DOB11/14/2025VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
DOB09/23/2024VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
DOB06/15/2023AT TIME OF INSPECTION OBSERVED FACADE AT ALL EXPOSURE IN STATE OF DISREPAIR. LARGE VERTICAL CRACKS DAMAGED BRICKS AT MULTIPLE LOCATIONS, WALL AT EXP#2 HAVE CRACKS AND LEANING..
DOB04/25/2023VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
DOB07/27/2013V-DOB VIOLATION - ACTIVE
ECB10/11/2023FAILURE TO COMPLY WITH COMISSIONER'S ORDER IN DOB VIOLATION VIO23-018775, DATED 6/15/2023. RESPONDENT WAS REQUIRED TO SUBMIT AN ENGINEER'S REPORT CONCERNING STRUCTURALLY DEFICIENT CONDITIONS. AS OF 10/11/2023,Nothing owed — awaiting certificate of correction
ECB06/26/2023AT TIME OF INSPECTION OBSERVED FACADE AT ALL EXPOSURE IN STATE OF DISREPAIR. LARGE VERTICAL CRACKS DAMAGED BRICKS AT MULTIPLE LOCATIONS, WALL AT EXP#2 HAVE CRACKS AND LEANING.. VACATE 15' ENTIRE AREA ALONG EXP#Nothing owed — awaiting certificate of correction
ECB12/02/2020PROVIDE EASY AVAILABILITY OF KEYS ON PREMISES IN ORDER TO PERFORM FULL INSPECTION OF THIS DEVICENothing owed — awaiting certificate of correction
ECB05/25/2016FAILURE TO MAINTAIN BLDG WALL(S)OR APPURTENANCES.NOTED:2 STORY MASONRYBLDG HAS @CORNERS OF BLDG CERTICAL CRACKS@ EXP#2 BRICK COLUMN HAS A LARGE VERTICAL CRACK AT SEAM & COLUMN HAS SLIGHTLY SHIFTED,ALSO NOTED @SNothing owed — awaiting certificate of correction