Parochial school, yeshiva
2328 STUART STREET
BROOKLYN · BIN 3326920
💬 Discuss this project
1925Year Built
2Stories
W2Building Class
R4Zoning
31,720 sfGross Floor Area
1Units
Parochial school, yeshiva · 80,000 sf lot · 0.4 FAR built · Flood zone X500
Locations of Work
Mechanical
Roof1p · 1 filing · 17 docs
1 job · most recent 08/29/2025
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/29/2025——Air Conditioning Systems
Cooling
Goodman CHPTA6030D3A 5 tons · Ahu ×4
GLXS4BA6010A 56,000 BTU · Condensing Unit ×1
1 job · most recent 08/29/2025
Gas
FiledStatusContractorScope
08/29/2025——Gas
Building Lifecycle
All (11)Filed (2)Special Inspection (9)
08/29/2025
Filed — Alteration
PLUMBING WORK ASSOCIATED WITH REMOVING AND REPLACING 4 AC UNITS.
B01254235-I1
08/29/2025
Filed — Alteration
PLUMBING WORK ASSOCIATED WITH REMOVING AND REPLACING 4 AC UNITS.
B01254235-S1
07/15/2025
Special inspection requirement — Post-installed Anchors
JONAR MADRIAGA
07/15/2025
Special inspection requirement — Energy Code Compliance Inspections
JONAR MADRIAGA
07/15/2025
Special inspection requirement — HVAC-R and service water heating equipment
JONAR MADRIAGA
07/15/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JONAR MADRIAGA
07/15/2025
Special inspection requirement — HVAC-R and service water heating system controls
JONAR MADRIAGA
07/15/2025
Special inspection requirement — Maintenance information
JONAR MADRIAGA
07/15/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
JONAR MADRIAGA
07/10/2025
Special inspection requirement — Final
JONAR MADRIAGA
07/10/2025
Special inspection requirement — Mechanical Systems
JONAR MADRIAGA
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
IMEG CONSULTING CORP.208/29/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
OUTSOURCE CONSULTANTS, INC.403/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
OUTSOURCE SPECIAL INSPECT2827208/29/2025
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
07/15/2025Post-installed AnchorsJONAR MADRIAGAspecial
07/15/2025Energy Code Compliance InspectionsJONAR MADRIAGAprogress
07/15/2025HVAC-R and service water heating equipmentJONAR MADRIAGAenergy_progress
07/15/2025Fire-Resistant Penetrations and JointsJONAR MADRIAGAspecial
07/15/2025HVAC-R and service water heating system controlsJONAR MADRIAGAenergy_progress
07/15/2025Maintenance informationJONAR MADRIAGAenergy_progress
07/15/2025HVAC-R and service water piping design and insulationJONAR MADRIAGAenergy_progress
07/10/2025FinalJONAR MADRIAGAprogress
07/10/2025Mechanical SystemsJONAR MADRIAGAspecial
▾Documents — 17 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/20/2026B01254235-I1Request digital key ↗
08/20/2026B01254235-S1Request digital key ↗
▸Seals & Professional Certifications11
▸DOB NOWProgress Inspector Seal & Signature6
09/02/2026B01254235-I1Open ↗
09/02/2026B01254235-I1Open ↗
09/02/2026B01254235-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/02/2026B01254235-I1Open ↗
08/24/2026B01254235-S1Open ↗
08/24/2026B01254235-S1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/20/2026B01254235-I1Open ↗
08/20/2026B01254235-S1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/20/2026B01254235-S1Open ↗
08/20/2026B01254235-I1Open ↗
▸Approvals, Objections & Sign-offs2
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter2
08/13/2026B01254235-I1Open ↗
08/13/2026B01254235-S1Open ↗