← Back
Office only, 2-6 stories
971 DEAN STREET
BROOKLYN · Crown Heights (North) · BIN 3330767
💬 Discuss this project
1930Year Built
2Stories
O2Building Class
M1-2A/R6AZoning
31,145 sfGross Floor Area
1Units
13 Open Violations 0 unresolved · 13 paperwork only ▸
Office only, 2-6 stories · Owner of record: BYG REALTY CORP · 37,620 sf lot · 0.83 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingFire ProtectionGeneral
Roof6p · 1 filing · 13 docs
Bulkhead1p · 1 filing · 13 docs
Floor 114p · 1 filing · 13 docs
Floor 103p · 1 filing · 13 docs
Floor 93p · 1 filing · 13 docs
Floor 84p · 1 filing · 13 docs
Floor 71p · 1 filing · 13 docs
Floor 62p · 1 filing · 13 docs
Floor 52p · 1 filing · 13 docs
Floor 42p · 1 filing · 13 docs
Floor 32p · 1 filing · 13 docs
Floor 24p · 1 filing · 13 docs
Floor 19p · 1 filing · 13 docs
Cellar5p · 1 filing · 13 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PIFR REAL ESTATE HOLDINGS209/13/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
STRUCTURAL ENGINEERING TECHNOLOGIES208/25/2026
VASILIOS ARTEMIOU208/25/2026
KAO HWA LEE ARCHITECTS PC206/25/2026
Building Lifecycle
All (24)Filed (6)Objection (4)Special Inspection (14)
08/25/2026
Filed — New Building
(Please assign to dev hub, it should be assigned to same examiner as job B01390460-I1 and B01390458-I1 as its same zoning lot with same scope of work, applicant and owner) PROPOSED NEW 11 STORY AND CELLAR 82 UNIT MIXED USE BUILDING
B01390326-S2
08/25/2026
Filed — New Building
(Please assign to dev hub, it should be assigned to same examiner as job B01390460-I1 and B01390458-I1 as its same zoning lot with same scope of work, applicant and owner) PROPOSED NEW 11 STORY AND CELLAR 82 UNIT MIXED USE BUILDING
B01390326-S3
08/25/2026
Filed — New Building
(Please assign to dev hub, it should be assigned to same examiner as job B01390460-I1 and B01390458-I1 as its same zoning lot with same scope of work, applicant and owner) PROPOSED NEW 11 STORY AND CELLAR 82 UNIT MIXED USE BUILDING
B01390326-S5
08/18/2026
Special inspection requirement — Standpipe Systems
08/18/2026
Special inspection requirement — Sprinkler Systems
08/18/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
08/18/2026
Special inspection requirement — Post-installed Anchors
08/14/2026
Objection raised — Other
08/12/2026
Special inspection requirement — Concrete - Cast-In-Place
08/07/2026
Filed — New Building
(Please assign to dev hub, it should be assigned to same examiner as job B01390460-I1 and B01390458-I1 as its same zoning lot with same scope of work, applicant and owner) PROPOSED NEW 11 STORY AND CELLAR 82 UNIT MIXED USE BUILDING
B01390326-S4
08/06/2026
Special inspection requirement — Post-installed Anchors
08/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
08/05/2026
Special inspection requirement — Standpipe Systems
07/28/2026
Special inspection requirement — Final
06/29/2026
Objection resolved — Open
06/26/2026
Objection raised — Other
06/25/2026
Filed — New Building
(Please assign to dev hub, it should be assigned to same examiner as job B01390460-I1 and B01390458-I1 as its same zoning lot with same scope of work, applicant and owner) PROPOSED NEW 11 STORY AND CELLAR 82 UNIT MIXED USE BUILDING
B01390326-S1
06/02/2026
Objection raised — Other
04/29/2026
Filed — New Building
(Please assign to dev hub, it should be assigned to same examiner as job B01390460-I1 and B01390458-I1 as its same zoning lot with same scope of work, applicant and owner) PROPOSED NEW 11 STORY AND CELLAR 82 UNIT MIXED USE BUILDING
B01390326-I1
04/21/2026
Special inspection requirement — Air barrier - visual inspection
04/21/2026
Special inspection requirement — Fenestration areas
04/21/2026
Special inspection requirement — Insulation placement and R values
04/21/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
04/21/2026
Special inspection requirement — Fenestration air leakage
Nothing on file for this building.
1 project · most recent 08/25/2026
FiledStatusContractorScope
08/25/2026——2 scope_items
1 project · most recent 08/25/2026
Fence
FiledStatusContractorScope
08/25/2026——Fence
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
08/18/2026Standpipe Systems—special
08/18/2026Sprinkler Systems—special
08/18/2026Fire-Resistant Penetrations and Joints—special
08/18/2026Post-installed Anchors—special
08/12/2026Concrete - Cast-In-Place—special
08/06/2026Post-installed Anchors—special
08/06/2026Fire-Resistant Penetrations and Joints—special
08/05/2026Standpipe Systems—special
07/28/2026Final—progress
04/21/2026Air barrier - visual inspection—energy_progress
04/21/2026Fenestration areas—energy_progress
04/21/2026Insulation placement and R values—energy_progress
04/21/2026Fenestration and door U-factor and product ratings—energy_progress
04/21/2026Fenestration air leakage—energy_progress
▾Documents — 15 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/17/2026B01390326-S4Request digital key ↗
08/17/2026B01390326-S3Request digital key ↗
08/17/2026B01390326-S2Request digital key ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram1
08/15/2026B01390326-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/15/2026B01390326-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/15/2026B01390326-I1Open ↗
▸Seals & Professional Certifications3
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/17/2026B01390326-S4Open ↗
08/17/2026B01390326-S1Open ↗
08/17/2026B01390326-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/15/2026B01390326-I1Open ↗
▸Other Documents3
▸DOB NOWProperty Ownership Certification1
08/15/2026B01390326-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/15/2026B01390326-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/15/2026B01390326-I1Open ↗