← Back
Two stories - detached, small or mid-size
2219 AVENUE I
BROOKLYN · BIN 3320960
💬 Discuss this project
1920Year Built
2.5Stories
A1Building Class
R4Zoning
1,670 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 2,650 sf lot · 0.63 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 214p · 1 filing · 19 docs
Floor 114p · 1 filing · 19 docs
Cellar15p · 1 filing · 19 docs
1 job · most recent 07/11/2024
Water/Sanitary
FiledStatusContractorScope
07/11/2024Permit IssuedKATAN P & H INCWater/Sanitary
1 job · most recent 12/27/2023
FiledStatusContractorScope
12/27/2023CompleteSELECT ELECTRICAL GROUP I1 meters, 1 new_meters
Building Lifecycle
All (34)Filed (5)Permit Issued (5)Signed Off (2)Violation (2)Inspection (6)Special Inspection (14)
04/30/2026
Signed off — Alteration
APPLICATION FILED HEREWITH TO PROPOSE INTERIOR RENOVATION TO EXISTING 1 FAMILY2 STORY & ATTIC W/CELLAR BUILDING AS SHOWN ON PLANS AS PER C/O # 35699 NB 3269/23.NO CHANGE IN USE , EGRESS OR OCCUPANCY.
B00966119-S1
02/27/2026
Signed off — Alteration
EXISTING 2 STORY & CELLAR -WORK LIMITED TO CREATING CURB CUT. NO CHANGE IN OCCUPANCY, BULK, OR EGRESS.
B01162099-I1
02/24/2026
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
10/22/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/02/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/02/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/22/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/16/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
04/08/2025
Permit issued — Plumbing
B00966119-S2-PL
01/03/2025
Permit issued — Curb Cut
B01162099-I1-CC
01/02/2025
Filed — Alteration
EXISTING 2 STORY & CELLAR -WORK LIMITED TO CREATING CURB CUT. NO CHANGE IN OCCUPANCY, BULK, OR EGRESS.
B01162099-I1
07/15/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
MOHAMED MAHMOUD
07/15/2024
Special inspection requirement — Energy Code Compliance Inspections
MOHAMED MAHMOUD
07/11/2024
Filed — Alteration
APPLICATION FILED HEREWITH TO PROPOSE INTERIOR RENOVATION TO EXISTING 1 FAMILY2 STORY & ATTIC W/CELLAR BUILDING AS SHOWN ON PLANS AS PER C/O # 35699 NB 3269/23.NO CHANGE IN USE , EGRESS OR OCCUPANCY.
B00966119-P1
07/10/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
NANIK MASSAND
07/10/2024
Special inspection requirement — Energy Code Compliance Inspections
NANIK MASSAND
07/09/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/28/2024
Permit issued — Plumbing
B00966119-S2-PL
03/19/2024
Filed — Alteration
APPLICATION FILED HEREWITH TO PROPOSE INTERIOR RENOVATION TO EXISTING 1 FAMILY2 STORY & ATTIC W/CELLAR BUILDING AS SHOWN ON PLANS AS PER C/O # 35699 NB 3269/23.NO CHANGE IN USE , EGRESS OR OCCUPANCY.
B00966119-S2
03/13/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/08/2024
Filed — Alteration
APPLICATION FILED HEREWITH TO PROPOSE INTERIOR RENOVATION TO EXISTING 1 FAMILY2 STORY & ATTIC W/CELLAR BUILDING AS SHOWN ON PLANS AS PER C/O # 35699 NB 3269/23.NO CHANGE IN USE , EGRESS OR OCCUPANCY.
B00966119-S1
03/08/2024
Permit issued — Construction Fence
B00966119-S1-FN
03/08/2024
Permit issued — General Construction
B00966119-I1-GC
11/28/2023
Filed — Alteration
APPLICATION FILED HEREWITH TO PROPOSE INTERIOR RENOVATION TO EXISTING 1 FAMILY2 STORY & ATTIC W/CELLAR BUILDING AS SHOWN ON PLANS AS PER C/O # 35699 NB 3269/23.NO CHANGE IN USE , EGRESS OR OCCUPANCY.
B00966119-I1
11/23/2023
Special inspection requirement — Fire-Resistance Rated Construction
MOHAMED MAHMOUD
11/23/2023
Special inspection requirement — Fenestration areas
MOHAMED MAHMOUD
11/23/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
MOHAMED MAHMOUD
11/23/2023
Special inspection requirement — Concrete - Cast-In-Place
MOHAMED MAHMOUD
11/23/2023
Special inspection requirement — Air barrier - visual inspection
MOHAMED MAHMOUD
11/23/2023
Special inspection requirement — Insulation placement and R values
MOHAMED MAHMOUD
11/23/2023
Special inspection requirement — Fenestration air leakage
MOHAMED MAHMOUD
11/23/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
MOHAMED MAHMOUD
11/23/2023
Special inspection requirement — Final
Feng Zhang
11/23/2023
Special inspection requirement — Energy Code Compliance Inspections
MOHAMED MAHMOUD
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GREENLINE BLDG CONSULTANTS304/09/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/14/2023$788K—EYE & 23RD LLC → Private party$472/sf building
10/12/2018$950K—— → —$569/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LESLIE M. GOOD ARCHITECTS101/02/2025
MSM ENGINEERING SERVICES, PLLC407/11/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MISTER EXPEDITER403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KHAIKA CONSTRUCTION INCGeneral Contractor407/08/2026
KATAN P & H INCPlumbing207/08/2026
L&T CONSULTANTS LLCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
M. INT'L ENGINEERING PLLC3129107/11/2024
MSM ENGINEERING SERVICES,8449203/19/2024
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedKATAN P & H INC04/08/2025
DOB NOWCurb CutSigned-offL&T CONSULTANTS LLC01/03/2025
DOB NOWPlumbingPermit IssuedKATAN P & H INC03/28/2024
DOB NOWConstruction FenceSigned-offKHAIKA CONSTRUCTION INC03/08/2024
DOB NOWGeneral ConstructionPermit IssuedKHAIKA CONSTRUCTION INC03/08/2024
BISPLISSUEDN/A12/11/1995
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
02/24/2026Pass-Final Curb Cut Non-Directive 14PassView ↗
06/02/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/02/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/22/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/16/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
07/09/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
07/15/2024Fire-Resistant Penetrations and JointsMOHAMED MAHMOUDspecial
07/15/2024Energy Code Compliance InspectionsMOHAMED MAHMOUDprogress
07/10/2024Fire-Resistant Penetrations and JointsNANIK MASSANDspecial
07/10/2024Energy Code Compliance InspectionsNANIK MASSANDprogress
11/23/2023Fire-Resistance Rated ConstructionMOHAMED MAHMOUDprogress
11/23/2023Fenestration areasMOHAMED MAHMOUDenergy_progress
11/23/2023Fenestration and door U-factor and product ratingsMOHAMED MAHMOUDenergy_progress
11/23/2023Concrete - Cast-In-PlaceMOHAMED MAHMOUDspecial
11/23/2023Air barrier - visual inspectionMOHAMED MAHMOUDenergy_progress
11/23/2023Insulation placement and R valuesMOHAMED MAHMOUDenergy_progress
11/23/2023Fenestration air leakageMOHAMED MAHMOUDenergy_progress
11/23/2023Fire-Resistant Penetrations and JointsMOHAMED MAHMOUDspecial
11/23/2023FinalFeng Zhangprogress
11/23/2023Energy Code Compliance InspectionsMOHAMED MAHMOUDprogress
▾Documents — 21 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/25/2026B00966119-I1Request digital key ↗
08/25/2026B00966119-S1Request digital key ↗
08/25/2026B00966119-S2Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications13
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/25/2026B00966119-S2Open ↗
08/23/2026B01162099-I1Open ↗
08/13/2026B00966119-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/01/2026B00966119-P1Open ↗
08/24/2026B00966119-I1Open ↗
08/24/2026B00966119-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/01/2026B00966119-P1Open ↗
08/24/2026B00966119-I1Open ↗
08/24/2026B00966119-S2Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/25/2026B00966119-S2Open ↗
08/13/2026B00966119-I1Open ↗
08/13/2026B00966119-P1Open ↗