← Back
Elevator cooperative
2209 KNAPP STREET
BROOKLYN · BIN 3321836
💬 Discuss this project
1951Year Built
6Stories
D4Building Class
R5Zoning
174,580 sfGross Floor Area
162Units
LL97 CoveredRent Stabilized24 Open Violations ▸FDNY Report ↗
Elevator cooperative · 78,644 sf lot · 2.22 FAR built · Flood zone X500
Locations of Work
ArchitectureStructural
Permit Issued — active, not yet Signed-off
RoofUnder Construction4p · 2 filings · 6 docs
Floor 5Under Construction3p · 1 filing · 3 docs
Floor 4
Floor 3
Floor 2
Floor 1
4 jobs · most recent 07/02/2025
General Wiring
FiledStatusContractorScope
07/02/2025Permit IssuedRICHARD NEU—
11/06/2024Permit IssuedEUROLIGHT ELECTRIC CORPGeneral Wiring
10/07/2022CompleteSTAR ELEC'L CONTRACTORS C—
03/20/2019CompleteV. VASS ELECTRIC CORP—
1 job · most recent 07/01/2025
Sidewalk Shed
FiledStatusContractorScope
07/01/2025Signed-offSAFELINE GROUP INCSidewalk Shed
1 job · most recent 06/27/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
06/27/2025Permit IssuedDYNAMIC CONSTRUCTION COSuspended Scaffold (SC)
Building Lifecycle
All (44)Filed (6)Permit Issued (8)Signed Off (3)Violation (20)Objection (2)Special Inspection (5)
07/20/2026
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B01249549-I1
06/25/2026
Permit issued — Suspended Scaffold
B01248036-I1-SC
12/08/2025
Violation issued (HPD, open)
B
12/08/2025
Violation issued (HPD, open)
B
12/08/2025
Violation issued (HPD, closed)
C
11/13/2025
Permit issued — General Construction
B01265895-I1-GC
11/13/2025
Permit issued — Structural
B01265895-I1-ST
09/02/2025
Permit issued — Sidewalk Shed
B01249549-I1-SH
08/24/2025
Filed — Alteration
B01265895-I1
07/02/2025
Permit issued — Suspended Scaffold
B01248036-I1-SC
07/01/2025
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B01249549-I1
06/30/2025
Objection raised — Admin
06/30/2025
Objection resolved — Addressed
06/27/2025
Filed — Alteration
SUSPENDED SCAFFOLD OUTRIGGER SYSTEM FOR EXTERIOR FACADE REPAIR WORK AT 2229 KNAPP STREET, BROOKLYN.
B01248036-I1
05/09/2025
Signed off — Alteration
GARAGE REPAIRS AS PER PLANS. NO CHANGE IN OCCUPANCY USE OR EGRESS
B01114714-I1
01/27/2025
Filed — Alteration
GARAGE REPAIRS AS PER PLANS. NO CHANGE IN OCCUPANCY USE OR EGRESS
B01114714-P1
01/27/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
John Nucatola
01/27/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
John Nucatola
01/27/2025
Special inspection requirement — Tenant Protection Plan Compliance
John Nucatola
01/27/2025
Special inspection requirement — Concrete - Cast-In-Place
John Nucatola
01/27/2025
Special inspection requirement — Final
Roberta Levine
12/11/2024
Permit issued — General Construction
B01114714-I1-ST
12/11/2024
Permit issued — General Construction
B01114714-I1-GC
11/19/2024
Filed — Alteration
GARAGE REPAIRS AS PER PLANS. NO CHANGE IN OCCUPANCY USE OR EGRESS
B01114714-I1
08/28/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/28/2024
Violation issued (ECB, open)
Construction
08/28/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/28/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/26/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/26/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/05/2021
Violation issued (ECB, open)
Construction
03/05/2021
Violation issued (ECB, open)
Plumbing
12/16/2019
Signed off — Alteration
B00147125-I1
09/11/2019
Violation issued (ECB, closed)
Construction
03/29/2019
Permit issued — Sidewalk Shed
B00147125-I1-SH
03/28/2019
Filed — Alteration
B00147125-I1
12/17/2018
Violation issued (ECB, closed)
Elevators
06/03/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/12/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
06/28/2010
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/20/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
03/12/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/28/1998
Violation issued (ECB, closed)
Elevators
08/16/1993
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CEPRINE CONSTRUCTION407/08/2026
SAFELINE GROUP407/08/2026
DYNAMIC CONSTRUCTION COMPANY406/27/2026
ARGO REAL ESTATE103/22/2026
OWNER OF 2229 KNAPP ST103/22/2026
BRIGHAM PARK SEC 1603/21/2026
BRIGHAM PARK COOPERATIVE APARTME103/21/2026
BRIGHAM PARK SECTION 1103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HONORIO DESIGNS ARCHITECTURE, PLLC108/24/2025
MJE PROFESSIONAL SERVICES107/01/2025
LPE ENGINEERING, PC201/27/2025
KZ ENGINEERING, P.C103/28/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AK CONSULTING SERVICES203/21/2026
SYNERGY BUILDING CONSULTANTS103/21/2026
L L CONSULTING SERVICES203/21/2026
SNR EXPEDITING DESIGN203/21/2026
FRAMEWORK CONSULTANTS403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ZIAUR BHUIYANGeneral Contractor804/09/2026
KONARZEWSKI, TADEUSZElectrical203/21/2026
SAUBERMAN, ALVINElectrical203/21/2026
CEPRINE CONSTRUCTION INCGeneral Contractor107/08/2026
SAFELINE GROUP INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AG ENGINEERING PLLC8899108/24/2025
CNS INSPECTION SERVICES7566201/27/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedDYNAMIC CONSTRUCTION CO06/25/2026
DOB NOWGeneral ConstructionPermit IssuedZIAUR BHUIYAN11/13/2025
DOB NOWStructuralPermit IssuedZIAUR BHUIYAN11/13/2025
DOB NOWSidewalk ShedSigned-offSAFELINE GROUP INC09/02/2025
DOB NOWSuspended ScaffoldPermit IssuedDYNAMIC CONSTRUCTION CO07/02/2025
DOB NOWGeneral ConstructionSigned-offZIAUR BHUIYAN12/11/2024
DOB NOWGeneral ConstructionSigned-offZIAUR BHUIYAN12/11/2024
DOB NOWSidewalk ShedSigned-offCEPRINE CONSTRUCTION INC03/29/2019
BISOTISSUEDPOFI CONSTRUCTION CORP11/07/2016
BISEQISSUEDCEPRINE CONSTRUCTION INC09/09/2016
BISOTISSUEDF & S GENERAL CONSTRUCTIO08/23/2013
BISEQISSUEDYORK SCAFFOLD04/11/1991
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
01/27/2025Structural Stability – Alterations of existing buildingsJohn Nucatolaspecial
01/27/2025Fire-Resistant Penetrations and JointsJohn Nucatolaspecial
01/27/2025Tenant Protection Plan ComplianceJohn Nucatolaspecial
01/27/2025Concrete - Cast-In-PlaceJohn Nucatolaspecial
01/27/2025FinalRoberta Levineprogress
▾Documents — 68 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch5
08/23/2026B01114714-I1Request digital key ↗
08/23/2026B01114714-P1Request digital key ↗
08/21/2026B01248036-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/02/2026B00147125-I1Request digital key ↗
▸Applications & Permits7
▸BISPLAN / WORK APPROVAL APPLICATION4
06/03/2019321960017Open ↗
10/05/2016321460478Open ↗
09/07/2016340420182Open ↗
Showing 3 of 4 on file for this type
▸BISWORK PERMIT APPLICATION3
11/09/2016321460478Open ↗
09/07/2016340420182Open ↗
08/22/2013340078070Open ↗
▸Seals & Professional Certifications21
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION6
06/03/2019321960017Open ↗
06/03/2019321960017Open ↗
01/05/2018321460478Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
09/02/2026B00147125-I1Open ↗
08/23/2026B01114714-I1Open ↗
08/23/2026B01114714-P1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
09/07/2016340420182Open ↗
08/22/2013340078070Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
09/07/2016340420182Open ↗
08/22/2013340078070Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
09/07/2016340420182Open ↗
08/22/2013340078070Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/26/2026B01114714-I1Open ↗
08/26/2026B01114714-I1Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
06/03/2019321960017Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/26/2026B01114714-I1Open ↗
▸Safety & Tenant Protection3
▸BISTenant Protection Plan and Notes3
06/03/2019321960017Open ↗
10/05/2016321460478Open ↗
09/07/2016340420182Open ↗
▸Environmental & Asbestos7
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
06/03/2019321960017Open ↗
06/03/2019321960017Open ↗
10/05/2016321460478Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/23/2026B01114714-P1Open ↗
08/23/2026B01114714-I1Open ↗
08/20/2026B01265895-I1Open ↗
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
06/03/2019321960017Open ↗
01/05/2018321460478Open ↗
11/09/2016321460478Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS1
01/05/2018321460478Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
08/22/2013340078070Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
09/07/2016340420182Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
08/22/2013340078070Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
08/22/2013340078070Open ↗
▸Approvals, Objections & Sign-offs3
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
01/05/2018321460478Open ↗
02/15/2017340420182Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
11/09/2016321460478Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT5
06/03/2019321960017Open ↗
01/05/2018321460478Open ↗
01/05/2018321460478Open ↗
Showing 3 of 5 on file for this type
▸Filing & Intake Forms5
▸BISEFILING JOB APPLICATION COVER SHEET2
09/07/2016340420182Open ↗
08/22/2013340078070Open ↗
▸BISEFILING COVER SHEET2
06/04/2019321960017Open ↗
10/05/2016321460478Open ↗
▸BISBOROUGH INTAKE FORM1
01/05/2018321460478Open ↗
▸Other Documents2
▸DOB NOWManufacturer's Specifications1
08/13/2026B01248036-I1Open ↗
▸DOB NOWCalculations1
08/13/2026B01248036-I1Open ↗