| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 06/10/2026 | Permit Issued | PREFERRED GC GROUP INC | Heating and Air Conditioning Systems, Ventilation Systems | Heat / Cool Daikin FBA24AAVJU 742 CFM · Vrf Indoor ×23 RZA24AAVJU 27,000 BTU · Heat Pump Outdoor ×21 RZA18AAVJU 20,000 BTU · Heat Pump Outdoor ×17 FBA30AAVJU 1,094 CFM · Vrf Indoor ×16 RZA30AAVJU 34,000 BTU · Heat Pump Outdoor ×11 FBA18AAVJU 635 CFM · Vrf Indoor ×8 RXTA24AAVJU 25,000 BTU · Vrf Outdoor ×4 FXFA09AAVJU 441 CFM · Vrf Indoor ×3 RXTA36AAVJU 37,000 BTU · Vrf Outdoor ×3 FBA36AAVJU 1,130 CFM · Vrf Indoor ×2 FXMA18AAVJUA 635 CFM · Vrf Indoor ×2 FXMA24AAVJUA 742 CFM · Vrf Indoor ×2 Ventilation Greenheck ERV-10-20H-VG 660 CFM · Erv ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/10/2026 | — | — | Sprinkler System |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/10/2026 | — | — | Storm, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 12/08/2025 | Permit Issued | HIVOLTS ELECTRICAL INC | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/10/2026 | Permit Issued | PREFERRED GC GROUP INC | Concrete, Masonry |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/10/2026 | Permit Issued | PREFERRED GC GROUP INC | Fence |
| Owner | Filings | Most Recent |
|---|---|---|
| BT GENERAL BUILDERS | 6 | 09/22/2026 |
| SLATER ASSOCIATES | 2 | 03/21/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| VASILIOS ARTEMIOU PE | 4 | 06/10/2026 |
| NY BUILDING ASSOCIATES INC | 2 | 06/09/2026 |
| ELEVATED ENGINEERING NYC | 3 | 05/22/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| PREFERRED GC GROUP INC | General Contractor | 1 | 09/15/2026 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Construction Fence | Permit Issued | PREFERRED GC GROUP INC | 09/14/2026 |
| BIS | EQ | ISSUED | SLATER ASSOCIATES INC | 07/06/2016 |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 05/21/2026 | Sprinkler Systems | — | special |
| 05/21/2026 | Post-installed Anchors | — | special |
| 05/21/2026 | Fire-Resistant Penetrations and Joints | — | special |
| 05/21/2026 | Standpipe Systems | — | special |
| 05/14/2026 | Construction Operations Influencing Adjacent Structures | — | special |
| 05/14/2026 | Structural Steel - Details | — | special |
| 05/14/2026 | Post-installed Anchors | — | special |
| 05/14/2026 | Excavations - Sheeting, Shoring, and Bracing | — | special |
| 05/14/2026 | Subsurface Investigations (Borings/Test Pits) | — | special |
| 05/14/2026 | Subsurface Conditions – Fill Placement & In-Place Density | — | special |
| 05/14/2026 | Subgrade Inspections | — | special |
| 05/14/2026 | Structural Steel - Welding | — | special |
| 05/12/2026 | Subgrade Inspections | — | special |
| 05/12/2026 | Concrete - Cast-In-Place | — | special |
| 05/12/2026 | Subsurface Investigations (Borings/Test Pits) | — | special |
| 05/11/2026 | HVAC-R and service water heating system controls | — | energy_progress |
| 05/11/2026 | Fire-Resistant Penetrations and Joints | — | special |
| 05/11/2026 | Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation | — | special |
| 05/11/2026 | Maintenance information | — | energy_progress |
| 05/11/2026 | HVAC-R and service water heating equipment | — | energy_progress |
| 05/11/2026 | HVAC-R and service water piping design and insulation | — | energy_progress |
| 05/06/2026 | Footing and Foundation | — | progress |
| 05/06/2026 | Final | — | progress |
| 03/16/2026 | Concrete - Cast-In-Place | — | special |
| 03/16/2026 | Wall Panels, Curtain Walls, and Veneers | — | special |