DOB05/15/2014VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
DOB03/01/2013VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT
DOB12/13/2011VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT
DOB12/31/2009V-DOB VIOLATION - ACTIVE
DOB01/01/2009V-DOB VIOLATION - ACTIVE
DOB01/03/2008V-DOB VIOLATION - ACTIVE
DOB01/19/2007V-DOB VIOLATION - ACTIVE
DOB01/06/2006V-DOB VIOLATION - ACTIVE
DOB01/31/2005V-DOB VIOLATION - ACTIVE
DOB01/31/2005V-DOB VIOLATION - ACTIVE
DOB02/13/2004V-DOB VIOLATION - ACTIVE
DOB03/19/2003V-DOB VIOLATION - ACTIVE
DOB03/26/2002V-DOB VIOLATION - ACTIVE
DOB06/12/2001WORK WITHOUT PERMIT, WORK NOTED: AT FRENT ENTRANCE LEVEL EXIST TRENCHES APPROXIMATELY 6' WIDE X10' DEEP FULL OF DEBRIS INCLUDING RUST PLUMBING PIPES, STONE, BRICK ECT GLASS, STOP ALL ESCAVATION WORK: REMEDY: MAKE ENTIRE ARE SAFE FOR PUBLIC/TENANTS. OBTAIN ALL NECESSARY PERMIT CONTACT D.O.B BEFORE RETURNING TO WORK AT (718)802-3685
DOB06/12/2001FAILURE TO FILE TRI PRIOR TO START OF CONTROLLED WORK. AT TIME OF INSPECTION MULTIPLE 6'X10' DEEP TRENCHES WERE ESCAVATED WITH NO BRACING, NO ADEGUANCY OF SOIL CAPACITY FOR FOUNDATION LOADING FOR SUPPORTS OF WALKWAYS. REMEDY: PROVIDE/FILE TRI PRIOR TO START OF CONTRALLED WORK
DOB02/27/2001V-DOB VIOLATION - ACTIVE
DOB02/07/2000V-DOB VIOLATION - ACTIVE
DOB03/16/1999V-DOB VIOLATION - ACTIVE
DOB05/04/1998V-DOB VIOLATION - ACTIVE
DOB08/29/1995V-DOB VIOLATION - ACTIVE
DOB08/29/1995V-DOB VIOLATION - ACTIVE
DOB07/25/1994V-DOB VIOLATION - ACTIVE
DOB06/01/1994V-DOB VIOLATION - ACTIVE
DOB08/16/1993V-DOB VIOLATION - ACTIVE
DOB08/16/1993V-DOB VIOLATION - ACTIVE
DOB06/01/1993V-DOB VIOLATION - ACTIVE
ECB06/12/2001WORK WITHOUT A PERMIT: WORK NOTED: AT FRONT ENTRANCE LEVEL EXIST TRENCHES APPROX 6'WIDEX10'DEEP FULL OF DEBRIS INCLUDING RUST PLUMBING PIPES, STONE, BRICK ECT..., GLASS, STOP ALL WORK! REMEDY: MAKE ENTIRE AREANothing owed — awaiting certificate of correction