← Back
Over six families without stores
Ft Greene
33 ST FELIX STREET · BIN 3326204
💬 Discuss this project
1984Year Built
3Stories
C1Building Class
R6BZoning
26,890 sfGross Floor Area
32Units
Rent Stabilized26 Open Violations ▸FDNY Report ↗
Over six families without stores · Owner of record: FT GREENE TB HOUSING DEVELOPMENT FUND CO RPORATION · 11,660 sf lot · 2.31 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Floor 32p · 1 filing · 6 docs
Floor 22p · 1 filing · 6 docs
Floor 11p · 1 filing · 7 docs
Basement3p · 2 filings · 13 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TRI BLOCK ASSOCIATES103/22/2026
TRI BLOCK FTG LLC103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
COLLADO ENGINEERING209/16/2025
CTA ARCHITECTS108/20/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MUNICIPAL BUILDING CONSULTANTS303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CAPONE ELECL CONTRS CORPElectrical103/22/2026
MDG DESIGN & CONSTR LLCGeneral Contractor104/09/2026
DOVAL PLBG & HTG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CATALPA SPECIAL INSPECTIO2004209/09/2024
Building Lifecycle
All (74)Filed (3)Permit Issued (2)Signed Off (2)Violation (34)Inspection (3)Objection (22)Special Inspection (8)
12/09/2025
Signed off — Alteration
Replacing plumbing fixtures on existing roughing as per plans filed herewith. No change to use, egress, or occupancy.
B01094294-I1
12/02/2025
Signed off — Alteration
Interior building renovations including apartment bathrooms, kitchens, common spaces, etc. as per plans filed herewith. No change to use, egress, or occupancy.
B01063359-I1
11/13/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/08/2025
Objection resolved — Addressed
10/08/2025
Special inspection requirement — Tenant Protection Plan Compliance
ERIC BERLENT
09/23/2025
Objection raised — Plumbing
09/16/2025
Filed — Alteration
Replacing plumbing fixtures on existing roughing as per plans filed herewith. No change to use, egress, or occupancy.
B01094294-P1
08/27/2025
Special inspection requirement — Tenant Protection Plan Compliance
08/01/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
06/12/2025
Violation issued (HPD, closed)
A
05/16/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/29/2025
Permit issued — Plumbing
B01094294-I1-PL
03/24/2025
Permit issued — General Construction
B01063359-I1-GC
02/20/2025
Objection resolved — Addressed
02/03/2025
Objection resolved — Addressed
01/13/2025
Objection resolved — Addressed
11/25/2024
Objection resolved — Addressed
11/25/2024
Objection resolved — Addressed
10/25/2024
Violation issued (HPD, closed)
B
10/25/2024
Violation issued (HPD, closed)
B
10/25/2024
Violation issued (HPD, open)
B
10/25/2024
Violation issued (HPD, closed)
B
10/16/2024
Objection resolved — Addressed
10/16/2024
Objection resolved — Addressed
10/16/2024
Objection resolved — Addressed
10/16/2024
Objection resolved — Addressed
10/01/2024
Objection resolved — Addressed
09/11/2024
Objection raised — Mechanical
09/11/2024
Objection raised — Scope
09/11/2024
Objection raised — Admin
09/11/2024
Objection raised — Inspections
09/11/2024
Objection raised — Fire_Protection
09/11/2024
Objection raised — Admin
09/09/2024
Filed — Alteration
Replacing plumbing fixtures on existing roughing as per plans filed herewith. No change to use, egress, or occupancy.
B01094294-I1
09/03/2024
Objection raised — Other
09/03/2024
Objection raised — Other
09/03/2024
Objection raised — Other
09/03/2024
Objection raised — Other
08/20/2024
Filed — Alteration
Interior building renovations including apartment bathrooms, kitchens, common spaces, etc. as per plans filed herewith. No change to use, egress, or occupancy.
B01063359-I1
08/02/2024
Special inspection requirement — Tenant Protection Plan Compliance
ERIC BERLENT
08/02/2024
Special inspection requirement — Final
Christa Waring
08/02/2024
Special inspection requirement — Interior lighting power
ERIC BERLENT
08/02/2024
Special inspection requirement — Lighting in dwelling units
ERIC BERLENT
08/02/2024
Special inspection requirement — Lighting controls
ERIC BERLENT
08/02/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ERIC BERLENT
04/14/2022
Violation issued (HPD, closed)
B
04/14/2022
Violation issued (HPD, closed)
C
03/10/2022
Violation issued (HPD, closed)
C
02/23/2022
Violation issued (HPD, closed)
B
02/23/2022
Violation issued (HPD, closed)
B
02/23/2022
Violation issued (HPD, closed)
B
02/23/2022
Violation issued (HPD, closed)
B
02/23/2022
Violation issued (HPD, closed)
B
02/23/2022
Violation issued (HPD, closed)
B
02/06/2020
Violation issued (HPD, closed)
A
02/06/2020
Violation issued (HPD, closed)
C
02/06/2020
Violation issued (HPD, closed)
B
12/02/2019
Violation issued (ECB, closed)
Boilers
09/24/2017
Violation issued (HPD, closed)
B
07/10/2017
Violation issued (HPD, closed)
C
Latest 60 of 74 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offDOVAL PLBG & HTG CORP04/29/2025
DOB NOWGeneral ConstructionSigned-offMDG DESIGN & CONSTR LLC03/24/2025
1 project · most recent 06/16/2025
General Wiring
FiledStatusContractorScope
06/16/2025CompleteCAPONE ELECL CONTRS CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
11/13/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/01/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
05/16/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
10/08/2025Tenant Protection Plan ComplianceERIC BERLENTspecial
08/27/2025Tenant Protection Plan Compliance—special
08/02/2024Tenant Protection Plan ComplianceERIC BERLENTspecial
08/02/2024FinalChrista Waringprogress
08/02/2024Interior lighting powerERIC BERLENTenergy_progress
08/02/2024Lighting in dwelling unitsERIC BERLENTenergy_progress
08/02/2024Lighting controlsERIC BERLENTenergy_progress
08/02/2024Fire-Resistant Penetrations and JointsERIC BERLENTspecial
▾Documents — 13 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/24/2026B01094294-I1Request digital key ↗
08/24/2026B01094294-P1Request digital key ↗
08/15/2026B01063359-I1Request digital key ↗
▸Seals & Professional Certifications7
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/24/2026B01094294-I1Open ↗
08/24/2026B01094294-P1Open ↗
08/13/2026B01063359-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/26/2026B01063359-I1Open ↗
08/26/2026B01063359-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/28/2026B01094294-I1Open ↗
08/26/2026B01063359-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/24/2026B01094294-I1Open ↗
08/24/2026B01094294-P1Open ↗
08/13/2026B01063359-I1Open ↗