← Back
Two stories - detached, small or mid-size
29 NOVA COURT
BROOKLYN · BIN 3248970
💬 Discuss this project
1925Year Built
1.75Stories
A1Building Class
R4-1Zoning
1,261 sfGross Floor Area
1Units
1 Open Violation ▸FDNY Report ↗
Two stories - detached, small or mid-size · Owner of record: 646 CONEY ISLAND LLC · 1,800 sf lot · 0.7 FAR built · Flood zone AE
Locations of Work
ArchitectureElectricalPlumbing
Floor 29p · 2 filings · 20 docs
Floor 19p · 2 filings · 20 docs
Cellar8p · 1 filing · 9 docs
1 job · most recent 04/02/2026
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
04/02/2026Permit IssuedECTO RESTORATION INCVentilation Systems
Ventilation
Greenheck SP-C50-QD 50 CFM · Exhaust Fan ×6
SP-B90 100 CFM · Exhaust Fan ×2
1 job · most recent 11/22/2025
Gas Water/Sanitary
FiledStatusContractorScope
11/22/2025Permit IssuedAMC PLBG, HTG & CLNG, INCGas, Water/Sanitary
1 job · most recent 02/10/2025
General Wiring
FiledStatusContractorScope
02/10/2025Permit IssuedA ELECTRICAL MAIN SVC INCGeneral Wiring
1 job · most recent 01/22/2025
Fence
FiledStatusContractorScope
01/22/2025Permit IssuedECTO RESTORATION INCFence
Building Lifecycle
All (42)Filed (6)Permit Issued (3)Violation (2)Inspection (9)Special Inspection (22)
04/13/2026
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
04/02/2026
Filed — Alteration
Interior alteration and renovation of an existing one-family house.
B01167841-P1
12/15/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
TARIQ SIDDIQUI
11/24/2025
Special inspection requirement — Energy Code Compliance Inspections
TARIQ SIDDIQUI
11/24/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
TARIQ SIDDIQUI
11/22/2025
Filed — Alteration
Install new plumbing fixtures and related piping as per drawing.
B01167843-P2
10/21/2025
Filed — Alteration
Install new plumbing fixtures and related piping as per drawing.
B01167843-P1
10/20/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
TARIQ SIDDIQUI
10/20/2025
Special inspection requirement — Energy Code Compliance Inspections
TARIQ SIDDIQUI
10/20/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
TARIQ SIDDIQUI
10/20/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
TARIQ SIDDIQUI
10/20/2025
Special inspection requirement — Heating Systems
TARIQ SIDDIQUI
10/20/2025
Special inspection requirement — Mechanical Systems
TARIQ SIDDIQUI
10/20/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
TARIQ SIDDIQUI
10/20/2025
Special inspection requirement — Energy Code Compliance Inspections
TARIQ SIDDIQUI
10/20/2025
Special inspection requirement — Final
TARIQ SIDDIQUI
10/20/2025
Special inspection requirement — Fire-Resistance Rated Construction
TARIQ SIDDIQUI
10/20/2025
Special inspection requirement — Air barrier - visual inspection
TARIQ SIDDIQUI
10/20/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
TARIQ SIDDIQUI
10/20/2025
Special inspection requirement — HVAC-R and service water heating equipment
TARIQ SIDDIQUI
10/20/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
TARIQ SIDDIQUI
10/20/2025
Special inspection requirement — Fenestration areas
TARIQ SIDDIQUI
10/20/2025
Special inspection requirement — HVAC-R and service water heating system controls
TARIQ SIDDIQUI
10/20/2025
Special inspection requirement — Insulation placement and R values
TARIQ SIDDIQUI
10/20/2025
Special inspection requirement — Fenestration air leakage
TARIQ SIDDIQUI
10/20/2025
Special inspection requirement — Interior lighting power
TARIQ SIDDIQUI
09/08/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/30/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/03/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/21/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
02/21/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/29/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/28/2025
Permit issued — Construction Fence
B01167844-I1-FN
01/28/2025
Permit issued — Plumbing
B01167843-I1-PL
01/24/2025
Permit issued — General Construction
B01167841-I1-GC-CX
01/22/2025
Filed — Alteration
Install new temporary construction fence as per drawing.
B01167844-I1
01/22/2025
Filed — Alteration
Install new plumbing fixtures and related piping as per drawing.
B01167843-I1
01/22/2025
Filed — Alteration
Interior alteration and renovation of an existing one-family house.
B01167841-I1
01/19/2024
Violation issued (ECB, closed)
Construction
01/18/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/09/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BANK OF AMERICA N.A.103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/13/2025$480K—— → —$381/sf unit
10/30/2023$797K—— → —$632/sf unit
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GRACE ENGINEERING PLLC.604/02/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ECTO RESTORATION INCGeneral Contractor307/08/2026
AMC PLBG, HTG & CLNG, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GRACE ENGINEERING PLLC.2176504/02/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedECTO RESTORATION INC01/28/2025
DOB NOWPlumbingPermit IssuedAMC PLBG, HTG & CLNG, INC01/28/2025
DOB NOWGeneral ConstructionPermit IssuedECTO RESTORATION INC01/24/2025
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
04/13/2026Fail-Final General Construction Non-Directive 14FailView ↗
12/15/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/08/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/30/2025Pass-Final CND-Occupancy InspectionPassView ↗
06/03/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/21/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/21/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/29/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/09/2023Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
11/24/2025Fire-Resistant Penetrations and JointsTARIQ SIDDIQUIspecial
11/24/2025Energy Code Compliance InspectionsTARIQ SIDDIQUIprogress
11/24/2025HVAC-R and service water piping design and insulationTARIQ SIDDIQUIenergy_progress
10/20/2025Fire-Resistant Penetrations and JointsTARIQ SIDDIQUIspecial
10/20/2025Energy Code Compliance InspectionsTARIQ SIDDIQUIprogress
10/20/2025HVAC-R and service water piping design and insulationTARIQ SIDDIQUIenergy_progress
10/20/2025Fire-Resistant Penetrations and JointsTARIQ SIDDIQUIspecial
10/20/2025Heating SystemsTARIQ SIDDIQUIspecial
10/20/2025Mechanical SystemsTARIQ SIDDIQUIspecial
10/20/2025Structural Stability – Alterations of existing buildingsTARIQ SIDDIQUIspecial
10/20/2025Energy Code Compliance InspectionsTARIQ SIDDIQUIprogress
10/20/2025FinalTARIQ SIDDIQUIprogress
10/20/2025Fire-Resistance Rated ConstructionTARIQ SIDDIQUIprogress
10/20/2025Air barrier - visual inspectionTARIQ SIDDIQUIenergy_progress
10/20/2025Fenestration and door U-factor and product ratingsTARIQ SIDDIQUIenergy_progress
10/20/2025HVAC-R and service water heating equipmentTARIQ SIDDIQUIenergy_progress
10/20/2025HVAC-R and service water piping design and insulationTARIQ SIDDIQUIenergy_progress
10/20/2025Fenestration areasTARIQ SIDDIQUIenergy_progress
10/20/2025HVAC-R and service water heating system controlsTARIQ SIDDIQUIenergy_progress
10/20/2025Insulation placement and R valuesTARIQ SIDDIQUIenergy_progress
10/20/2025Fenestration air leakageTARIQ SIDDIQUIenergy_progress
10/20/2025Interior lighting powerTARIQ SIDDIQUIenergy_progress
▾Documents — 25 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/20/2026B01167843-P2Request digital key ↗
08/20/2026B01167843-P1Request digital key ↗
08/20/2026B01167843-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications15
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/20/2026B01167843-P2Open ↗
08/20/2026B01167843-P1Open ↗
08/20/2026B01167843-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/21/2026B01167843-I1Open ↗
09/21/2026B01167843-I1Open ↗
09/01/2026B01167843-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/21/2026B01167843-I1Open ↗
09/01/2026B01167843-P1Open ↗
08/26/2026B01167841-P1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/20/2026B01167843-P2Open ↗
08/20/2026B01167843-P1Open ↗
08/20/2026B01167843-I1Open ↗
Showing 3 of 5 on file for this type