← Back
Elevator apt, semi-fireproof without stores
2064 CROPSEY AVENUE
BROOKLYN · BIN 3328500
💬 Discuss this project
1948Year Built
6Stories
D1Building Class
R6Zoning
316,900 sfGross Floor Area
420Units
LL97 CoveredRent Stabilized10 Open Violations ▸FDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: SHORE HAVEN APARTMENTS DEL LLC · 165,700 sf lot · 1.91 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
REVONA PROPERTIES403/22/2026
SHORE HAVEN APARTMENTS DEL603/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JAMES A CLANCY205/12/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ARC DESIGN CONSULTING403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BEST ENERGY POWER 2015 LLGeneral Contractor303/21/2026
CREATIVE CABLNG & BERTRAMElectrical203/22/2026
CURRENT MECHS ELEC CONTSElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ETRECTE LLC8116205/12/2025
Building Lifecycle
All (68)Filed (2)Permit Issued (1)Violation (60)Special Inspection (5)
10/06/2025
Violation issued (HPD, closed)
B
10/06/2025
Violation issued (HPD, closed)
B
10/06/2025
Violation issued (HPD, closed)
B
10/06/2025
Violation issued (HPD, closed)
B
10/06/2025
Violation issued (HPD, closed)
B
10/06/2025
Violation issued (HPD, closed)
B
10/06/2025
Violation issued (HPD, closed)
B
10/06/2025
Violation issued (HPD, closed)
B
10/06/2025
Violation issued (HPD, closed)
B
07/29/2025
Violation issued (HPD, closed)
C
07/29/2025
Violation issued (HPD, closed)
C
05/12/2025
Filed — Alteration
INSTALLATION OF SOLAR PV SYSTEM ON THE EXISITING ROOFTOP. NO CHANGES TO THE EGRESS USE OR OCCUPANCY.
B00994404-P1
05/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
VYACHESLAV NECHAYEV
05/07/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
VYACHESLAV NECHAYEV
05/07/2025
Special inspection requirement — Energy Code Compliance Inspections
James Clancy
05/07/2025
Special inspection requirement — Final
James Clancy
05/07/2025
Special inspection requirement — Air barrier - visual inspection
James Clancy
07/24/2024
Permit issued — Solar
B00994404-I1-SL
07/18/2024
Violation issued (HPD, closed)
C
07/18/2024
Violation issued (HPD, closed)
B
07/18/2024
Violation issued (HPD, closed)
C
07/18/2024
Violation issued (HPD, closed)
C
07/18/2024
Violation issued (HPD, closed)
A
07/18/2024
Violation issued (HPD, closed)
C
07/18/2024
Violation issued (HPD, closed)
C
07/18/2024
Violation issued (HPD, closed)
B
07/18/2024
Violation issued (HPD, closed)
C
07/18/2024
Violation issued (HPD, closed)
A
07/18/2024
Violation issued (HPD, closed)
A
07/18/2024
Violation issued (HPD, closed)
A
07/17/2024
Filed — Alteration
INSTALLATION OF SOLAR PV SYSTEM ON THE EXISITING ROOFTOP. NO CHANGES TO THE EGRESS USE OR OCCUPANCY.
B00994404-I1
07/11/2024
Violation issued (HPD, closed)
B
07/11/2024
Violation issued (HPD, closed)
B
07/11/2024
Violation issued (HPD, closed)
B
07/11/2024
Violation issued (HPD, closed)
B
07/11/2024
Violation issued (HPD, closed)
B
07/11/2024
Violation issued (HPD, closed)
B
07/11/2024
Violation issued (HPD, closed)
B
07/11/2024
Violation issued (HPD, closed)
B
07/11/2024
Violation issued (HPD, closed)
B
06/22/2024
Violation issued (HPD, closed)
B
06/22/2024
Violation issued (HPD, closed)
B
06/22/2024
Violation issued (HPD, closed)
B
06/22/2024
Violation issued (HPD, closed)
B
06/22/2024
Violation issued (HPD, closed)
B
06/22/2024
Violation issued (HPD, closed)
B
05/06/2024
Violation issued (HPD, closed)
C
01/16/2024
Violation issued (HPD, closed)
A
01/16/2024
Violation issued (HPD, closed)
C
01/16/2024
Violation issued (HPD, closed)
C
01/16/2024
Violation issued (HPD, closed)
A
01/16/2024
Violation issued (HPD, closed)
A
01/08/2024
Violation issued (HPD, closed)
A
01/08/2024
Violation issued (HPD, closed)
B
01/08/2024
Violation issued (HPD, closed)
A
01/08/2024
Violation issued (HPD, closed)
C
01/08/2024
Violation issued (HPD, closed)
C
01/08/2024
Violation issued (HPD, closed)
B
01/08/2024
Violation issued (HPD, closed)
A
01/08/2024
Violation issued (HPD, closed)
C
Latest 60 of 68 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offBEST ENERGY POWER 2015 LL07/24/2024
3 projects · most recent 04/17/2025
General Wiring
FiledStatusContractorScope
04/17/2025CompleteCREATIVE CABLNG & BERTRAM—
10/09/2024CompleteCURRENT MECHS ELEC CONTSGeneral Wiring
10/30/2022CompleteTUXEDO ELEC'L CONTR'G INC—
1 project · most recent 05/12/2025
FiledStatusContractorScope
05/12/2025Signed-offBEST ENERGY POWER 2015 LL94 panels, 45.12 kw, 20,900 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
05/07/2025Fire-Resistant Penetrations and JointsVYACHESLAV NECHAYEVspecial
05/07/2025Structural Stability – Alterations of existing buildingsVYACHESLAV NECHAYEVspecial
05/07/2025Energy Code Compliance InspectionsJames Clancyprogress
05/07/2025FinalJames Clancyprogress
05/07/2025Air barrier - visual inspectionJames Clancyenergy_progress
▾Documents — 18 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/24/2026B00994404-I1Request digital key ↗
08/24/2026B00994404-P1Request digital key ↗
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION2
01/11/2024340906425Open ↗
12/04/2023340906425Open ↗
▸Seals & Professional Certifications7
▸DOB NOWProgress Inspector Seal & Signature3
08/29/2026B00994404-P1Open ↗
08/29/2026B00994404-P1Open ↗
08/29/2026B00994404-P1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/24/2026B00994404-I1Open ↗
08/13/2026B00994404-P1Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
12/04/2023340906425Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/29/2026B00994404-P1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/24/2026B00994404-I1Open ↗
08/13/2026B00994404-P1Open ↗
▸Energy Compliance1
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
12/04/2023340906425Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
12/04/2023340906425Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026B00994404-I1Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
12/04/2023340906425Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
12/04/2023340906425Open ↗