← Back
One story retail building
1606 FULTON STREET
BROOKLYN · BIN 3319479
💬 Discuss this project
1920Year Built
1Stories
K1Building Class
R7DZoning
4,524 sfGross Floor Area
2Units
2 Open Violations ▸FDNY Report ↗
One story retail building · Owner of record: 36 RALPH AVE LLC · 6,000 sf lot · 0.75 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 15p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AUTOMATED DESIGN ENGINEERING, PLLC102/08/2024
CD ARCHITECT STUDIO, LLP201/22/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CD ARCHITECT STUDIO403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BI BI DEVELOPMENT GROUP IGeneral Contractor107/08/2026
GALLAGHER O'CONNOR DEVELOPMENTGeneral Contractor103/21/2026
CN PLUMBING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AUTOMATED DESIGN CONSULTA895102/08/2024
CD ARCHITECT STUDIO, LLP2573201/22/2024
Building Lifecycle
All (23)Filed (3)Permit Issued (3)Violation (12)Inspection (5)
02/13/2026
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
01/07/2026
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
08/13/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/02/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/31/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/20/2024
Permit issued — Plumbing
B00987537-S1-PL
05/10/2024
Permit issued — General Construction
B00987537-I1-GC
03/26/2024
Permit issued — General Construction
B00987537-I1-GC
02/08/2024
Filed — Alteration
Install mechanical system subsequent to -I1
B00987537-S2
01/22/2024
Filed — Alteration
Install mechanical system subsequent to -I1
B00987537-S1
01/18/2024
Filed — Alteration
Install mechanical system subsequent to -I1
B00987537-I1
01/04/2022
Violation issued (FDNY_ORDER, closed)
07/28/2014
Violation issued (FDNY_NOV, closed)
01/29/2014
Violation issued (FDNY_NOV, closed)
01/29/2014
Violation issued (FDNY_NOV, closed)
04/02/2008
Violation issued (FDNY_NOV, closed)
08/29/1995
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/01/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/01/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/16/1993
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/16/1993
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/01/1993
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/01/1993
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedCN PLUMBING INC05/20/2024
DOB NOWGeneral ConstructionPermit IssuedGALLAGHER O'CONNOR DEVELOPMENT05/10/2024
DOB NOWGeneral ConstructionPermit IssuedBI BI DEVELOPMENT GROUP I03/26/2024
1 project · most recent 02/08/2024
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
02/08/2024Permit IssuedGALLAGHER O'CONNOR DEVELOHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric PEFY-P54NMAU-E4 54,000 BTU · Vrf Indoor ×1
PUHY-P72TNU-A 72,000 BTU · Vrf Outdoor ×1
Ventilation
Greenheck Mini-Vent 450 with frost control 250 CFM · Erv ×1
1 project · most recent 02/08/2024
Gas Water/Sanitary
FiledStatusContractorScope
02/08/2024Permit IssuedCN PLUMBING INCGas, Water/Sanitary
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
02/13/2026Fail-Final CND-Occupancy InspectionFailView ↗
01/07/2026Fail-Final CND-Occupancy InspectionFailView ↗
08/13/2025Pass-Final CND-Occupancy InspectionPassView ↗
10/02/2024Pass-Final CND-Occupancy InspectionPassView ↗
05/31/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
02/07/2024Mechanical SystemsGregory Mortmanspecial
02/07/2024FinalGregory Mortmanprogress
02/07/2024Energy Code Compliance InspectionsGregory Mortmanprogress
02/07/2024HVAC-R and service water heating system controlsGregory Mortmanenergy_progress
02/07/2024Maintenance informationGregory Mortmanenergy_progress
02/07/2024HVAC-R and service water heating equipmentGregory Mortmanenergy_progress
02/07/2024HVAC-R and service water piping design and insulationGregory Mortmanenergy_progress
02/07/2024Shutoff dampersGregory Mortmanenergy_progress
02/07/2024Ventilation and air distribution systemGregory Mortmanenergy_progress
01/19/2024Fire-Resistant Penetrations and JointsPeter D'Angelospecial
01/19/2024HVAC-R and service water heating equipmentPeter D'Angeloenergy_progress
▾Documents — 23 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/26/2026B00987537-P2Request digital key ↗
08/26/2026B00987537-S2Request digital key ↗
08/26/2026B00987537-S1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications13
▸DOB NOWProgress Inspector Seal & Signature6
08/28/2026B00987537-P2Open ↗
08/28/2026B00987537-P2Open ↗
08/28/2026B00987537-P2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/26/2026B00987537-S2Open ↗
08/26/2026B00987537-S1Open ↗
08/26/2026B00987537-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/28/2026B00987537-P2Open ↗
08/24/2026B00987537-S2Open ↗
08/22/2026B00987537-S1Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/26/2026B00987537-S2Open ↗
08/26/2026B00987537-S1Open ↗
08/26/2026B00987537-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWOER: Notice to Proceed2
08/13/2026B00987537-I1Open ↗
08/13/2026B00987537-P2Open ↗