Factory, light manufacturing
200 BANKER STREET
BROOKLYN · BIN 3330094
💬 Discuss this project
1931Year Built
1Stories
F5Building Class
M1-5Zoning
3,800 sfGross Floor Area
2Units
Factory, light manufacturing · Owner of record: 202 L.M.S. LLC · 3,800 sf lot · 1 FAR built · Flood zone X500
Locations of Work
Architecture
Permit Issued — active, not yet Signed-off
Floor 2Under Construction8p · 1 filing · 20 docs
Floor 1Under Construction8p · 1 filing · 20 docs
1 job · most recent 08/08/2025
General Wiring
FiledStatusContractorScope
08/08/2025Permit IssuedA.S.H ELECTRIC CORPGeneral Wiring
Building Lifecycle
All (77)Filed (4)Permit Issued (4)Signed Off (3)Inspection (3)Objection (44)Special Inspection (19)
11/09/2025
Signed off — Alteration CO
CONVERT EXISTING COMMERCIAL SHOP TO EATING AND DRINKING ESTABLISHMENT. WORKS ON 1ST FLOOR ONLY. PROPOSE CHANGE OF USE AND OCCUPANCY. NO CHANGE OF EGRESS. OBTAIN NEW C OF O
B01200987-S1
10/16/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/02/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/02/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
09/17/2025
Permit issued — Plumbing
B01200987-S1-PL
09/03/2025
Permit issued — General Construction
B01200987-I1-GC
08/26/2025
Signed off — Alteration
Install Temporary Construction Fence as per plans filed. Filed in conjunction with Alt GC B01199678
B01199676-I1
08/12/2025
Signed off — Alteration
Replacement of the existing damaged interior stair at the same location. proposed enclosure of existing meters. No change of use, egress, or occupancy.
B01199678-I1
07/29/2025
Objection resolved — Addressed
07/11/2025
Objection raised — Energy
07/08/2025
Special inspection requirement — Lighting controls
Edwin Tang
06/27/2025
Objection resolved — Addressed
06/24/2025
Filed — Alteration CO
CONVERT EXISTING COMMERCIAL SHOP TO EATING AND DRINKING ESTABLISHMENT. WORKS ON 1ST FLOOR ONLY. PROPOSE CHANGE OF USE AND OCCUPANCY. NO CHANGE OF EGRESS. OBTAIN NEW C OF O
B01200987-S1
06/18/2025
Objection resolved — Addressed
06/18/2025
Objection resolved — Addressed
06/18/2025
Objection resolved — Addressed
06/13/2025
Objection raised — Fire_Protection
06/05/2025
Objection resolved — Addressed
06/05/2025
Objection resolved — Addressed
06/05/2025
Objection resolved — Addressed
06/05/2025
Objection resolved — Addressed
06/05/2025
Objection resolved — Addressed
06/05/2025
Objection resolved — Addressed
06/05/2025
Objection resolved — Addressed
06/05/2025
Objection resolved — Addressed
06/05/2025
Special inspection requirement — Air barrier - visual inspection
Edwin Tang
06/03/2025
Objection raised — Other
06/03/2025
Objection raised — Zoning
06/03/2025
Objection raised — Cost
06/03/2025
Objection raised — Admin
06/03/2025
Objection raised — Other
06/03/2025
Objection raised — Zoning
06/03/2025
Objection raised — Other
06/03/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
XIONGCAI GU
06/03/2025
Special inspection requirement — Maintenance information
XIONGCAI GU
06/03/2025
Special inspection requirement — HVAC-R and service water heating system controls
XIONGCAI GU
06/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIONGCAI GU
06/03/2025
Special inspection requirement — Energy Code Compliance Inspections
XIONGCAI GU
06/03/2025
Special inspection requirement — HVAC-R and service water heating equipment
XIONGCAI GU
05/27/2025
Objection raised — Scope
05/27/2025
Objection resolved — Addressed
05/23/2025
Objection resolved — Addressed
05/23/2025
Objection resolved — Addressed
05/23/2025
Objection resolved — Addressed
05/23/2025
Objection resolved — Addressed
05/23/2025
Objection resolved — Addressed
05/23/2025
Objection resolved — Addressed
05/23/2025
Objection resolved — Addressed
05/23/2025
Objection resolved — Addressed
05/23/2025
Special inspection requirement — Post-installed Anchors
JIAN DENG
05/21/2025
Objection raised — Scope
05/21/2025
Objection raised — Zoning
05/21/2025
Objection raised — Fire_Protection
05/21/2025
Objection raised — Code
05/21/2025
Objection raised — Structural
05/21/2025
Objection raised — Code
05/21/2025
Objection raised — Code
05/21/2025
Objection raised — Code
05/21/2025
Objection raised — Structural
05/21/2025
Objection raised — Code
Latest 60 of 77 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BOLT BUILDS904/09/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TANG STUDIO ARCHITECT, LLC406/24/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
TANG STUDIO LLC603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BOLT BUILDS INCGeneral Contractor704/09/2026
KISHAN PLUMBING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
G ENGINEERING PC7778106/24/2025
JIAN ENGINEERING PLLC7397105/09/2025
TANG STUDIO LLC6949205/09/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offN AND S PLUMBING INC09/17/2025
DOB NOWGeneral ConstructionPermit IssuedBOLT BUILDS INC09/03/2025
DOB NOWGeneral ConstructionSigned-offBOLT BUILDS INC05/07/2025
DOB NOWConstruction FenceSigned-offBOLT BUILDS INC04/25/2025
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
10/16/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/02/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/02/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
07/08/2025Lighting controlsEdwin Tangenergy_progress
06/05/2025Air barrier - visual inspectionEdwin Tangenergy_progress
06/03/2025HVAC-R and service water piping design and insulationXIONGCAI GUenergy_progress
06/03/2025Maintenance informationXIONGCAI GUenergy_progress
06/03/2025HVAC-R and service water heating system controlsXIONGCAI GUenergy_progress
06/03/2025Fire-Resistant Penetrations and JointsXIONGCAI GUspecial
06/03/2025Energy Code Compliance InspectionsXIONGCAI GUprogress
06/03/2025HVAC-R and service water heating equipmentXIONGCAI GUenergy_progress
05/23/2025Post-installed AnchorsJIAN DENGspecial
04/22/2025Interior lighting powerEdwin Tangenergy_progress
04/22/2025Fire-Resistant Penetrations and JointsEdwin Tangspecial
04/22/2025Energy Code Compliance InspectionsEdwin Tangprogress
04/22/2025Fire-Resistance Rated ConstructionEdwin Tangprogress
04/22/2025Fenestration areasEdwin Tangenergy_progress
04/22/2025Fenestration and door U-factor and product ratingsEdwin Tangenergy_progress
04/22/2025Fenestration air leakageEdwin Tangenergy_progress
04/22/2025Insulation placement and R valuesEdwin Tangenergy_progress
04/11/2025FinalEdwin Tangprogress
04/11/2025Fire-Resistant Penetrations and JointsEdwin Tangspecial
▾Documents — 40 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/21/2026B01199678-I1Request digital key ↗
08/21/2026B01199676-I1Request digital key ↗
08/21/2026B01200987-S1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits1
▸BISPLAN / WORK APPROVAL APPLICATION1
01/18/2011320260926Open ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B01200987-I1Open ↗
▸Seals & Professional Certifications17
▸DOB NOWProgress Inspector Seal & Signature8
09/19/2026B01200987-S1Open ↗
09/19/2026B01200987-S1Open ↗
09/19/2026B01200987-S1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/21/2026B01199678-I1Open ↗
08/21/2026B01200987-I1Open ↗
08/21/2026B01200987-S1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/19/2026B01200987-S1Open ↗
08/28/2026B01199678-I1Open ↗
08/26/2026B01200987-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
01/18/2011320260926Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING1
01/18/2011320260926Open ↗
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist1
08/13/2026B01200987-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026B01200987-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026B01200987-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B01200987-I1Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/21/2026B01199678-I1Open ↗
08/21/2026B01200987-S1Open ↗
08/21/2026B01200987-I1Open ↗
▸DOB NOWOER: Notice to Proceed2
08/13/2026B01200987-I1Open ↗
08/13/2026B01200987-S1Open ↗
▸DOB NOWOER: Notice of Satisfaction2
08/13/2026B01200987-S1Open ↗
08/13/2026B01200987-I1Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
01/18/2011320260926Open ↗
▸Approvals, Objections & Sign-offs1
▸BISADMINISTRATIVE OBJECTIONS1
01/18/2011320260926Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
01/18/2011320260926Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
01/18/2011320260926Open ↗
▸Other Documents1
▸DOB NOWProperty Ownership Certification1
08/21/2026B01200987-I1Open ↗