← Back
Elevator apt, semi-fireproof without stores
281 MARCUS GARVEY BLVD
BROOKLYN · BIN 3325012
💬 Discuss this project
1972Year Built
3Stories
D1Building Class
R6AZoning
188,486 sfGross Floor Area
175Units
LL97 CoveredRent Stabilized93 Open Violations ▸FDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: 745 GATES HDFC · 87,000 sf lot · 2.17 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionCivilGeneral
Roof12p · 1 filing · 18 docs
Bulkhead2p · 1 filing · 18 docs
Floor 103p · 1 filing · 18 docs
Floor 94p · 1 filing · 18 docs
Floor 84p · 1 filing · 18 docs
Floor 75p · 1 filing · 18 docs
Floor 61p · 1 filing · 18 docs
Floor 51p · 1 filing · 18 docs
Floor 41p · 1 filing · 18 docs
Floor 34p · 1 filing · 18 docs
Floor 25p · 1 filing · 18 docs
Floor 16p · 1 filing · 18 docs
Cellar7p · 1 filing · 18 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
745 GATES HDFC, FLOOR 31203/22/2026
OWNER OF 275 SUMNER AVENU103/22/2026
GRENADIER REALTY CORP103/21/2026
BEER MIRIAM SCHOOL103/21/2026
745 GATES HOUSING DEVELOPMENT FC103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GEODESIGN INC. PC105/09/2025
EP ENGINEERING LLC304/18/2025
GACE DPC204/10/2025
MAGNUSSON ARCHITECTURE AND PLANNING102/04/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CORE CONSULTANTS NYC603/21/2026
SELECT TYPE203/21/2026
Building Lifecycle
All (91)Filed (7)Violation (37)Objection (17)Special Inspection (30)
06/26/2026
Objection resolved — Resolved
06/17/2025
Objection raised — Admin
06/17/2025
Objection resolved — Addressed
06/16/2025
Objection raised — Admin
06/10/2025
Objection resolved — Addressed
06/09/2025
Objection resolved — Addressed
05/28/2025
Objection resolved — Open
05/27/2025
Objection resolved — Addressed
05/22/2025
Objection raised — Other
05/15/2025
Special inspection requirement — Fenestration areas
05/15/2025
Special inspection requirement — Insulation placement and R values
05/15/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
05/15/2025
Special inspection requirement — Air barrier - visual inspection
05/15/2025
Special inspection requirement — Fenestration air leakage
05/09/2025
Filed — New Building
PROPOSED MIXED USED (86 DWELLING UNIT) 10-STORY NEW BUILDING
B01166776-S7
05/02/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
04/29/2025
Objection raised — Admin
04/29/2025
Objection raised — Admin
04/28/2025
Objection raised — Admin
04/25/2025
Objection raised — Admin
04/25/2025
Objection raised — Other
04/18/2025
Filed — New Building
PROPOSED MIXED USED (86 DWELLING UNIT) 10-STORY NEW BUILDING
B01166776-S1
04/18/2025
Filed — New Building
PROPOSED MIXED USED (86 DWELLING UNIT) 10-STORY NEW BUILDING
B01166776-S4
04/18/2025
Filed — New Building
PROPOSED MIXED USED (86 DWELLING UNIT) 10-STORY NEW BUILDING
B01166776-S2
04/10/2025
Filed — New Building
PROPOSED MIXED USED (86 DWELLING UNIT) 10-STORY NEW BUILDING
B01166776-S6
04/10/2025
Filed — New Building
PROPOSED MIXED USED (86 DWELLING UNIT) 10-STORY NEW BUILDING
B01166776-S5
03/19/2025
Objection raised — Admin
03/19/2025
Special inspection requirement — Concrete - Cast-In-Place
03/17/2025
Special inspection requirement — Sprinkler Systems
03/17/2025
Special inspection requirement — Standpipe Systems
03/17/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
03/17/2025
Special inspection requirement — Post-installed Anchors
03/17/2025
Special inspection requirement — Final
03/17/2025
Special inspection requirement — Footing and Foundation
03/07/2025
Special inspection requirement — Electrical motors and elevators
03/07/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
03/07/2025
Special inspection requirement — HVAC-R and service water heating system controls
03/07/2025
Special inspection requirement — Maintenance information
03/07/2025
Special inspection requirement — Shutoff dampers
03/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
03/07/2025
Special inspection requirement — Post-installed Anchors
03/07/2025
Special inspection requirement — Final
03/07/2025
Special inspection requirement — Energy Code Compliance Inspections
03/07/2025
Special inspection requirement — Duct leakage testing, insulation and design
03/07/2025
Special inspection requirement — HVAC-R and service water heating equipment
03/07/2025
Special inspection requirement — Exhaust and Vent Systems in Plenums and Ducts
03/07/2025
Special inspection requirement — Emergency and Standby Power Systems (Generator)
03/07/2025
Special inspection requirement — Mechanical Systems
02/20/2025
Objection resolved — Addressed
02/13/2025
Objection raised — Admin
02/04/2025
Filed — New Building
PROPOSED MIXED USED (86 DWELLING UNIT) 10-STORY NEW BUILDING
B01166776-I1
01/17/2025
Special inspection requirement — Mastic and Intumescent Fire-resistant Coatings
01/17/2025
Special inspection requirement — Sprayed fire-resistant materials
01/17/2025
Special inspection requirement — Subgrade Inspections
01/16/2024
Violation issued (FDNY_NOV, closed)
09/29/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/26/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
08/14/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/03/2018
Violation issued (ECB, closed)
Construction
02/03/2018
Violation issued (ECB, closed)
Construction
Latest 60 of 91 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BISFPISSUEDMASTER FIRE SYSTEMS, INC11/03/2011
BISMHISSUEDNU CREATINON MECHANICAL CORP01/20/2000
1 project · most recent 05/09/2025
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
05/09/2025——Air Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Ice Air RSXC09 380 CFM · Fan Coil Indoor ×89
RSXC13 400 CFM · Fan Coil Indoor ×89
Mitsubishi Electric PUZ-A24NHA7 28,000 BTU · Heat Pump Outdoor ×4
PLFY-EP24NEMU1-E.TH 27,000 BTU · Vrf Indoor ×2
PURY-EP144TNU-A1 160,000 BTU · Vrf Outdoor ×2
PURY-EP192TNU-A1 215,000 BTU · Vrf Outdoor ×2
PEFY-P12NMAU-E4 13,500 BTU · Vrf Indoor ×1
PEFY-P24NMAU-E4 27,000 BTU · Vrf Indoor ×1
PEFY-P48NMAU-E4 54,000 BTU · Vrf Indoor ×1
PLFY-EP36NEMU1-E.TH 40,000 BTU · Vrf Indoor ×1
PLFY-P12NFMU-ER1.TH 27,000 BTU · Vrf Indoor ×1
PUHY-EP192TSNU-A1 215,000 BTU · Vrf Outdoor ×1
Heating
Indeeco 926U03000DA 510 CFM · Electric Heater ×1
936U03000D 310 CFM · Electric Heater ×1
942U02000C 2 kW · Electric Heater ×1
Ventilation
Renewaire HE2X 1,450 CFM · Erv ×1
HE3X 1,230 CFM · Erv ×1
HE4X 3,270 CFM · Erv ×1
1 project · most recent 05/09/2025
Sprinkler System
FiledStatusContractorScope
05/09/2025——Sprinkler System
1 project · most recent 05/09/2025
Storm Water/Sanitary
FiledStatusContractorScope
05/09/2025——Storm, Water/Sanitary
1 project · most recent 05/09/2025
Steel Concrete
FiledStatusContractorScope
05/09/2025——Steel, Concrete
▾Special Inspection Requirements (DOB NOW) — 39
DateRequirementInspectorRole
05/15/2025Fenestration areas—energy_progress
05/15/2025Insulation placement and R values—energy_progress
05/15/2025Fenestration and door U-factor and product ratings—energy_progress
05/15/2025Air barrier - visual inspection—energy_progress
05/15/2025Fenestration air leakage—energy_progress
05/02/2025Excavations - Sheeting, Shoring, and Bracing—special
03/19/2025Concrete - Cast-In-Place—special
03/17/2025Sprinkler Systems—special
03/17/2025Standpipe Systems—special
03/17/2025Fire-Resistant Penetrations and Joints—special
03/17/2025Post-installed Anchors—special
03/17/2025Final—progress
03/17/2025Footing and Foundation—progress
03/07/2025Electrical motors and elevators—energy_progress
03/07/2025HVAC-R and service water piping design and insulation—energy_progress
03/07/2025HVAC-R and service water heating system controls—energy_progress
03/07/2025Maintenance information—energy_progress
03/07/2025Shutoff dampers—energy_progress
03/07/2025Fire-Resistant Penetrations and Joints—special
03/07/2025Post-installed Anchors—special
03/07/2025Final—progress
03/07/2025Energy Code Compliance Inspections—progress
03/07/2025Duct leakage testing, insulation and design—energy_progress
03/07/2025HVAC-R and service water heating equipment—energy_progress
03/07/2025Exhaust and Vent Systems in Plenums and Ducts—special
Latest 25 of 39.
▾Documents — 39 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/21/2026B01166776-S1Request digital key ↗
08/21/2026B01166776-I1Request digital key ↗
08/21/2026B01166776-S8Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits4
▸BISPLAN / WORK APPROVAL APPLICATION2
06/30/2017321551673Open ↗
11/07/2011320390368Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
04/06/2018321551673Open ↗
▸BISWORK PERMIT APPLICATION1
11/04/2011320390368Open ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026B01166776-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B01166776-I1Open ↗
▸Seals & Professional Certifications11
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/21/2026B01166776-I1Open ↗
08/21/2026B01166776-S8Open ↗
08/21/2026B01166776-S7Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
11/07/2011320390368Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
11/07/2011320390368Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
11/07/2011320390368Open ↗
▸Trade Schedules & Equipment2
▸BISFA - FDNY APPROVAL : FD-FAA1
11/01/2019321551673Open ↗
▸BISSCHEDULE B - PLUMBING1
11/07/2011320390368Open ↗
▸Inspections & Test Reports1
▸DOB NOWSOIL REPORT1
08/13/2026B01166776-I1Open ↗
▸Approvals, Objections & Sign-offs3
▸BISSCHEDULE A - OCCUPANCY / USE1
01/21/2025322119202Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
11/07/2011320390368Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
11/01/2019321551673Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
11/01/2019321551673Open ↗
06/22/2017321551673Open ↗
11/07/2011320390368Open ↗
▸Filing & Intake Forms4
▸BISBOROUGH INTAKE FORM2
11/01/2019321551673Open ↗
02/12/2019320390368Open ↗
▸BISEFILING COVER SHEET2
06/22/2017321551673Open ↗
11/07/2011320390368Open ↗
▸Other Documents1
▸DOB NOWSite Survey: Initial1
08/13/2026B01166776-I1Open ↗