← Back
Condo, residential unit in walk-up building
1 Vernon Jackson Condominium
98 HAVEMEYER STREET · BIN 3256345
💬 Discuss this project
2002Year Built
4Stories
R2Building Class
R6BZoning
23,622 sfGross Floor Area
24Units
LL97 CoveredRent Stabilized0 Open ViolationsFDNY Report ↗
Condo, residential unit in walk-up building · Owner of record: UNAVAILABLE OWNER · 9,730 sf lot · 2.43 FAR built · Flood zone X
Locations of Work
Architecture
Permit Issued — active, not yet Signed-off
RoofUnder Construction1p · 1 filing · 8 docs
2 jobs · most recent 03/07/2026
General Wiring
FiledStatusContractorScope
03/07/2026Permit IssuedRICHARD NEU—
01/18/2022CompleteASSET ELECTRIC CORPGeneral Wiring
1 job · most recent 03/04/2026
Sidewalk Shed
FiledStatusContractorScope
03/04/2026Permit IssuedTITAN SERVICES USA INCSidewalk Shed
1 job · most recent 03/03/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
03/03/2026Permit IssuedBIG APPLE RENOVATION & RESuspended Scaffold (SC)
Building Lifecycle
All (37)Filed (3)Permit Issued (5)Violation (13)Objection (8)Special Inspection (8)
09/03/2026
Permit issued — Sidewalk Shed
B01366479-I1-SH
06/09/2026
Permit issued — Sidewalk Shed
B01366479-I1-SH
03/20/2026
Permit issued — General Construction
B01218619-I1-GC
03/10/2026
Permit issued — Suspended Scaffold
B01366055-I1-SC
03/09/2026
Permit issued — Sidewalk Shed
B01366479-I1-SH
03/04/2026
Filed — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01366479-I1
03/03/2026
Filed — Alteration
Suspended Scaffold Installation for Facade Restoration and Inspection
B01366055-I1
03/02/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Jerry Pitera
03/02/2026
Special inspection requirement — Post-installed Anchors
Jerry Pitera
07/22/2025
Objection resolved — Addressed
07/22/2025
Objection resolved — Addressed
07/22/2025
Objection resolved — Addressed
07/15/2025
Objection resolved — Addressed
06/13/2025
Objection raised — Admin
06/13/2025
Objection raised — Cost
06/13/2025
Objection raised — Cost
06/13/2025
Objection raised — Energy
05/29/2025
Filed — Alteration
Facade repair including masonry repair, lintel replace, concrete patching, flashing installation, windowsill replacement, replace /repair precast concrete, lintel WP and replacement as per plans filed. No change in use, egress or occupancy.
B01218619-I1
04/30/2025
Special inspection requirement — Tenant Protection Plan Compliance
Craig Jirak
04/30/2025
Special inspection requirement — Masonry
Craig Jirak
04/30/2025
Special inspection requirement — Post-installed Anchors
Craig Jirak
04/30/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
BRIAN O'CONNOR
04/30/2025
Special inspection requirement — Final
Craig Jirak
04/30/2025
Special inspection requirement — Energy Code Compliance Inspections
Craig Jirak
11/20/2023
Violation issued (HPD, closed)
I
03/30/2023
Violation issued (HPD, closed)
A
03/08/2022
Violation issued (HPD, closed)
A
03/08/2022
Violation issued (HPD, closed)
I
04/16/2021
Violation issued (HPD, closed)
A
08/03/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/02/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/07/2017
Violation issued (HPD, closed)
I
04/29/2001
Violation issued (ECB, closed)
Site Safety
02/14/2001
Violation issued (ECB, closed)
Construction
02/14/2001
Violation issued (ECB, closed)
Construction
01/11/2001
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/11/2001
Violation issued (ECB, closed)
Construction
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TITAN SERVICES USA609/07/2026
LEITER MANAGEMENT204/09/2026
1 VERNON JACKSON CONDOMINIUM304/09/2026
OWNER OF 98-106 HAVEMEYER203/22/2026
SUPERIOR CONSTRUCTION CON203/22/2026
KSPG REALTY903/21/2026
WILLIAMSBURG MEWS CONDOMINIUM203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ASR ENGINEERING PC103/04/2026
RAK DESIGN INC.105/29/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CSR EXPEDITERS103/21/2026
PROFESSIONAL DESIGN CONSULTANTS LL203/21/2026
ADVANCED BUILDERS SERVICES103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TITAN SERVICES USA INCGeneral Contractor309/07/2026
ALLSTATE RENOVATION INCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ADVANCED ENGINEERING & IN1224103/03/2026
RAK DESIGN INC.7699105/29/2025
ROCK ARCH ENG CORP1760105/29/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedTITAN SERVICES USA INC09/03/2026
DOB NOWSidewalk ShedPermit IssuedTITAN SERVICES USA INC06/09/2026
DOB NOWGeneral ConstructionPermit IssuedALLSTATE RENOVATION INC03/20/2026
DOB NOWSuspended ScaffoldPermit IssuedBIG APPLE RENOVATION & RE03/10/2026
DOB NOWSidewalk ShedPermit IssuedTITAN SERVICES USA INC03/09/2026
BISPLISSUEDMILLENIUM MECHANICAL CONTRACTORS03/11/2002
BISSPISSUEDTRICOUNTY FORE EQUIPMENT03/11/2002
BISEQISSUEDTWIN SCAFFOLDING06/28/2001
BISPLISSUEDMILLENNIUM MECH CONT INC06/07/2001
BIS—ISSUEDSUPERIOR CONSTRUCTION CONSULANT03/08/2001
BISEQISSUEDSUPERIOR CONTRUCTION CONSULTANT03/08/2001
BISEQISSUEDUPERIOR CONSTRUCTION CONSULTANT03/07/2001
BIS—ISSUEDSUPERIOR CONSTRUCTION CONSULANT08/08/2000
BISEQISSUEDSUPERIOR CONTRUCTION CONSULTANT08/08/2000
BISEQISSUEDUPERIOR CONSTRUCTION CONSULTANT08/07/2000
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
03/02/2026Alternative Materials - OTCR Buildings Bulletin NumberJerry Piteraspecial
03/02/2026Post-installed AnchorsJerry Piteraspecial
04/30/2025Tenant Protection Plan ComplianceCraig Jirakspecial
04/30/2025MasonryCraig Jirakspecial
04/30/2025Post-installed AnchorsCraig Jirakspecial
04/30/2025Structural Stability – Alterations of existing buildingsBRIAN O'CONNORspecial
04/30/2025FinalCraig Jirakprogress
04/30/2025Energy Code Compliance InspectionsCraig Jirakprogress
▾Documents — 14 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/21/2026B01218619-I1Request digital key ↗
08/18/2026B01366055-I1Request digital key ↗
▸Seals & Professional Certifications10
▸DOB NOWSpecial Inspector Seal & Signature6
08/23/2026B01218619-I1Open ↗
08/23/2026B01218619-I1Open ↗
08/23/2026B01218619-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/21/2026B01218619-I1Open ↗
08/13/2026B01366479-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/23/2026B01218619-I1Open ↗
08/23/2026B01218619-I1Open ↗
▸Other Documents2
▸DOB NOWManufacturer's Specifications1
08/13/2026B01366055-I1Open ↗
▸DOB NOWCalculations1
08/13/2026B01366055-I1Open ↗