← Back
Elevator apt, semi-fireproof without stores
8831 20 AVENUE
BROOKLYN · BIN 3328519
💬 Discuss this project
1948Year Built
6Stories
D1Building Class
R6Zoning
356,010 sfGross Floor Area
462Units
LL97 CoveredRent Stabilized16 Open Violations 15 unresolved · 1 paperwork only ▸FISP: SWARMPFDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: SHORE HAVEN APARTMENTS DEL LLC · 151,750 sf lot · 2.35 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
532 NEPTUNE AVENUE507/08/2026
SHORE HAVEN APARTMENTS DEL403/22/2026
IRWIN DURBEN/AS TRUST103/22/2026
THE TRUMP ORGANIZATION103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RISE ARCHITECTURE308/10/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JACK JAFFA ASSOCIATES603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CURRENT MECHS ELEC CONTSElectrical203/22/2026
BUSA BUILDERS LLCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BIG APPLE GROUP NY A RMA9168104/25/2022
Building Lifecycle
All (84)Filed (3)Permit Issued (1)Signed Off (1)Facade (FISP) (9)Violation (60)Objection (6)Special Inspection (4)
06/14/2026
Violation issued (HPD, closed)
C
06/14/2026
Violation issued (HPD, closed)
B
05/03/2024
Signed off — Alteration
PROPOSED CONCRETE SLAB FOR EXTERIOR COMPACTOR PLACEMENT, AS PER PLANS FILED HEREWITH.NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00702480-I1
04/03/2024
Violation issued (HPD, closed)
C
04/03/2024
Violation issued (HPD, closed)
B
10/16/2023
Permit issued — General Construction
B00702480-I1-GC
09/26/2023
Special inspection requirement — Concrete - Cast-In-Place
SOORJBALLY HARILALL
09/26/2023
Special inspection requirement — Final
Soorjbally Harilall
09/21/2023
Objection resolved — Addressed
08/14/2023
Objection raised — Scope
08/10/2023
Filed — Alteration
PROPOSED CONCRETE SLAB FOR EXTERIOR COMPACTOR PLACEMENT, AS PER PLANS FILED HEREWITH.NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00702480-P1
01/24/2023
Cycle 9 facade report signed — SWARMP
01/23/2023
Cycle 9 facade report submitted
01/04/2023
Cycle 9 facade inspection completed
11/30/2022
Special inspection requirement — Concrete - Cast-In-Place
11/30/2022
Special inspection requirement — Final
05/10/2022
Objection raised — Zoning
04/27/2022
Objection raised — Scope
04/27/2022
Objection resolved — Addressed
04/27/2022
Objection raised — Scope
04/25/2022
Filed — Alteration
PROPOSED CONCRETE SLAB FOR EXTERIOR COMPACTOR PLACEMENT, AS PER PLANS FILED HEREWITH.NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00702480-I1
04/25/2022
Filed — Alteration
INSTALLATION OF 59' CURB CUT ON THE STREET BACKSTAGE, AS PER PLANS FILED HEREWITH.
B00694931-I1
10/23/2020
Violation issued (HPD, closed)
C
10/23/2020
Violation issued (HPD, closed)
A
10/23/2020
Violation issued (HPD, closed)
B
08/31/2020
Violation issued (HPD, closed)
B
08/31/2020
Violation issued (HPD, closed)
B
08/31/2020
Violation issued (HPD, closed)
B
07/29/2020
Violation issued (HPD, closed)
B
06/10/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
12/11/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/24/2019
Violation issued (HPD, closed)
C
11/24/2019
Violation issued (HPD, closed)
C
09/16/2019
Violation issued (ECB, closed)
Elevators
05/06/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
09/24/2018
Violation issued (HPD, closed)
A
09/24/2018
Violation issued (HPD, closed)
B
04/13/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
08/17/2017
Violation issued (HPD, closed)
B
08/17/2017
Violation issued (HPD, closed)
B
08/17/2017
Violation issued (HPD, closed)
B
06/22/2017
Violation issued (ECB, closed)
Construction
04/05/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/05/2017
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/21/2016
Cycle 8 facade report submitted
06/10/2016
Cycle 8 facade report signed — SAFE
06/02/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/17/2016
Cycle 8 facade inspection completed
09/21/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/22/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/02/2014
Violation issued (HPD, closed)
B
10/02/2014
Violation issued (HPD, closed)
B
10/02/2014
Violation issued (HPD, closed)
A
10/02/2014
Violation issued (HPD, closed)
A
10/02/2014
Violation issued (HPD, closed)
B
10/02/2014
Violation issued (HPD, closed)
B
06/15/2014
Violation issued (HPD, closed)
C
06/15/2014
Violation issued (HPD, closed)
A
04/26/2014
Violation issued (HPD, closed)
B
04/26/2014
Violation issued (HPD, closed)
B
Latest 60 of 84 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offBUSA BUILDERS LLC10/16/2023
4 projects · most recent 02/21/2023
General Wiring
FiledStatusContractorScope
02/21/2023CompleteCURRENT MECHS ELEC CONTSGeneral Wiring
10/23/2022CompleteTUXEDO ELEC'L CONTR'G INC—
05/20/2022CompleteCURRENT MECHS ELEC CONTS85 meters, 1 new_meters
04/01/2022CompleteCURRENT MECHS ELEC CONTS—
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
09/26/2023Concrete - Cast-In-PlaceSOORJBALLY HARILALLspecial
09/26/2023FinalSoorjbally Harilallprogress
11/30/2022Concrete - Cast-In-Place—special
11/30/2022Final—progress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/29/2026B00702480-I1Request digital key ↗
08/15/2026B00702480-P1Request digital key ↗
08/14/2026B00694931-I1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/29/2026B00702480-P1Open ↗
08/29/2026B00702480-I1Open ↗
08/13/2026B00694931-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/24/2026B00702480-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/24/2026B00702480-I1Open ↗