CONSELA ENGINEERING P.C.353104/17/2023
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offFIRST CNSTRCTION ZONE08/26/2025
DOB NOWGeneral ConstructionSigned-offFIRST CNSTRCTION ZONE06/09/2025
DOB NOWPlumbingSigned-offAMOK INC06/02/2025
DOB NOWGeneral ConstructionSigned-offFIRST CNSTRCTION ZONE05/30/2025
DOB NOWGeneral ConstructionSigned-offNADKOS INC06/07/2023
DOB NOWSidewalk ShedSigned-offPOWERS BRIDGING & SCAFFOL05/26/2023
BIS—ISSUEDN/A01/03/2003
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
02/10/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/27/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/27/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
01/27/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 38
DateRequirementInspectorRole
08/22/2025Lighting in dwelling unitsYevgeniy Rybakenergy_progress
08/22/2025Fire-Resistant Penetrations and JointsYevgeniy Rybakspecial
08/22/2025Energy Code Compliance InspectionsYevgeniy Rybakprogress
08/22/2025Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)Yevgeniy Rybakspecial
08/22/2025FinalYevgeniy Rybakprogress
08/22/2025Energy Code Compliance InspectionsYevgeniy Rybakprogress
08/22/2025Lighting controlsYevgeniy Rybakenergy_progress
08/22/2025Interior lighting powerYevgeniy Rybakenergy_progress
08/22/2025FinalYevgeniy Rybakprogress
08/22/2025Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)Yevgeniy Rybakspecial
08/22/2025Fire-Resistant Penetrations and JointsYevgeniy Rybakspecial
08/21/2025HVAC-R and service water heating equipmentYevgeniy Rybakenergy_progress
08/21/2025Maintenance informationYevgeniy Rybakenergy_progress
08/21/2025Energy Code Compliance InspectionsYevgeniy Rybakprogress
08/21/2025HVAC-R and service water piping design and insulationYevgeniy Rybakenergy_progress
08/21/2025HVAC-R and service water heating system controlsYevgeniy Rybakenergy_progress
08/21/2025Ventilation and air distribution systemYevgeniy Rybakenergy_progress
08/20/2025Fire-Resistant Penetrations and JointsYevgeniy Rybakspecial
08/20/2025Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)Yevgeniy Rybakspecial
08/20/2025Energy Code Compliance InspectionsYevgeniy Rybakprogress
08/20/2025FinalYevgeniy Rybakprogress
08/20/2025Lighting in dwelling unitsYevgeniy Rybakenergy_progress
08/20/2025Fire-Resistant Penetrations and JointsYevgeniy Rybakspecial
08/20/2025Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)Yevgeniy Rybakspecial
08/20/2025Energy Code Compliance InspectionsYevgeniy Rybakprogress
Latest 25 of 38.
▾Documents — 59 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/27/2026B00879015-I1Request digital key ↗
08/21/2026B01232001-P1Request digital key ↗
08/21/2026B01232001-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications45
▸DOB NOWProgress Inspector Seal & Signature26
09/23/2026B01224155-S2Open ↗
09/23/2026B01224155-S2Open ↗
09/23/2026B01224155-S2Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
09/23/2026B01224155-S2Open ↗
09/02/2026B00860252-I1Open ↗
09/02/2026B00860252-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/27/2026B00879015-I1Open ↗
08/21/2026B01232001-I1Open ↗
08/21/2026B01232001-P1Open ↗
Showing 3 of 8 on file for this type
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/21/2026B01232001-P1Open ↗
08/21/2026B01232001-I1Open ↗
08/20/2026B01224155-P1Open ↗
Showing 3 of 7 on file for this type