← Back
Elevator cooperative
221 MCDONALD AVENUE
BROOKLYN · BIN 3327360
💬 Discuss this project
1953Year Built
6Stories
D4Building Class
R5Zoning
156,170 sfGross Floor Area
166Units
LL97 CoveredRent Stabilized3 Open Violations ▸FDNY Report ↗
Elevator cooperative · Owner of record: 221 MCDONALD AVE LLC · 57,891 sf lot · 2.7 FAR built · Flood zone X
Locations of Work
Architecture
Roof1p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
IMPACT REAL ESTATE MANAGEMENT407/08/2026
221 MCDONALD AVE LLC203/22/2026
SUGANDHA REALTY CORP.103/22/2026
G S L ENTERPRISE303/22/2026
HAMILTON CO-OP103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ULTERIOR MODE103/19/2025
MOORE ASSOCIATES, LLC110/22/2024
DHD ARCHITECTURE DESIGN PLLC102/04/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DHD ARCHITECTURE203/21/2026
I L CONSULTING203/21/2026
MOORE ENGINEERING OF NY D P C203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SAUBERMAN, ALVINElectrical203/21/2026
KONARZEWSKI, TADEUSZElectrical203/21/2026
TSONTOS CONSTRUCTION LLCGeneral Contractor203/21/2026
TIGER GENERAL CONTRACTORGeneral Contractor104/09/2026
SCHNEIDER, DANIELElectrical103/21/2026
BUILDING RITEElectrical103/21/2026
MP WALLS INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MOORE ENG. OF NY, DPC9134110/22/2024
Building Lifecycle
All (69)Filed (3)Permit Issued (3)Signed Off (3)Violation (60)
05/05/2026
Violation issued (HPD, open)
A
03/10/2026
Signed off — Alteration
B01192115-I1
06/10/2025
Violation issued (HPD, closed)
A
04/21/2025
Permit issued — General Construction
B01192115-I1-GC
03/19/2025
Filed — Alteration
B01192115-I1
03/11/2025
Signed off — Alteration
EXTERIOR FACADE REPAIRS. WORK SHALL INCLUDE MORTAR JOINT REPOINTING, CRACKED BRICK, COPING STONE, AND LINTEL REPLACEMENT, LINTEL SURFACE REFURBISHMENT AND CAULKING REPLACEMENT. NO CHANGE IN USE OR EGRESS.
B01126980-I1
12/05/2024
Permit issued — General Construction
B01126980-I1-GC
10/22/2024
Filed — Alteration
EXTERIOR FACADE REPAIRS. WORK SHALL INCLUDE MORTAR JOINT REPOINTING, CRACKED BRICK, COPING STONE, AND LINTEL REPLACEMENT, LINTEL SURFACE REFURBISHMENT AND CAULKING REPLACEMENT. NO CHANGE IN USE OR EGRESS.
B01126980-I1
08/03/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/03/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/03/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/09/2022
Violation issued (HPD, closed)
I
08/03/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/02/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/01/2022
Violation issued (HPD, closed)
A
03/01/2022
Violation issued (HPD, closed)
I
06/15/2021
Signed off — Alteration
B00464283-I1
04/30/2021
Permit issued — General Construction
B00464283-I1-GC
04/12/2021
Violation issued (HPD, closed)
A
02/04/2021
Filed — Alteration
B00464283-I1
10/30/2019
Violation issued (HPD, closed)
I
12/28/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
12/28/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/31/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/18/2018
Violation issued (HPD, closed)
I
09/18/2018
Violation issued (ECB, closed)
Construction
08/09/2018
Violation issued (ECB, closed)
Construction
09/15/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/15/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/03/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/03/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/09/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
12/09/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
11/10/2016
Violation issued (HPD, closed)
I
10/13/2015
Violation issued (HPD, closed)
I
07/27/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
07/27/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/15/2015
Violation issued (ECB, closed)
Unknown
03/31/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/31/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2013
Violation issued (FDNY_NOV, closed)
06/06/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
12/20/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
12/20/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/22/2012
Violation issued (HPD, closed)
B
05/22/2012
Violation issued (HPD, closed)
A
12/14/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
12/14/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/08/2010
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/01/2010
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
12/31/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
03/04/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
03/04/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
06/04/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
06/04/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/06/2006
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/06/2006
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
03/22/1996
Violation issued (ECB, closed)
Elevators
03/22/1996
Violation issued (ECB, closed)
Elevators
03/22/1996
Violation issued (ECB, closed)
Elevators
Latest 60 of 69 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offTIGER GENERAL CONTRACTOR04/21/2025
DOB NOWGeneral ConstructionSigned-offTSONTOS CONSTRUCTION LLC12/05/2024
DOB NOWGeneral ConstructionSigned-offMP WALLS INC04/30/2021
BISOTISSUEDCGC RESTORATION INC07/27/2020
BISOTISSUEDLAKE CONTRACTING LLC07/12/2018
BISOTISSUEDLAKE CONTRACTING LLC05/15/2018
BISOTISSUEDCGC RESTORATION INC06/20/2017
4 projects · most recent 08/19/2026
General Wiring
FiledStatusContractorScope
08/19/2026CompleteE & M ELECTRICAL NY CORP—
05/04/2022Permit IssuedE & M ELECTRICAL NY CORP—
03/18/2022Permit IssuedLINTECH ELECTRIC, INCGeneral Wiring
09/08/2020Permit IssuedPINPOINT ELECTRIC CORPGeneral Wiring
Nothing on file for this building.
▾Documents — 63 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch2
08/23/2026B01126980-I1Request digital key ↗
08/22/2026B01192115-I1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction1
09/01/2026B00464283-I1Request digital key ↗
▸Applications & Permits11
▸BISWORK PERMIT APPLICATION5
08/14/2019340513625Open ↗
07/13/2018321675816Open ↗
05/16/2018321675816Open ↗
Showing 3 of 5 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION4
01/14/2019321675816Open ↗
07/16/2018321675816Open ↗
10/26/2017321675816Open ↗
Showing 3 of 4 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
07/10/2018321675816Open ↗
11/14/2017321675816Open ↗
▸Seals & Professional Certifications14
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
08/01/2019321675816Open ↗
08/01/2019321675816Open ↗
07/16/2018321675816Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
10/27/2017321675816Open ↗
10/26/2017321675816Open ↗
06/14/2017340513625Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature3
09/01/2026B00464283-I1Open ↗
08/22/2026B01192115-I1Open ↗
08/13/2026B01126980-I1Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
07/16/2018321675816Open ↗
10/26/2017321675816Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
06/14/2017340513625Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
06/14/2017340513625Open ↗
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
10/26/2017321675816Open ↗
▸Environmental & Asbestos4
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
03/12/2018321675816Open ↗
06/14/2017340513625Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/22/2026B01192115-I1Open ↗
08/13/2026B01126980-I1Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
08/01/2019321675816Open ↗
08/01/2019321675816Open ↗
10/26/2017321675816Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
06/14/2017340513625Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
08/01/2019321675816Open ↗
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
08/01/2019321675816Open ↗
08/01/2019321675816Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
08/01/2019321675816Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
06/14/2017340513625Open ↗
▸BISTR2: CONCRETE TEST CYLINDERS TECHNICAL REPORT1
07/16/2018321675816Open ↗
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT1
07/16/2018321675816Open ↗
▸Approvals, Objections & Sign-offs6
▸BISLETTERS - SUPPORTING DOCUMENTATION4
08/01/2019321675816Open ↗
08/01/2019321675816Open ↗
08/01/2019321675816Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
08/29/2019321675816Open ↗
08/01/2019321675816Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT5
08/01/2019321675816Open ↗
08/01/2019321675816Open ↗
01/14/2019321675816Open ↗
Showing 3 of 5 on file for this type
▸Filing & Intake Forms8
▸BISADDITIONAL INFORMATION3
12/20/2018321675816Open ↗
07/16/2018321675816Open ↗
03/12/2018321675816Open ↗
▸BISBOROUGH INTAKE FORM3
08/29/2019321675816Open ↗
08/29/2019321675816Open ↗
08/01/2019321675816Open ↗
▸BISEFILING COVER SHEET1
11/02/2017321675816Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
06/14/2017340513625Open ↗