← Back
Parsonage, rectory
4801 7 AVENUE
BROOKLYN · BIN 3332093
💬 Discuss this project
1920Year Built
3Stories
M3Building Class
R6BZoning
80,545 sfGross Floor Area
3Units
LL97 Covered3 Open Violations 0 unresolved · 3 paperwork only ▸FDNY Report ↗
Parsonage, rectory · Owner of record: ST AGATHAS CHURCH · 26,625 sf lot · 3.03 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ROCKLYN ASSET1307/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GREGORY V. PEROTTO, P.E.410/02/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PEROTTO GROUP803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KING'S PLAZA PLBG & HTG IPlumbing207/08/2026
GUARANTEED HOME IMPROVEMEGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GREGORY V. PEROTTO, P.E.947410/02/2024
Building Lifecycle
All (30)Filed (4)Permit Issued (3)Signed Off (3)Violation (2)Inspection (5)Special Inspection (13)
11/01/2024
Signed off — Alteration
OIL TO GAS CONVERSION. REPLACE BOILER AND BURNER WITH NEW GAS BOILER. CHANGE FUEL FROM #2 OIL TO GAS. SEPARATE PL APPLICATION FILED FOR GAS PLUMBING WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01103726-I1
11/01/2024
Signed off — Alteration
INSTALL NEW GAS LINE AND METER. INSTALL NEW HOT WATER HEATER. CONNECT GAS LINE TO GAS BOILER & HWH. REPLACEMENT BOILER FILED UNDER SEPARATE BE APPLICATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01103818-I1
10/28/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/21/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/17/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/09/2024
Special inspection requirement — Maintenance information
Gregory Perotto
10/09/2024
Special inspection requirement — HVAC-R and service water heating system controls
Gregory Perotto
10/09/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Gregory Perotto
10/09/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Gregory Perotto
10/09/2024
Special inspection requirement — HVAC-R and service water heating equipment
Gregory Perotto
10/07/2024
Signed off — Alteration
B01103835-I1
10/02/2024
Filed — Alteration
INSTALL NEW GAS LINE AND METER. INSTALL NEW HOT WATER HEATER. CONNECT GAS LINE TO GAS BOILER & HWH. REPLACEMENT BOILER FILED UNDER SEPARATE BE APPLICATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01103818-P1
09/30/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/24/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
09/05/2024
Permit issued — Plumbing
B01103818-I1-PL
09/04/2024
Permit issued — General Construction
B01103835-I1-GC
08/30/2024
Permit issued — Boiler Equipment
B01103726-I1-BE
08/29/2024
Filed — Alteration
OIL TO GAS CONVERSION. REPLACE BOILER AND BURNER WITH NEW GAS BOILER. CHANGE FUEL FROM #2 OIL TO GAS. SEPARATE PL APPLICATION FILED FOR GAS PLUMBING WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01103726-I1
08/29/2024
Filed — Alteration
INSTALL NEW GAS LINE AND METER. INSTALL NEW HOT WATER HEATER. CONNECT GAS LINE TO GAS BOILER & HWH. REPLACEMENT BOILER FILED UNDER SEPARATE BE APPLICATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01103818-I1
08/29/2024
Filed — Alteration
B01103835-I1
08/29/2024
Special inspection requirement — HVAC-R and service water heating equipment
Gregory Perotto
08/29/2024
Special inspection requirement — Chimneys and vents
Gregory Perotto
08/29/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Gregory Perotto
08/29/2024
Special inspection requirement — Final
Gregory Perotto
08/29/2024
Special inspection requirement — Heating Systems
Gregory Perotto
08/29/2024
Special inspection requirement — HVAC-R and service water heating system controls
Gregory Perotto
08/29/2024
Special inspection requirement — Maintenance information
Gregory Perotto
08/29/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Gregory Perotto
11/08/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/10/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offKING'S PLAZA PLBG & HTG I09/05/2024
DOB NOWGeneral ConstructionSigned-offGUARANTEED HOME IMPROVEME09/04/2024
DOB NOWBoiler EquipmentSigned-offKING'S PLAZA PLBG & HTG I08/30/2024
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
10/28/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/21/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/17/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/30/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/24/2024Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
10/09/2024Maintenance informationGregory Perottoenergy_progress
10/09/2024HVAC-R and service water heating system controlsGregory Perottoenergy_progress
10/09/2024HVAC-R and service water piping design and insulationGregory Perottoenergy_progress
10/09/2024Fire-Resistant Penetrations and JointsGregory Perottospecial
10/09/2024HVAC-R and service water heating equipmentGregory Perottoenergy_progress
08/29/2024HVAC-R and service water heating equipmentGregory Perottoenergy_progress
08/29/2024Chimneys and ventsGregory Perottospecial
08/29/2024Fire-Resistant Penetrations and JointsGregory Perottospecial
08/29/2024FinalGregory Perottoprogress
08/29/2024Heating SystemsGregory Perottospecial
08/29/2024HVAC-R and service water heating system controlsGregory Perottoenergy_progress
08/29/2024Maintenance informationGregory Perottoenergy_progress
08/29/2024HVAC-R and service water piping design and insulationGregory Perottoenergy_progress
▾Documents — 29 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/24/2026B01103726-I1Request digital key ↗
08/24/2026B01103835-I1Request digital key ↗
08/24/2026B01103818-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications17
▸DOB NOWProgress Inspector Seal & Signature9
09/23/2026B01103726-I1Open ↗
09/23/2026B01103726-I1Open ↗
09/23/2026B01103726-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/24/2026B01103726-I1Open ↗
08/24/2026B01103835-I1Open ↗
08/24/2026B01103818-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/23/2026B01103726-I1Open ↗
09/23/2026B01103726-I1Open ↗
09/01/2026B01103835-I1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/24/2026B01103726-I1Open ↗
08/24/2026B01103835-I1Open ↗
08/24/2026B01103818-P1Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs4
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter4
08/13/2026B01103818-I1Open ↗
08/13/2026B01103818-P1Open ↗
08/13/2026B01103726-I1Open ↗
Showing 3 of 4 on file for this type