← Back
Primarily 2 family with 1 store or office
2481 MCDONALD AVENUE
BROOKLYN · BIN 3329382
💬 Discuss this project
1931Year Built
1Stories
S2Building Class
M1-1Zoning
2,879 sfGross Floor Area
3Units
1 Open Violation ▸FDNY Report ↗
Primarily 2 family with 1 store or office · 6,350 sf lot · 0.45 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SOLTAGE1607/08/2026
PLATINUM SERVICES NY507/08/2026
BREAKING SOLUTION INC203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ALWAYS FAST SERVICES CORP109/23/2025
STROH ENGINEERING SERVICES, P.C.309/18/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EXPEDITE DEM603/21/2026
WILLIAM VITACCO ASSOCIATES403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BREAKING SOLUTIONS,INCGeneral Contractor507/08/2026
PLATINUM SERVICES NY LLCGeneral Contractor207/08/2026
GRACE INDUSTRIES LLCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
STROH ENGINEERING SERVICE3316107/14/2025
Building Lifecycle
All (13)Filed (4)Permit Issued (5)Signed Off (2)Violation (2)
06/09/2026
Signed off — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AND CONSTRUCTION FENCE AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE NYC CODE 2022, NO CHANGES IN USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01291595-I1
12/18/2025
Signed off — Full Demolition
full demolition of one story structure, using hand held and mechanical means
B01215905-I1
11/18/2025
Violation issued (ECB, closed)
Construction
11/05/2025
Permit issued — Full Demolition
B01215905-I1-FD
11/03/2025
Permit issued — Construction Fence
B01215905-S1-FN
11/03/2025
Permit issued — Protection and Mechanical Methods
B01215905-S2-PMM
09/23/2025
Filed — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AND CONSTRUCTION FENCE AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE NYC CODE 2022, NO CHANGES IN USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01291595-I1
09/23/2025
Permit issued — Construction Fence
B01291595-I1-FN
09/23/2025
Permit issued — Sidewalk Shed
B01291595-I1-SH
09/18/2025
Filed — Full Demolition
full demolition of one story structure, using hand held and mechanical means
B01215905-S1
09/18/2025
Filed — Full Demolition
full demolition of one story structure, using hand held and mechanical means
B01215905-S2
07/14/2025
Filed — Full Demolition
full demolition of one story structure, using hand held and mechanical means
B01215905-I1
01/06/2020
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFull DemolitionSigned-offBREAKING SOLUTIONS,INC11/05/2025
DOB NOWConstruction FenceSigned-offBREAKING SOLUTIONS,INC11/03/2025
DOB NOWProtection and Mechanical MethodsSigned-offBREAKING SOLUTIONS,INC11/03/2025
DOB NOWConstruction FenceSigned-offPLATINUM SERVICES NY LLC09/23/2025
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC09/23/2025
1 project · most recent 09/23/2025
FiledStatusContractorScope
09/23/2025CompleteRICHARD NEU—
2 projects · most recent 09/23/2025
Fence Sidewalk Shed
FiledStatusContractorScope
09/23/2025Signed-offPLATINUM SERVICES NY LLCFence, Sidewalk Shed
09/18/2025Signed-offBREAKING SOLUTIONS,INCFence
1 project · most recent 09/18/2025
Full Demolition Notification
FiledStatusContractorScope
09/18/2025Signed-offBREAKING SOLUTIONS,INCFull Demolition Notification
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
05/05/2025DemolitionPETER STROHspecial
05/05/2025Structural Stability – Alterations of existing BuildingsPETER STROHspecial
▾Documents — 23 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/20/2026B01215905-I1Request digital key ↗
08/20/2026B01215905-S1Request digital key ↗
08/20/2026B01215905-S2Request digital key ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B01030570-I1Open ↗
▸Seals & Professional Certifications6
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/20/2026B01215905-I1Open ↗
08/20/2026B01215905-S1Open ↗
08/20/2026B01215905-S2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
08/24/2026B01215905-I1Open ↗
08/24/2026B01215905-I1Open ↗
▸Trade Schedules & Equipment4
▸DOB NOWSewer Cut-Off1
08/13/2026B01215905-I1Open ↗
▸DOB NOWElectric Cut-Off1
08/13/2026B01215905-I1Open ↗
▸DOB NOWWater Cut-Off1
08/13/2026B01215905-I1Open ↗
▸DOB NOWGas Cut-Off1
08/13/2026B01215905-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/13/2026B01030570-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/20/2026B01215905-I1Open ↗
▸DOB NOWRodent Control1
08/13/2026B01215905-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWOTCR Letter of Conditional Acceptance1
08/13/2026B01231504-I1Open ↗
▸Other Documents4
▸DOB NOWCommunity Board Notification1
08/13/2026B01215905-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/20/2026B01215905-I1Open ↗
▸DOB NOWFull Demo: 10-Day Notice1
08/13/2026B01215905-I1Open ↗
▸DOB NOWStructure Photographs1
08/13/2026B01215905-I1Open ↗