← Back
One family attached or semi-detached
2706 NEPTUNE AVENUE
BROOKLYN · BIN 3259019
💬 Discuss this project
1989Year Built
2Stories
A5Building Class
R5Zoning
1,344 sfGross Floor Area
1Units
One family attached or semi-detached · 1,400 sf lot · 0.96 FAR built · Flood zone AE
Locations of Work
No floor-level scope or drawing coverage on file for this building.
1 job · most recent 05/16/2025
FiledStatusContractorScope
05/16/2025CompleteMAK ELECTRICAL CONTR CORP1 meters
Building Lifecycle
All (9)Filed (2)Permit Issued (1)Signed Off (1)Special Inspection (5)
03/13/2026
Signed off — Alteration
ROOFTOP SOLAR PANEL INSTALLATION
B01226369-I1
08/05/2025
Filed — Alteration
ROOFTOP SOLAR PANEL INSTALLATION
B01226369-P1
08/04/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
VYACHESLAV NECHAYEV
08/04/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
VYACHESLAV NECHAYEV
08/04/2025
Special inspection requirement — Energy Code Compliance Inspections
VYACHESLAV NECHAYEV
08/04/2025
Special inspection requirement — Final
VYACHESLAV NECHAYEV
08/04/2025
Special inspection requirement — Air barrier - visual inspection
VYACHESLAV NECHAYEV
05/23/2025
Permit issued — Solar
B01226369-I1-SL
05/20/2025
Filed — Alteration
ROOFTOP SOLAR PANEL INSTALLATION
B01226369-I1
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ETRECTE LLC208/05/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PATRIOT ENERGY SOLUTIONS CORP403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MAK ELECTRICAL CONTR CORPElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ETRECTE LLC8116208/05/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offANDAMIO SCAFFOLDING LLC05/23/2025
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
08/04/2025Fire-Resistant Penetrations and JointsVYACHESLAV NECHAYEVspecial
08/04/2025Structural Stability – Alterations of existing buildingsVYACHESLAV NECHAYEVspecial
08/04/2025Energy Code Compliance InspectionsVYACHESLAV NECHAYEVprogress
08/04/2025FinalVYACHESLAV NECHAYEVprogress
08/04/2025Air barrier - visual inspectionVYACHESLAV NECHAYEVenergy_progress
▾Documents — 10 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/21/2026B01226369-P1Request digital key ↗
08/21/2026B01226369-I1Request digital key ↗
▸Seals & Professional Certifications7
▸DOB NOWProgress Inspector Seal & Signature3
08/25/2026B01226369-P1Open ↗
08/25/2026B01226369-P1Open ↗
08/25/2026B01226369-P1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/21/2026B01226369-I1Open ↗
08/13/2026B01226369-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/25/2026B01226369-P1Open ↗
08/25/2026B01226369-P1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026B01226369-I1Open ↗