← Back
Office with commercial, 1-6 stories
1670 EAST 17 STREET
BROOKLYN · BIN 3253746
💬 Discuss this project
1925Year Built
3Stories
O5Building Class
R7AZoning
—Gross Floor Area
6Units
11 Open Violations ▸FDNY Report ↗
Office with commercial, 1-6 stories · Owner of record: INTERBOROUGH DEVELOPMENT AND CONSULTATIO N CENTER · 2.79 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction1p · 1 filing · 11 docs
Floor 3Under Construction21p · 2 filings · 20 docs
Floor 2Under Construction16p · 1 filing · 20 docs
Floor 1Under Construction2p · 1 filing · 11 docs
CellarUnder Construction1p · 1 filing · 11 docs
2 jobs · most recent 08/18/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/18/2026Permit IssuedREVIT GROUP LLCHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric PUHY-EP288TSNU-A1 288,000 BTU · Vrf Outdoor ×1
05/15/2026Permit IssuedREVIT GROUP LLCHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric PLFY-P08NFMU-ER1.TH 8,000 BTU · Vrf Indoor ×12
2 jobs · most recent 08/18/2026
Water/Sanitary Gas
FiledStatusContractorScope
08/18/2026Permit IssuedD.H. EAGLE PLUMBING, LLCGas, Water/Sanitary
05/15/2026——Water/Sanitary
3 jobs · most recent 07/21/2026
General Wiring
FiledStatusContractorScope
07/21/2026Permit IssuedCHARLES LEO ELECTRICALGeneral Wiring
02/05/2026Permit IssuedDENALI ELECTRIC CORP—
12/20/2025Permit IssuedELECTRICIAN NYC LLCGeneral Wiring
Building Lifecycle
All (86)Filed (8)Permit Issued (3)Violation (24)Objection (39)Special Inspection (12)
08/27/2026
Objection raised — Other
08/18/2026
Filed — Alteration
AN APPLICATION IS FILED FOR THE HVAC FIT-OUT OF AN EXISTING COMMERCIAL SPACE ON THE SECOND AND THIRD FLOORS, PER THE PLANS FILED HEREWITH, NO CHANGE TO USE, EGRESS, OCCUPANCY, OR BULK PROPOSED UNDER THIS APPLICATION.
B01322011-P1
08/14/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alexander Bomstein
08/14/2026
Special inspection requirement — Energy Code Compliance Inspections
Alexander Bomstein
08/14/2026
Special inspection requirement — Final
Alexander Bomstein
08/14/2026
Special inspection requirement — Lighting controls
Alexander Bomstein
08/14/2026
Special inspection requirement — Interior lighting power
Alexander Bomstein
07/28/2026
Permit issued — General Construction
B01353378-I1-GC
07/22/2026
Permit issued — Plumbing
B01322011-S2-PL
07/15/2026
Objection resolved — Addressed
07/15/2026
Objection resolved — Addressed
06/09/2026
Objection resolved — Addressed
06/09/2026
Objection resolved — Addressed
06/09/2026
Objection resolved — Addressed
06/09/2026
Objection resolved — Addressed
06/09/2026
Objection resolved — Addressed
06/09/2026
Objection resolved — Addressed
06/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alexander Bomstein
06/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alexander Bomstein
06/05/2026
Objection raised — Other
06/05/2026
Objection raised — Other
06/05/2026
Objection raised — Other
06/05/2026
Objection raised — Other
06/05/2026
Objection raised — Other
06/05/2026
Objection raised — Other
06/05/2026
Objection raised — Other
06/05/2026
Objection raised — Other
06/04/2026
Objection resolved — Addressed
06/03/2026
Objection raised — Other
05/29/2026
Objection raised — Cost
05/29/2026
Objection resolved — Addressed
05/29/2026
Objection raised — Other
05/29/2026
Objection resolved — Addressed
05/29/2026
Objection raised — Cost
05/29/2026
Objection resolved — Addressed
05/29/2026
Objection raised — Other
05/29/2026
Objection resolved — Addressed
05/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alexander Bomstein
05/15/2026
Filed — Alteration
APPLICATION IS FILED FOR THE INTERIOR FIT-OUT OF AN EXISTING COMMERCIAL SPACE ON THE GROUND FLOOR PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OCCUPANCY, OR BULK PROPOSED UNDER THIS APPLICATION.
B01353378-S1
05/15/2026
Filed — Alteration
AN APPLICATION IS FILED FOR THE HVAC FIT-OUT OF AN EXISTING COMMERCIAL SPACE ON THE SECOND AND THIRD FLOORS, PER THE PLANS FILED HEREWITH, NO CHANGE TO USE, EGRESS, OCCUPANCY, OR BULK PROPOSED UNDER THIS APPLICATION.
B01322011-S3
05/15/2026
Filed — Alteration
AN APPLICATION IS FILED FOR THE HVAC FIT-OUT OF AN EXISTING COMMERCIAL SPACE ON THE SECOND AND THIRD FLOORS, PER THE PLANS FILED HEREWITH, NO CHANGE TO USE, EGRESS, OCCUPANCY, OR BULK PROPOSED UNDER THIS APPLICATION.
B01322011-S2
05/15/2026
Filed — Alteration
AN APPLICATION IS FILED FOR THE HVAC FIT-OUT OF AN EXISTING COMMERCIAL SPACE ON THE SECOND AND THIRD FLOORS, PER THE PLANS FILED HEREWITH, NO CHANGE TO USE, EGRESS, OCCUPANCY, OR BULK PROPOSED UNDER THIS APPLICATION.
B01322011-S1
05/15/2026
Filed — Alteration
APPLICATION IS FILED FOR THE INTERIOR FIT-OUT OF AN EXISTING COMMERCIAL SPACE ON THE GROUND FLOOR PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OCCUPANCY, OR BULK PROPOSED UNDER THIS APPLICATION.
B01353378-S2
04/30/2026
Special inspection requirement — Final
04/30/2026
Special inspection requirement — Mechanical Systems
Alexander Bomstein
04/30/2026
Special inspection requirement — Final
04/30/2026
Special inspection requirement — Mechanical Systems
Alexander Bomstein
04/05/2026
Objection resolved — Resolved
04/05/2026
Objection resolved — Resolved
04/05/2026
Objection resolved — Resolved
03/27/2026
Objection raised — Cost
03/27/2026
Objection raised — Admin
03/27/2026
Objection raised — Fire_Protection
03/10/2026
Filed — Alteration
APPLICATION IS FILED FOR THE INTERIOR FIT-OUT OF AN EXISTING COMMERCIAL SPACE ON THE GROUND FLOOR PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OCCUPANCY, OR BULK PROPOSED UNDER THIS APPLICATION.
B01353378-I1
12/29/2025
Permit issued — General Construction
B01322011-I1-GC
12/22/2025
Objection resolved — Addressed
12/22/2025
Objection resolved — Addressed
12/22/2025
Objection resolved — Addressed
12/16/2025
Objection raised — Other
12/16/2025
Objection raised — Other
Latest 60 of 86 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
INTERBOROUGH DEVELOPMENTAL CONS1009/01/2026
AGEAN TRAVEL AGENCY INC103/22/2026
INTERBOROUGH DEVELOPMENT AND CONSULTATIO N CENTER103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BUVE GROUP LLC308/18/2026
A&B WORLD CONSULTING505/15/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
REVIT GROUP LLCGeneral Contractor207/29/2026
A. HTG AND PLBG WORKS INCPlumbing107/23/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A&B WORLD CONSULTING, INC5704808/18/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedREVIT GROUP LLC07/28/2026
DOB NOWPlumbingPermit IssuedA. HTG AND PLBG WORKS INC07/22/2026
DOB NOWGeneral ConstructionPermit IssuedREVIT GROUP LLC12/29/2025
BISPLISSUEDBRIDGEWATER PLBG & HTG INC01/21/2003
BISOTISSUEDHABONEH CONSTRUCTION INC01/17/2003
BISOTISSUEDSOLOMON CONSTRUCTION, INC.07/27/1995
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
08/14/2026Fire-Resistant Penetrations and JointsAlexander Bomsteinspecial
08/14/2026Energy Code Compliance InspectionsAlexander Bomsteinprogress
08/14/2026FinalAlexander Bomsteinprogress
08/14/2026Lighting controlsAlexander Bomsteinenergy_progress
08/14/2026Interior lighting powerAlexander Bomsteinenergy_progress
06/09/2026Fire-Resistant Penetrations and JointsAlexander Bomsteinspecial
06/09/2026Fire-Resistant Penetrations and JointsAlexander Bomsteinspecial
05/29/2026Fire-Resistant Penetrations and JointsAlexander Bomsteinspecial
04/30/2026Final—progress
04/30/2026Mechanical SystemsAlexander Bomsteinspecial
04/30/2026Final—progress
04/30/2026Mechanical SystemsAlexander Bomsteinspecial
▾Documents — 33 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/19/2026B01322011-P1Request digital key ↗
08/17/2026B01322011-P1Request digital key ↗
08/17/2026B01353378-S2Request digital key ↗
Showing 3 of 9 on file for this type
▸Seals & Professional Certifications16
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/17/2026B01322011-S2Open ↗
08/17/2026B01322011-P1Open ↗
08/17/2026B01322011-S3Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/01/2026B01353378-S1Open ↗
08/28/2026B01322011-S1Open ↗
08/28/2026B01322011-S1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/25/2026B01322011-P1Open ↗
08/25/2026B01322011-P1Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/17/2026B01322011-P1Open ↗
08/17/2026B01353378-S2Open ↗
08/15/2026B01353378-S1Open ↗
Showing 3 of 8 on file for this type