← Back
Primarily 2 family with 1 store or office
2481 MCDONALD AVENUE
BROOKLYN · BIN 3329381
💬 Discuss this project
1931Year Built
1Stories
S2Building Class
M1-1Zoning
2,879 sfGross Floor Area
3Units
0 Open ViolationsFDNY Report ↗
Primarily 2 family with 1 store or office · 6,350 sf lot · 0.45 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SOLTAGE1007/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
STROH ENGINEERING SERVICES, P.C.309/18/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EXPEDITE DEM603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BREAKING SOLUTIONS,INCGeneral Contractor307/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
STROH ENGINEERING SERVICE3316107/14/2025
Building Lifecycle
All (13)Filed (3)Permit Issued (3)Signed Off (1)Inspection (2)Objection (2)Special Inspection (2)
12/18/2025
Signed off — Full Demolition
mechanical equipment will be used to assist with demolition.
B01221081-I1
12/04/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
11/12/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
11/05/2025
Permit issued — Full Demolition
B01221081-I1-FD
11/03/2025
Permit issued — Protection and Mechanical Methods
B01221081-S2-PMM
11/03/2025
Permit issued — Construction Fence
B01221081-S1-FN
09/18/2025
Filed — Full Demolition
mechanical equipment will be used to assist with demolition.
B01221081-S2
09/18/2025
Filed — Full Demolition
mechanical equipment will be used to assist with demolition.
B01221081-S1
09/16/2025
Objection resolved — Addressed
07/28/2025
Objection raised — Other
07/14/2025
Filed — Full Demolition
mechanical equipment will be used to assist with demolition.
B01221081-I1
05/05/2025
Special inspection requirement — Demolition
PETER STROH
05/05/2025
Special inspection requirement — Structural Stability – Alterations of existing Buildings
PETER STROH
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFull DemolitionSigned-offBREAKING SOLUTIONS,INC11/05/2025
DOB NOWProtection and Mechanical MethodsSigned-offBREAKING SOLUTIONS,INC11/03/2025
DOB NOWConstruction FenceSigned-offBREAKING SOLUTIONS,INC11/03/2025
1 project · most recent 09/18/2025
Fence
FiledStatusContractorScope
09/18/2025Signed-offBREAKING SOLUTIONS,INCFence
1 project · most recent 09/18/2025
Full Demolition Notification
FiledStatusContractorScope
09/18/2025Signed-offBREAKING SOLUTIONS,INCFull Demolition Notification
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
12/04/2025Pass-Final General Construction Non-Directive 14PassView ↗
11/12/2025Fail-Final General Construction Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
05/05/2025DemolitionPETER STROHspecial
05/05/2025Structural Stability – Alterations of existing BuildingsPETER STROHspecial
▾Documents — 18 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/21/2026B01221081-S2Request digital key ↗
08/21/2026B01221081-S1Request digital key ↗
08/21/2026B01221081-I1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/21/2026B01221081-S2Open ↗
08/21/2026B01221081-S1Open ↗
08/21/2026B01221081-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/27/2026B01221081-I1Open ↗
08/27/2026B01221081-I1Open ↗
▸Trade Schedules & Equipment4
▸DOB NOWElectric Cut-Off1
08/13/2026B01221081-I1Open ↗
▸DOB NOWWater Cut-Off1
08/13/2026B01221081-I1Open ↗
▸DOB NOWGas Cut-Off1
08/13/2026B01221081-I1Open ↗
▸DOB NOWSewer Cut-Off1
08/13/2026B01221081-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/21/2026B01221081-I1Open ↗
▸DOB NOWRodent Control1
08/13/2026B01221081-I1Open ↗
▸Other Documents4
▸DOB NOWCommunity Board Notification1
08/13/2026B01221081-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/21/2026B01221081-I1Open ↗
▸DOB NOWFull Demo: 10-Day Notice1
08/13/2026B01221081-I1Open ↗
▸DOB NOWStructure Photographs1
08/13/2026B01221081-I1Open ↗