← Back
Two family frame
34 BEVY COURT
BROOKLYN · BIN 3249959
💬 Discuss this project
1920Year Built
2Stories
B2Building Class
R4-1Zoning
1,344 sfGross Floor Area
2Units
Two family frame · 1,785 sf lot · 0.75 FAR built · Flood zone AE
Locations of Work
Architecture
Roof1p · 1 filing · 4 docs
Basement1p · 1 filing · 4 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SQUARE ARCH, LLC108/22/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUSTAINABLE STRATEGIESGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SQ. ARCH, LLC4802108/22/2025
Building Lifecycle
All (3)Filed (1)Permit Issued (1)Signed Off (1)
01/07/2026
Signed off — Alteration
INSTALLATION OF SOLAR ELECTRIC GENERATION SYSTEM FOR UTILITY INTERCONNECTION
B01276092-I1
08/26/2025
Permit issued — Solar
B01276092-I1-SL
08/22/2025
Filed — Alteration
INSTALLATION OF SOLAR ELECTRIC GENERATION SYSTEM FOR UTILITY INTERCONNECTION
B01276092-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUSTAINABLE STRATEGIES08/26/2025
1 project · most recent 08/22/2025
FiledStatusContractorScope
08/22/2025CompleteSOURCE ELECTRIC INC1 meters
Nothing on file for this building.
▾Documents — 4 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/20/2026B01276092-I1Request digital key ↗
▸Seals & Professional Certifications1
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/20/2026B01276092-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/20/2026B01276092-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026B01276092-I1Open ↗