← Back
Elevator apt, semi-fireproof without stores
311 MARCUS GARVEY BLVD
BROOKLYN · BIN 3325019
💬 Discuss this project
1972Year Built
6Stories
D1Building Class
R6AZoning
179,590 sfGross Floor Area
160Units
LL97 CoveredRent Stabilized76 Open Violations ▸FDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: 690 GATES AVENUE HOUS · 83,000 sf lot · 2.16 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionCivilGeneral
Roof11p · 1 filing · 20 docs
Bulkhead4p · 1 filing · 20 docs
Floor 106p · 1 filing · 20 docs
Floor 94p · 1 filing · 20 docs
Floor 85p · 1 filing · 20 docs
Floor 75p · 1 filing · 20 docs
Floor 66p · 1 filing · 20 docs
Floor 56p · 1 filing · 20 docs
Floor 46p · 1 filing · 20 docs
Floor 36p · 1 filing · 20 docs
Floor 26p · 1 filing · 20 docs
Floor 18p · 1 filing · 20 docs
Cellar9p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
690 GATES HOUSING DEVELOPMENT FC103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
EP ENGINEERING LLC405/20/2025
GEODESIGN INC. PC105/09/2025
GACE DPC204/10/2025
MAGNUSSON ARCHITECTURE AND PLANNING102/04/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CORE CONSULTANTS NYC1103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
WILLDAN ELECTRICAL OF NYElectrical203/22/2026
Building Lifecycle
All (59)Filed (8)Violation (4)Objection (23)Special Inspection (24)
02/11/2026
Violation issued (FDNY_NOV, closed)
02/11/2026
Violation issued (FDNY_NOV, closed)
09/24/2025
Violation issued (FDNY_NOV, closed)
07/08/2025
Objection raised — Inspections
07/01/2025
Objection resolved — Resolved
06/20/2025
Objection raised — Zoning
06/17/2025
Objection resolved — Open
06/16/2025
Objection raised — Plumbing
06/16/2025
Objection resolved — Addressed
06/09/2025
Objection resolved — Addressed
05/27/2025
Objection resolved — Addressed
05/27/2025
Objection resolved — Addressed
05/25/2025
Objection raised — Fire_Protection
05/25/2025
Objection raised — Fire_Protection
05/22/2025
Objection raised — Admin
05/20/2025
Filed — New Building
Installation of temporary standpipe system in compliance with code section 3303.8 for use during construction. Temporary standpipe system shall be decommissioned and replaced with approved and signed-off permanent system upon completion of construction.
B01167646-S8
05/16/2025
Objection resolved — Addressed
05/09/2025
Filed — New Building
Installation of temporary standpipe system in compliance with code section 3303.8 for use during construction. Temporary standpipe system shall be decommissioned and replaced with approved and signed-off permanent system upon completion of construction.
B01167646-S7
05/09/2025
Special inspection requirement — Standpipe Systems
05/06/2025
Objection raised — Admin
05/01/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
04/29/2025
Objection raised — Admin
04/29/2025
Objection raised — Energy
04/29/2025
Special inspection requirement — Shutoff dampers
04/29/2025
Special inspection requirement — HVAC-R and service water heating equipment
04/29/2025
Special inspection requirement — HVAC-R and service water heating system controls
04/29/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
04/28/2025
Objection raised — Admin
04/28/2025
Objection resolved — Addressed
04/25/2025
Objection raised — Admin
04/25/2025
Objection raised — Other
04/18/2025
Filed — New Building
Installation of temporary standpipe system in compliance with code section 3303.8 for use during construction. Temporary standpipe system shall be decommissioned and replaced with approved and signed-off permanent system upon completion of construction.
B01167646-S4
04/18/2025
Filed — New Building
Installation of temporary standpipe system in compliance with code section 3303.8 for use during construction. Temporary standpipe system shall be decommissioned and replaced with approved and signed-off permanent system upon completion of construction.
B01167646-S2
04/18/2025
Filed — New Building
Installation of temporary standpipe system in compliance with code section 3303.8 for use during construction. Temporary standpipe system shall be decommissioned and replaced with approved and signed-off permanent system upon completion of construction.
B01167646-S1
04/15/2025
Special inspection requirement — Chimneys and vents
04/10/2025
Filed — New Building
Installation of temporary standpipe system in compliance with code section 3303.8 for use during construction. Temporary standpipe system shall be decommissioned and replaced with approved and signed-off permanent system upon completion of construction.
B01167646-S5
04/10/2025
Filed — New Building
Installation of temporary standpipe system in compliance with code section 3303.8 for use during construction. Temporary standpipe system shall be decommissioned and replaced with approved and signed-off permanent system upon completion of construction.
B01167646-S6
03/31/2025
Special inspection requirement — Concrete - Cast-In-Place
03/19/2025
Objection raised — Other
03/17/2025
Special inspection requirement — Final
03/17/2025
Special inspection requirement — Footing and Foundation
03/14/2025
Special inspection requirement — Final
03/14/2025
Special inspection requirement — Energy Code Compliance Inspections
03/14/2025
Special inspection requirement — Electrical motors and elevators
03/14/2025
Special inspection requirement — Maintenance information
03/14/2025
Special inspection requirement — Duct leakage testing, insulation and design
03/14/2025
Special inspection requirement — Standpipe Systems
03/14/2025
Special inspection requirement — Sprinkler Systems
03/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
03/14/2025
Special inspection requirement — Post-installed Anchors
03/14/2025
Special inspection requirement — Emergency and Standby Power Systems (Generator)
03/14/2025
Special inspection requirement — Mechanical Systems
03/14/2025
Special inspection requirement — Exhaust and Vent Systems in Plenums and Ducts
03/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
03/14/2025
Special inspection requirement — Post-installed Anchors
02/20/2025
Objection resolved — Addressed
02/13/2025
Objection raised — Other
02/04/2025
Filed — New Building
Installation of temporary standpipe system in compliance with code section 3303.8 for use during construction. Temporary standpipe system shall be decommissioned and replaced with approved and signed-off permanent system upon completion of construction.
B01167646-I1
09/27/2019
Violation issued (FDNY_NOV, closed)
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BISFPISSUEDNEW YORK BUSINESS FIRE SYSTEM08/01/2001
BISMHISSUEDWAGNER WEINTRAUB PLUMBING & HTG11/08/1996
BISPLISSUEDWAGNER WEINTRAUB PLG.& HTG.09/20/1996
1 project · most recent 05/20/2025
Heating and Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
05/20/2025——Heating and Air Conditioning Systems, Heating Systems, Ventilation Systems
Heat / Cool
Ice Air RSXC09 380 CFM · Split System ×84
RSXC13 400 CFM · Split System ×1
Mitsubishi Electric PUZ-A24NHA7 24,000 BTU · Condensing Unit ×4
PLFY-EP24NEMU1-E.TH 27,000 BTU · Vrf Indoor ×2
PURY-EP144TNU-A1 144,000 BTU · Vrf Outdoor ×2
PEFY-P12NMAU-E4 13,500 BTU · Vrf Indoor ×1
PEFY-P24NMAU-E4 24,000 BTU · Vrf Indoor ×1
PEFY-P48NMAU-E4 48,000 BTU · Vrf Indoor ×1
PUHY-EP192TSNU-A1 192,000 BTU · Vrf Outdoor ×1
Heating
Indeeco 936U03000D 310 CFM · Electric Heater ×1
942U02000C 2 kW · Baseboard ×1
Mitsubishi Electric 926U03000DA 510 CFM · Electric Heater ×1
Ventilation
American Aldes CAR3 60 CFM ×10
Greenheck AX-63-160-0427-A20 7,000 CFM · Exhaust Fan ×2
SQ-140 1,400 CFM · Exhaust Fan ×1
Ice Air HE2X 1,450 CFM · Exhaust Fan ×1
HE4X 3,270 CFM · Exhaust Fan ×1
Renewaire HE3X 1,230 CFM · Exhaust Fan ×1
__Junk__ DEF-15 1,200 CFM ×1
1 project · most recent 05/20/2025
Sprinkler System
FiledStatusContractorScope
05/20/2025——Sprinkler System
1 project · most recent 05/20/2025
Storm Water/Sanitary
FiledStatusContractorScope
05/20/2025——Storm, Water/Sanitary
2 projects · most recent 03/21/2019
FiledStatusContractorScope
03/21/2019CompleteWILLDAN ELECTRICAL OF NY—
03/08/2019CompleteWILLDAN ELECTRICAL OF NY—
1 project · most recent 05/20/2025
Steel Concrete
FiledStatusContractorScope
05/20/2025——Steel, Concrete
▾Special Inspection Requirements (DOB NOW) — 24
DateRequirementInspectorRole
05/09/2025Standpipe Systems—special
05/01/2025Excavations - Sheeting, Shoring, and Bracing—special
04/29/2025Shutoff dampers—energy_progress
04/29/2025HVAC-R and service water heating equipment—energy_progress
04/29/2025HVAC-R and service water heating system controls—energy_progress
04/29/2025HVAC-R and service water piping design and insulation—energy_progress
04/15/2025Chimneys and vents—special
03/31/2025Concrete - Cast-In-Place—special
03/17/2025Final—progress
03/17/2025Footing and Foundation—progress
03/14/2025Final—progress
03/14/2025Energy Code Compliance Inspections—progress
03/14/2025Electrical motors and elevators—energy_progress
03/14/2025Maintenance information—energy_progress
03/14/2025Duct leakage testing, insulation and design—energy_progress
03/14/2025Standpipe Systems—special
03/14/2025Sprinkler Systems—special
03/14/2025Fire-Resistant Penetrations and Joints—special
03/14/2025Post-installed Anchors—special
03/14/2025Emergency and Standby Power Systems (Generator)—special
03/14/2025Mechanical Systems—special
03/14/2025Exhaust and Vent Systems in Plenums and Ducts—special
03/14/2025Fire-Resistant Penetrations and Joints—special
03/14/2025Post-installed Anchors—special
▾Documents — 23 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/21/2026B01167646-I1Request digital key ↗
08/21/2026B01167646-S8Request digital key ↗
08/21/2026B01167646-S7Request digital key ↗
Showing 3 of 8 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026B01167646-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B01167646-I1Open ↗
▸Seals & Professional Certifications8
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/21/2026B01167646-I1Open ↗
08/21/2026B01167646-S8Open ↗
08/21/2026B01167646-S7Open ↗
Showing 3 of 8 on file for this type
▸Inspections & Test Reports1
▸DOB NOWSOIL REPORT1
08/13/2026B01167646-I1Open ↗
▸Approvals, Objections & Sign-offs2
▸BISLETTERS - SUPPORTING DOCUMENTATION1
02/04/2025322119195Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE1
01/21/2025322119195Open ↗
▸Other Documents2
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
02/04/2025322119195Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026B01167646-I1Open ↗