← Back
Condo, residential unit in 1-3 story building
1259 48 STREET
BROOKLYN · BIN 3253369
💬 Discuss this project
1989Year Built
3Stories
R3Building Class
R6Zoning
5,183 sfGross Floor Area
3Units
Rent Stabilized42 Open Violations 41 unresolved · 1 paperwork only ▸FDNY Report ↗
Condo, residential unit in 1-3 story building · 4,000 sf lot · 1.3 FAR built · Flood zone X
Locations of Work
Architecture
Roof2p · 2 filings · 15 docs
Floor 31p · 2 filings · 15 docs
Floor 2
Floor 1
Nothing on file for this building.
Building Lifecycle
All (106)Filed (3)Violation (48)Objection (46)Special Inspection (9)
07/22/2026
Objection raised — Scope
07/21/2026
Filed — Alteration
HEREWITH FILING AN APPLICATION FOR AN EXTENSION 125 SF AT THE EXISTING SIDEYARD. FILING TO PATCH AND REPAIR ALL ALTERED/ DAMAGED FINISHED SURFACES AT EXTENSION/ EXISTING CONSTRUCTION. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
B01310558-S2
06/03/2026
Violation issued (ECB, open)
Construction
05/01/2026
Violation issued (HPD, open)
A
01/26/2026
Violation issued (HPD, open)
A
01/26/2026
Violation issued (HPD, open)
A
01/26/2026
Violation issued (HPD, open)
A
01/26/2026
Violation issued (HPD, open)
A
01/26/2026
Violation issued (HPD, open)
C
01/26/2026
Violation issued (HPD, open)
A
01/26/2026
Violation issued (HPD, open)
A
01/12/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
12/24/2025
Objection raised — Structural
12/24/2025
Objection resolved — Addressed
12/24/2025
Objection raised — Scope
12/24/2025
Objection resolved — Resolved
12/24/2025
Objection raised — Scope
12/24/2025
Objection resolved — Addressed
12/24/2025
Objection raised — Other
12/24/2025
Objection resolved — Resolved
12/24/2025
Objection raised — Other
12/24/2025
Objection resolved — Addressed
12/24/2025
Objection raised — Scope
12/24/2025
Objection resolved — Addressed
12/24/2025
Objection raised — Scope
12/24/2025
Objection resolved — Addressed
12/24/2025
Objection raised — Scope
12/24/2025
Objection resolved — Addressed
12/24/2025
Objection raised — Other
12/24/2025
Objection resolved — Resolved
12/24/2025
Objection raised — Structural
12/24/2025
Objection resolved — Addressed
11/19/2025
Violation issued (HPD, open)
I
11/17/2025
Objection raised — Zoning
11/17/2025
Objection resolved — Resolved
11/17/2025
Objection raised — Zoning
11/17/2025
Objection resolved — Addressed
11/17/2025
Objection raised — Zoning
11/17/2025
Objection resolved — Addressed
11/17/2025
Objection raised — Zoning
11/17/2025
Objection resolved — Addressed
11/17/2025
Objection raised — Admin
11/17/2025
Objection resolved — Addressed
11/17/2025
Objection raised — Admin
11/17/2025
Objection resolved — Addressed
11/11/2025
Filed — Alteration
HEREWITH FILING AN APPLICATION FOR AN EXTENSION 125 SF AT THE EXISTING SIDEYARD. FILING TO PATCH AND REPAIR ALL ALTERED/ DAMAGED FINISHED SURFACES AT EXTENSION/ EXISTING CONSTRUCTION. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
B01310558-I1
10/29/2025
Special inspection requirement — Tenant Protection Plan Compliance
10/29/2025
Special inspection requirement — Final
10/29/2025
Special inspection requirement — Energy Code Compliance Inspections
10/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
10/21/2025
Objection resolved — Resolved
10/21/2025
Objection resolved — Resolved
10/21/2025
Objection resolved — Resolved
10/21/2025
Objection resolved — Resolved
10/21/2025
Objection resolved — Resolved
09/16/2025
Objection resolved — Addressed
09/08/2025
Objection raised — Admin
09/08/2025
Objection raised — Scope
09/08/2025
Objection raised — Admin
09/08/2025
Objection raised — Scope
Latest 60 of 106 events.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MOHAMMAD AHEAD, PE307/21/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EZFILINGNYCORP203/21/2026
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
01/12/2026Structural Stability – Alterations of existing buildings—special
10/29/2025Tenant Protection Plan Compliance—special
10/29/2025Final—progress
10/29/2025Energy Code Compliance Inspections—progress
10/29/2025Fire-Resistant Penetrations and Joints—special
08/25/2025Tenant Protection Plan Compliance—special
08/25/2025Fire-Resistant Penetrations and Joints—special
08/25/2025Energy Code Compliance Inspections—progress
08/12/2025Final—progress
▾Documents — 15 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/19/2026B01310558-I1Request digital key ↗
08/15/2026B01310558-S2Request digital key ↗
08/15/2026B01270181-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026B01270181-I1Open ↗
08/13/2026B01310558-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/19/2026B01310558-I1Open ↗
▸Seals & Professional Certifications3
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/19/2026B01310558-S2Open ↗
08/13/2026B01310558-I1Open ↗
08/13/2026B01270181-I1Open ↗
▸Other Documents6
▸DOB NOWPlot Diagram2
08/13/2026B01310558-I1Open ↗
08/13/2026B01270181-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026B01270181-I1Open ↗
08/13/2026B01310558-I1Open ↗
▸DOB NOWSite Survey: Initial2
08/13/2026B01310558-I1Open ↗
08/13/2026B01270181-I1Open ↗