Multi-story retail building (2+)
791 BROADWAY
BROOKLYN · BIN 3319554
💬 Discuss this project
1989Year Built
2Stories
K2Building Class
C4-3Zoning
22,000 sfGross Floor Area
1Units
0 Open Violations
Multi-story retail building (2+) · Owner of record: 789-791 BROADWAY LLC · 7,500 sf lot · 2.93 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingFire Protection
Permit Issued — active, not yet Signed-off
Floor 2Under Construction12p · 3 filings · 20 docs
Floor 1Under Construction10p · 3 filings · 20 docs
CellarUnder Construction11p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
AMBROSINO CONSTRUCTION709/22/2026
REBUILT REALTY303/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
URBAN ARCHITECTURAL DESIGN, PC208/07/2026
AYALA ENGINEERING PC407/09/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
VILLAGE P & H NY INCFire Protection109/22/2026
KALE CONSTRUCTION INCGeneral Contractor107/08/2026
JOHN FITZGERALD PLBG &HTGPlumbing107/16/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AYALA ENGINEERING P.C.9207407/09/2026
Building Lifecycle
All (86)Filed (6)Permit Issued (3)Violation (21)Inspection (4)Objection (36)Special Inspection (16)
09/23/2026
Objection resolved — Resolved
09/22/2026
Objection raised — Scope
09/21/2026
Permit issued — Sprinklers
B01425982-S1-EW-SP
09/21/2026
Objection resolved — Addressed
09/11/2026
Objection raised — Cost
09/11/2026
Objection resolved — Addressed
09/10/2026
Objection raised — Scope
09/08/2026
Objection resolved — Addressed
09/08/2026
Objection resolved — Addressed
09/08/2026
Objection resolved — Addressed
09/08/2026
Objection resolved — Addressed
08/27/2026
Objection raised — Scope
08/27/2026
Objection raised — Scope
08/27/2026
Objection raised — Scope
08/27/2026
Objection raised — Admin
08/07/2026
Filed — Alteration CO
JOB FILED TO GET NEW CERTIFICATE OF OCCUPANCY OF EXISTING 2-STORY BUILDING FROM MERCANTILE TOASSEMBLY ARCADE USE.. GET NEW CO.. PMS/SP JOB FILED B01425982-S1/S2..
B01425982-S1
08/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
08/04/2026
Objection raised — Scope
08/04/2026
Objection resolved — Addressed
08/04/2026
Objection raised — Scope
08/04/2026
Objection resolved — Addressed
08/04/2026
Objection raised — Scope
08/04/2026
Objection resolved — Addressed
08/04/2026
Objection raised — Scope
08/04/2026
Objection resolved — Addressed
08/04/2026
Objection raised — Scope
08/04/2026
Objection resolved — Addressed
08/04/2026
Objection raised — Scope
08/04/2026
Objection resolved — Addressed
08/04/2026
Objection raised — Cost
08/04/2026
Objection resolved — Addressed
08/04/2026
Objection raised — Scope
08/04/2026
Objection resolved — Addressed
08/04/2026
Objection raised — Accessibility
08/04/2026
Objection resolved — Addressed
08/04/2026
Objection raised — Admin
08/04/2026
Objection resolved — Addressed
08/04/2026
Objection raised — Scope
08/04/2026
Objection resolved — Addressed
08/04/2026
Special inspection requirement — Sprinkler Systems
07/30/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/30/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/28/2026
Filed — Alteration CO
JOB FILED TO GET NEW CERTIFICATE OF OCCUPANCY OF EXISTING 2-STORY BUILDING FROM MERCANTILE TOASSEMBLY ARCADE USE.. GET NEW CO.. PMS/SP JOB FILED B01425982-S1/S2..
B01425982-I1
07/28/2026
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
07/15/2026
Permit issued — Plumbing
B01404105-I1-PL
07/14/2026
Special inspection requirement — HVAC-R and service water heating equipment
Pablo Ayala
07/14/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Pablo Ayala
07/14/2026
Special inspection requirement — HVAC-R and service water heating system controls
Pablo Ayala
07/14/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Pablo Ayala
07/14/2026
Special inspection requirement — Energy Code Compliance Inspections
Pablo Ayala
07/13/2026
Special inspection requirement — Interior lighting power
07/13/2026
Special inspection requirement — Energy Code Compliance Inspections
07/13/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/10/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Pablo Ayala
07/09/2026
Filed — Alteration
JOB FILED INTERIOR RENOVATION OF COMMERCIAL STORE INCLUDING REMOVE DROP CEILING AND INSTALL NEW BATHROOM AS PER PLAN. NO CHANGE OF USE, EGRESS, OR OCCUPANCYUNDER THIS APPLICATION.
B01404096-P1
07/09/2026
Filed — Alteration
JOB FILED EXIST. COMMERCIAL STORE INSTALL NEW BATHROOMS AND RELATED PLUMBING FIXTURE PERPLAN. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01404105-P1
07/02/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Pablo Ayala
06/29/2026
Special inspection requirement — Energy Code Compliance Inspections
Pablo Ayala
06/29/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Pablo Ayala
Latest 60 of 86 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersPermit IssuedVILLAGE P & H NY INC09/21/2026
DOB NOWPlumbingPermit IssuedJOHN FITZGERALD PLBG &HTG07/15/2026
DOB NOWGeneral ConstructionPermit IssuedKALE CONSTRUCTION INC06/10/2026
1 project · most recent 08/07/2026
Sprinkler System
FiledStatusContractorScope
08/07/2026Permit IssuedPARAMOUNT SERVICES, LLCSprinkler System
1 project · most recent 07/09/2026
Water/Sanitary
FiledStatusContractorScope
07/09/2026Permit IssuedJOHN FITZGERALD PLBG &HTGWater/Sanitary
3 projects · most recent 07/24/2026
General Wiring
FiledStatusContractorScope
07/24/2026Permit IssuedKJK ELECTRIC INCGeneral Wiring
12/14/2022CompleteNAPSTAR ELECTRIC INCGeneral Wiring
12/01/2022CompleteNAPSTAR ELECTRIC INC—
1 project · most recent 08/07/2026
FiledStatusContractorScope
08/07/2026Permit IssuedPARAMOUNT SERVICES, LLC1 scope_items
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
07/30/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/30/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
07/28/2026Fail-Final General Construction Non-Directive 14FailView ↗
07/02/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
08/06/2026Fire-Resistant Penetrations and Joints—special
08/04/2026Sprinkler Systems—special
07/14/2026HVAC-R and service water heating equipmentPablo Ayalaenergy_progress
07/14/2026HVAC-R and service water piping design and insulationPablo Ayalaenergy_progress
07/14/2026HVAC-R and service water heating system controlsPablo Ayalaenergy_progress
07/14/2026Fire-Resistant Penetrations and JointsPablo Ayalaspecial
07/14/2026Energy Code Compliance InspectionsPablo Ayalaprogress
07/13/2026Interior lighting power—energy_progress
07/13/2026Energy Code Compliance Inspections—progress
07/13/2026Fire-Resistant Penetrations and Joints—special
07/10/2026Fire-Resistant Penetrations and JointsPablo Ayalaspecial
06/29/2026Fire-Resistant Penetrations and JointsPablo Ayalaspecial
06/29/2026Energy Code Compliance InspectionsPablo Ayalaprogress
06/29/2026HVAC-R and service water piping design and insulationPablo Ayalaenergy_progress
06/29/2026HVAC-R and service water heating equipmentPablo Ayalaenergy_progress
06/29/2026HVAC-R and service water heating system controlsPablo Ayalaenergy_progress
▾Documents — 25 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/16/2026B01404105-P1Request digital key ↗
08/16/2026B01404105-I1Request digital key ↗
08/16/2026B01404096-P1Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications13
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/16/2026B01404105-I1Open ↗
08/16/2026B01404105-P1Open ↗
08/16/2026B01404096-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/02/2026B01404105-P1Open ↗
09/02/2026B01404105-P1Open ↗
08/22/2026B01404105-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/02/2026B01404105-P1Open ↗
08/25/2026B01404096-I1Open ↗
08/22/2026B01404105-I1Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/16/2026B01404105-P1Open ↗
08/16/2026B01404105-I1Open ↗
08/16/2026B01404096-P1Open ↗
Showing 3 of 6 on file for this type