← Back
One family attached or semi-detached
255 BRISTOL STREET
BROOKLYN · BIN 3332354
💬 Discuss this project
1986Year Built
2Stories
A5Building Class
R6Zoning
1,130 sfGross Floor Area
1Units
One family attached or semi-detached · 16,500 sf lot · 0.07 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Roof6p · 2 filings · 20 docs
Bulkhead5p · 1 filing · 19 docs
Floor 55p · 1 filing · 19 docs
Floor 41p · 1 filing · 19 docs
Floor 34p · 1 filing · 19 docs
Floor 22p · 2 filings · 20 docs
Floor 11p · 1 filing · 4 docs
Cellar8p · 2 filings · 20 docs
Basement4p · 1 filing · 9 docs
1 job · most recent 11/12/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
11/12/2025——Heating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric MXZ-SM36NAM2 3 tons · Condensing Unit ×8
PUZ-A18NKA7 15 tons · Condensing Unit ×5
MXZ-SM48NAM2 4 tons · Condensing Unit ×4
1 job · most recent 11/12/2025
Storm Water/Sanitary
FiledStatusContractorScope
11/12/2025——Storm, Water/Sanitary
1 job · most recent 08/31/2022
FiledStatusContractorScope
08/31/2022CompleteISLAND ELECTRIC CORP—
1 job · most recent 11/12/2025
Steel Concrete
FiledStatusContractorScope
11/12/2025——Steel, Concrete
1 job · most recent 07/14/2026
Fence
FiledStatusContractorScope
07/14/2026——Fence
Building Lifecycle
All (69)Filed (6)Objection (38)Special Inspection (25)
07/30/2026
Objection resolved — Resolved
07/14/2026
Filed — Alteration
Install Temporary Wood Construction fence. No Change to egress, occupancy or use.
B01391527-I1
06/19/2026
Objection resolved — Resolved
06/09/2026
Objection resolved — Addressed
06/09/2026
Objection resolved — Addressed
06/04/2026
Objection raised — Other
05/20/2026
Filed — Full Demolition
Full demolition of Two Story Building.
B01391520-I1
03/25/2026
Objection resolved — Addressed
02/24/2026
Objection resolved — Addressed
02/16/2026
Objection resolved — Addressed
02/16/2026
Objection resolved — Addressed
02/16/2026
Objection resolved — Addressed
02/16/2026
Objection resolved — Addressed
02/16/2026
Objection resolved — Addressed
02/16/2026
Objection resolved — Addressed
01/07/2026
Objection resolved — Addressed
01/07/2026
Special inspection requirement — Metering
01/06/2026
Objection raised — Other
12/16/2025
Objection resolved — Addressed
11/28/2025
Objection raised — Other
11/12/2025
Filed — New Building
SUBSEQUENT FILING FOR SOE IN CONJUNCTION WITH NB
B01294089-S1
11/08/2025
Objection raised — Other
11/07/2025
Objection raised — Other
11/03/2025
Objection resolved — Addressed
11/03/2025
Objection resolved — Addressed
11/03/2025
Objection resolved — Addressed
11/03/2025
Objection resolved — Addressed
10/24/2025
Objection raised — Other
10/24/2025
Objection raised — Other
10/24/2025
Objection raised — Other
10/24/2025
Objection raised — Other
10/24/2025
Objection raised — Other
10/24/2025
Objection raised — Other
10/24/2025
Objection raised — Other
10/24/2025
Objection raised — Other
10/24/2025
Objection raised — Other
10/24/2025
Objection raised — Other
10/24/2025
Objection raised — Other
10/24/2025
Objection raised — Other
10/24/2025
Objection raised — Other
10/24/2025
Objection raised — Other
10/24/2025
Objection raised — Other
10/23/2025
Filed — New Building
SUBSEQUENT FILING FOR SOE IN CONJUNCTION WITH NB
B01294089-S2
10/23/2025
Filed — New Building
SUBSEQUENT FILING FOR SOE IN CONJUNCTION WITH NB
B01294089-S3
10/22/2025
Special inspection requirement — Air barrier - visual inspection
10/22/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
10/22/2025
Special inspection requirement — Insulation placement and R values
10/22/2025
Special inspection requirement — Fenestration air leakage
10/22/2025
Special inspection requirement — Fenestration areas
10/21/2025
Special inspection requirement — Masonry
10/21/2025
Special inspection requirement — Structural Steel - Details
10/21/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
10/21/2025
Special inspection requirement — Concrete - Cast-In-Place
10/10/2025
Filed — New Building
SUBSEQUENT FILING FOR SOE IN CONJUNCTION WITH NB
B01294089-I1
10/10/2025
Special inspection requirement — Lighting controls
10/10/2025
Special inspection requirement — Mastic and Intumescent Fire-resistant Coatings
10/10/2025
Special inspection requirement — Energy Code Compliance Inspections
10/10/2025
Special inspection requirement — Fire-Resistance Rated Construction
10/10/2025
Special inspection requirement — Exterior lighting power
10/10/2025
Special inspection requirement — Interior lighting power
Latest 60 of 69 events.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
YAKER ENGINEERING, P.C.207/14/2026
BASIC GROUPS CORP311/12/2025
BLUARCH LLC110/10/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AM PROFESSIONALS403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ISLAND ELECTRIC CORPElectrical103/22/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BISOTISSUEDPRO CUSTOM SOLAR LLC08/18/2022
▾Special Inspection Requirements (DOB NOW) — 25
DateRequirementInspectorRole
01/07/2026Metering—energy_progress
10/22/2025Air barrier - visual inspection—energy_progress
10/22/2025Fenestration and door U-factor and product ratings—energy_progress
10/22/2025Insulation placement and R values—energy_progress
10/22/2025Fenestration air leakage—energy_progress
10/22/2025Fenestration areas—energy_progress
10/21/2025Masonry—special
10/21/2025Structural Steel - Details—special
10/21/2025Excavations - Sheeting, Shoring, and Bracing—special
10/21/2025Concrete - Cast-In-Place—special
10/10/2025Lighting controls—energy_progress
10/10/2025Mastic and Intumescent Fire-resistant Coatings—special
10/10/2025Energy Code Compliance Inspections—progress
10/10/2025Fire-Resistance Rated Construction—progress
10/10/2025Exterior lighting power—energy_progress
10/10/2025Interior lighting power—energy_progress
10/10/2025Fire-Resistant Penetrations and Joints—special
10/10/2025Maintenance information—energy_progress
09/30/2025Fenestration and door U-factor and product ratings—energy_progress
09/30/2025Fenestration air leakage—energy_progress
09/30/2025Fenestration areas—energy_progress
09/30/2025Air barrier - visual inspection—energy_progress
09/30/2025Insulation placement and R values—energy_progress
09/28/2025Footing and Foundation—progress
09/28/2025Final—progress
▾Documents — 54 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/20/2026B01294089-S4Request digital key ↗
08/16/2026B01391527-I1Request digital key ↗
08/15/2026B01391520-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION2
12/04/2025340921435Open ↗
08/16/2022340864345Open ↗
▸BISWORK PERMIT APPLICATION1
08/18/2022340864345Open ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/15/2026B01294089-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026B01294089-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026B01294089-I1Open ↗
▸Seals & Professional Certifications12
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/20/2026B01294089-S4Open ↗
08/20/2026B01294089-S2Open ↗
08/20/2026B01294089-S1Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
12/04/2025340921435Open ↗
08/16/2022340864345Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
08/16/2022340864345Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
12/04/2025340921435Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
08/16/2022340864345Open ↗
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/15/2026B01294089-I1Open ↗
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist2
08/15/2026B01294089-S1Open ↗
08/15/2026B01294089-I1Open ↗
▸BISTPP1: TENANT PROTECTION PLAN1
08/18/2022340864345Open ↗
▸Environmental & Asbestos1
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
08/16/2022340864345Open ↗
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
03/01/2024340864345Open ↗
08/16/2022340864345Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
03/01/2024340864345Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
08/16/2022340864345Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (FINAL)1
03/01/2024340864345Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
08/16/2022340864345Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
12/04/2025340921435Open ↗
03/01/2024340864345Open ↗
08/16/2022340864345Open ↗
▸Approvals, Objections & Sign-offs3
▸BISLETTERS - SUPPORTING DOCUMENTATION2
12/04/2025340921435Open ↗
03/06/2024340864345Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
03/06/2024340864345Open ↗
▸Cost, Insurance & Ownership3
▸BISBPP-11 - Affidavit as to Roadway Pavement And/Or Sidewalk and Curb Construction1
12/04/2025340921435Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
03/01/2024340864345Open ↗
▸BISCOST AFFIDAVIT1
08/16/2022340864345Open ↗
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET2
12/04/2025340921435Open ↗
08/16/2022340864345Open ↗
▸Other Documents7
▸DOB NOWProperty Ownership Certification2
08/15/2026B01391520-I1Open ↗
08/15/2026B01294089-I1Open ↗
▸DOB NOWSite Survey: Initial2
08/13/2026B01294089-I1Open ↗
08/13/2026B01294089-S1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026B01294089-S1Open ↗
08/13/2026B01294089-I1Open ↗
▸DOB NOWStructure Photographs1
08/15/2026B01391520-I1Open ↗