Walk-up cooperative
159 LAFAYETTE AVENUE
BROOKLYN · BIN 3326230
💬 Discuss this project
1897Year Built
5Stories
C6Building Class
R6BZoning
17,600 sfGross Floor Area
21Units
Rent Stabilized19 Open Violations ▸FDNY Report ↗
Walk-up cooperative · Owner of record: 155-159 LAFAYETTE OWNERS CORP · 4,950 sf lot · 3.56 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Roof1p · 1 filing · 4 docs
Floor 13p · 1 filing · 20 docs
Cellar1p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
155-159 LAFAYETTE OWNERS CORP503/22/2026
155-159 LAFAYETTE AVENUE OWNERS403/21/2026
CAPRON DESIGN103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MDG DESIGN GROUP311/07/2025
CHONG ENGINEERING, P.C.203/17/2025
SY ENGINEERING PLLC108/18/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
K M DOB CONSULTING203/21/2026
M-DIS DESIGN GROUP303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DOUG'S PLUMBING & HEATINGGeneral Contractor207/08/2026
PROFF ELECTRICAL LLCElectrical103/22/2026
DOUG'S PLBG & HTG SERV COPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SEAD ENGINEERING PC2665311/07/2025
CHONG ENGINEERING P.C.7411109/11/2024
Building Lifecycle
All (90)Filed (6)Permit Issued (3)Signed Off (3)Violation (37)Inspection (5)Objection (6)Special Inspection (30)
11/21/2025
Signed off — Alteration
HEREWITH FILE TO RENOVATE EXIST. APARTMENT UNIT #1D (C/O#222314). WORK INCLUDES NEW TOILET PLUMBING FIXTURE W/ASSOCIATED PIPING ELEMENTS, AND FIRE-STOPPING IS PROVIDED. NO CHANGE IN USE, EGRESS, AND OCCUPANCY
B01099176-I1
11/21/2025
Signed off — Alteration
HEREWITH FILE TO RENOVATE EXIST. APARTMENT UNIT #1D (C/O#222314). WORK INCLUDES NEW TOILET PLUMBING FIXTURE W/ASSOCIATED PIPING ELEMENTS, AND FIRE-STOPPING IS PROVIDED. NO CHANGE IN USE, EGRESS, AND OCCUPANCY
B01099176-S1
11/20/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
11/19/2025
Special inspection requirement — Fire-Resistance Rated Construction
INHWAN CHANG
11/19/2025
Special inspection requirement — Lighting in dwelling units
INHWAN CHANG
11/19/2025
Special inspection requirement — Lighting controls
INHWAN CHANG
11/19/2025
Special inspection requirement — Interior lighting power
INHWAN CHANG
11/19/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
INHWAN CHANG
11/07/2025
Filed — Alteration
HEREWITH FILE TO RENOVATE EXIST. APARTMENT UNIT #1D (C/O#222314). WORK INCLUDES NEW TOILET PLUMBING FIXTURE W/ASSOCIATED PIPING ELEMENTS, AND FIRE-STOPPING IS PROVIDED. NO CHANGE IN USE, EGRESS, AND OCCUPANCY
B01099176-P1
11/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
INHWAN CHANG
11/03/2025
Special inspection requirement — Interior lighting power
INHWAN CHANG
11/03/2025
Special inspection requirement — Lighting in dwelling units
INHWAN CHANG
11/03/2025
Special inspection requirement — Lighting controls
INHWAN CHANG
11/03/2025
Special inspection requirement — Fire-Resistance Rated Construction
INHWAN CHANG
10/22/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
10/07/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/28/2025
Signed off — Alteration
B01098855-I1
06/27/2025
Permit issued — Structural
B01098855-I1-ST
06/17/2025
Permit issued — General Construction
B01099176-I1-GC
06/09/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/09/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/03/2025
Permit issued — Plumbing
B01099176-S1-PL
03/18/2025
Special inspection requirement — Tenant Protection Plan Compliance
Tae Chong
03/18/2025
Special inspection requirement — Post-installed Anchors
Tae Chong
03/18/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Tae Chong
03/18/2025
Special inspection requirement — Structural Steel - High Strength Bolting
Tae Chong
03/18/2025
Special inspection requirement — Structural Steel - Details
Tae Chong
03/18/2025
Special inspection requirement — Concrete - Cast-In-Place
Tae Chong
03/18/2025
Special inspection requirement — Lowest Floor Elevation
Tae Chong
03/18/2025
Special inspection requirement — Final
Tae Chong
03/18/2025
Special inspection requirement — Structural Wood Frame
Tae Chong
03/17/2025
Filed — Alteration
B01098855-P1
01/29/2025
Special inspection requirement — Concrete - Cast-In-Place
01/29/2025
Special inspection requirement — Post-installed Anchors
01/29/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
01/29/2025
Special inspection requirement — Structural Steel - Details
01/29/2025
Special inspection requirement — Structural Steel - High Strength Bolting
01/29/2025
Special inspection requirement — Tenant Protection Plan Compliance
01/29/2025
Special inspection requirement — Structural Wood Frame
01/29/2025
Special inspection requirement — Final
01/29/2025
Special inspection requirement — Lowest Floor Elevation
09/11/2024
Filed — Alteration
HEREWITH FILE TO RENOVATE EXIST. APARTMENT UNIT #1D (C/O#222314). WORK INCLUDES NEW TOILET PLUMBING FIXTURE W/ASSOCIATED PIPING ELEMENTS, AND FIRE-STOPPING IS PROVIDED. NO CHANGE IN USE, EGRESS, AND OCCUPANCY
B01099176-I1
09/11/2024
Filed — Alteration
HEREWITH FILE TO RENOVATE EXIST. APARTMENT UNIT #1D (C/O#222314). WORK INCLUDES NEW TOILET PLUMBING FIXTURE W/ASSOCIATED PIPING ELEMENTS, AND FIRE-STOPPING IS PROVIDED. NO CHANGE IN USE, EGRESS, AND OCCUPANCY
B01099176-S1
09/11/2024
Filed — Alteration
B01098855-I1
08/20/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
INHWAN CHANG
08/24/2023
Objection raised — Admin
08/24/2023
Objection resolved — Addressed
08/24/2023
Objection raised — Scope
08/24/2023
Objection resolved — Addressed
08/24/2023
Objection raised — Scope
08/24/2023
Objection resolved — Addressed
08/18/2023
Filed — Alteration
INSTALLATION OF EXHAUST PIPES AND INTAKE AIR PIPES WITH FANS.
B00873986-I1
05/11/2023
Special inspection requirement — Mechanical Systems
02/08/2023
Violation issued (FDNY_NOV, closed)
09/09/2022
Violation issued (FDNY_NOV, closed)
03/08/2022
Violation issued (HPD, closed)
A
03/08/2022
Violation issued (HPD, closed)
I
06/16/2017
Violation issued (HPD, open)
B
06/16/2017
Violation issued (HPD, open)
B
06/16/2017
Violation issued (HPD, open)
A
Latest 60 of 90 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offDOUG'S PLUMBING & HEATING06/27/2025
DOB NOWGeneral ConstructionSigned-offDOUG'S PLUMBING & HEATING06/17/2025
DOB NOWPlumbingSigned-offDOUG'S PLBG & HTG SERV CO06/03/2025
BISPLISSUEDDOUG'S PLBG & HTG SERV CO06/12/2015
BISBLISSUEDDOUG'S PLBG & HTG SERV CO06/12/2015
BISOTISSUEDJERRICK WATERPROOFING CO INC07/23/2003
BISEQISSUEDJERRICK WATERPROOFING CO. INC.03/07/2003
BISOTISSUEDEVERLAST CUSTOM CONSTRUCTION08/16/1999
1 project · most recent 08/18/2023
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/18/2023——Ventilation Systems
Ventilation
Fantech RVF4 100 CFM · Exhaust Fan ×5
2 projects · most recent 12/30/2025
General Wiring
FiledStatusContractorScope
12/30/2025CompletePROFF ELECTRICAL LLCGeneral Wiring
12/11/2025CompleteRIVIERA ELECTRIC CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
11/20/2025Pass-Final General Construction Non-Directive 14PassView ↗
10/22/2025Fail-Final General Construction Non-Directive 14FailView ↗
10/07/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/09/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/09/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 33
DateRequirementInspectorRole
11/19/2025Fire-Resistance Rated ConstructionINHWAN CHANGprogress
11/19/2025Lighting in dwelling unitsINHWAN CHANGenergy_progress
11/19/2025Lighting controlsINHWAN CHANGenergy_progress
11/19/2025Interior lighting powerINHWAN CHANGenergy_progress
11/19/2025Fire-Resistant Penetrations and JointsINHWAN CHANGspecial
11/03/2025Fire-Resistant Penetrations and JointsINHWAN CHANGspecial
11/03/2025Interior lighting powerINHWAN CHANGenergy_progress
11/03/2025Lighting in dwelling unitsINHWAN CHANGenergy_progress
11/03/2025Lighting controlsINHWAN CHANGenergy_progress
11/03/2025Fire-Resistance Rated ConstructionINHWAN CHANGprogress
03/18/2025Tenant Protection Plan ComplianceTae Chongspecial
03/18/2025Post-installed AnchorsTae Chongspecial
03/18/2025Structural Stability – Alterations of existing buildingsTae Chongspecial
03/18/2025Structural Steel - High Strength BoltingTae Chongspecial
03/18/2025Structural Steel - DetailsTae Chongspecial
03/18/2025Concrete - Cast-In-PlaceTae Chongspecial
03/18/2025Lowest Floor ElevationTae Chongprogress
03/18/2025FinalTae Chongprogress
03/18/2025Structural Wood FrameTae Chongprogress
01/29/2025Concrete - Cast-In-Place—special
01/29/2025Post-installed Anchors—special
01/29/2025Structural Stability – Alterations of existing buildings—special
01/29/2025Structural Steel - Details—special
01/29/2025Structural Steel - High Strength Bolting—special
01/29/2025Tenant Protection Plan Compliance—special
Latest 25 of 33.
▾Documents — 51 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/27/2026B00873986-I1Request digital key ↗
08/24/2026B01098855-P1Request digital key ↗
08/24/2026B01098855-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits11
▸DOB NOWLPC Approval/Permit6
08/13/2026B01099176-S1Open ↗
08/13/2026B00873986-I1Open ↗
08/13/2026B01098855-P1Open ↗
Showing 3 of 6 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION2
03/16/2016321105816Open ↗
04/07/2015321105816Open ↗
▸BISWORK PERMIT APPLICATION2
06/15/2015321105816Open ↗
06/15/2015321105816Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
03/06/2016321105816Open ↗
▸Seals & Professional Certifications21
▸DOB NOWProgress Inspector Seal & Signature9
08/26/2026B01099176-I1Open ↗
08/26/2026B01099176-I1Open ↗
08/26/2026B01099176-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/24/2026B01098855-I1Open ↗
08/24/2026B01098855-P1Open ↗
08/24/2026B01099176-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/27/2026B01099176-S1Open ↗
08/26/2026B01099176-I1Open ↗
08/25/2026B01099176-P1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
06/15/2015321105816Open ↗
06/15/2015321105816Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
04/07/2015321105816Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
06/01/2016321105816Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/24/2026B01098855-P1Open ↗
08/24/2026B01098855-I1Open ↗
08/24/2026B01099176-P1Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
04/07/2015321105816Open ↗
▸Energy Compliance2
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
06/15/2015321105816Open ↗
06/15/2015321105816Open ↗
▸Approvals, Objections & Sign-offs1
▸BISLANDMARKS APPROVAL1
05/11/2015321105816Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
04/07/2015321105816Open ↗