← Back
Primarily 2 family with 1 store or office
141 NEVINS STREET
BROOKLYN · BIN 3332449
💬 Discuss this project
1920Year Built
3Stories
S2Building Class
R6AZoning
2,480 sfGross Floor Area
3Units
Rent Stabilized10 Open Violations ▸FDNY Report ↗
Primarily 2 family with 1 store or office · Owner of record: 141 NEVINS STREET LLC · 1,200 sf lot · 2.07 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Roof2p · 2 filings · 13 docs
Floor 34p · 2 filings · 20 docs
Floor 2
Floor 11p · 1 filing · 10 docs
Cellar14p · 2 filings · 20 docs
1 job · most recent 03/18/2024
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
03/18/2024——Ventilation Systems
Ventilation
Captiveaire NCA16FA 3,180 CFM · Exhaust Fan ×1
1 job · most recent 10/02/2024
Gas Water/Sanitary
FiledStatusContractorScope
10/02/2024Signed-offINFINITI ESC PLUMBING CORGas, Water/Sanitary
1 job · most recent 09/14/2023
General Wiring
FiledStatusContractorScope
09/14/2023CompleteAMOR ELECTRIC CORPGeneral Wiring
Building Lifecycle
All (54)Filed (8)Permit Issued (3)Signed Off (1)Violation (14)Inspection (5)Special Inspection (23)
04/09/2025
Signed off — Alteration
INTERIOR REMODEL OF EXISTING COMMERCIAL AND RESIDENTIAL SPACE. new finishes, new lighting and mechanical.
B00924770-I1
02/06/2025
Filed — Alteration
INTERIOR REMODEL OF EXISTING COMMERCIAL AND RESIDENTIAL SPACE. new finishes, new lighting and mechanical.
B00924770-P1
02/06/2025
Special inspection requirement — HVAC-R and service water heating equipment
stefano morisi
02/06/2025
Special inspection requirement — Fenestration areas
stefano morisi
02/06/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
stefano morisi
02/06/2025
Special inspection requirement — Mechanical Systems
stefano morisi
02/06/2025
Special inspection requirement — Final
stefano morisi
02/06/2025
Special inspection requirement — HVAC-R and service water heating system controls
stefano morisi
02/06/2025
Special inspection requirement — Fenestration air leakage
stefano morisi
02/06/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
stefano morisi
02/06/2025
Special inspection requirement — Lighting controls
stefano morisi
02/06/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
stefano morisi
02/06/2025
Special inspection requirement — Lighting in dwelling units
stefano morisi
02/06/2025
Special inspection requirement — Metering
stefano morisi
02/06/2025
Special inspection requirement — Interior lighting power
stefano morisi
10/10/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/03/2024
Special inspection requirement — HVAC-R and service water heating equipment
stefano morisi
10/03/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
stefano morisi
10/02/2024
Filed — Alteration
NEW PLUMBING FIXTURES TO REPLACE EXISTING FIXTURES, NEW PLUMBING FIXTURES, AND MODIFICATIONS TO EXISTING PLUMBING SYSTEM. New gas piping on existing meters, 3 new gas water heaters and 1 new gas commercial kitchen fixture
B00938149-P3
03/18/2024
Filed — Alteration
INSTALL A NEW COMMERCIAL KITCHEN EXHAUST HOOD, DUCTWORK AT KITCHEN AND EXHAUST FAN ON THE ROOF, THERE IS NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B00979821-I1
03/18/2024
Special inspection requirement — Tenant Protection Plan Compliance
01/04/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/19/2023
Special inspection requirement — Final
12/19/2023
Special inspection requirement — Mechanical Systems
Jay Kavi
12/19/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jay Kavi
12/14/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
12/01/2023
Filed — Alteration
NEW PLUMBING FIXTURES TO REPLACE EXISTING FIXTURES, NEW PLUMBING FIXTURES, AND MODIFICATIONS TO EXISTING PLUMBING SYSTEM. New gas piping on existing meters, 3 new gas water heaters and 1 new gas commercial kitchen fixture
B00938149-P2
12/01/2023
Special inspection requirement — HVAC-R and service water heating equipment
stefano morisi
12/01/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
stefano morisi
11/22/2023
Filed — Alteration
NEW PLUMBING FIXTURES TO REPLACE EXISTING FIXTURES, NEW PLUMBING FIXTURES, AND MODIFICATIONS TO EXISTING PLUMBING SYSTEM. New gas piping on existing meters, 3 new gas water heaters and 1 new gas commercial kitchen fixture
B00938149-P1
11/22/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
stefano morisi
11/22/2023
Special inspection requirement — HVAC-R and service water heating equipment
stefano morisi
11/16/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/16/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
11/09/2023
Permit issued — Plumbing
B00938149-I1-PL
10/17/2023
Filed — Alteration
NEW PLUMBING FIXTURES TO REPLACE EXISTING FIXTURES, NEW PLUMBING FIXTURES, AND MODIFICATIONS TO EXISTING PLUMBING SYSTEM. New gas piping on existing meters, 3 new gas water heaters and 1 new gas commercial kitchen fixture
B00938149-I1
09/11/2023
Permit issued — Mechanical Systems
B00924770-I1-GC-CX
09/06/2023
Filed — Alteration
INTERIOR REMODEL OF EXISTING COMMERCIAL AND RESIDENTIAL SPACE. new finishes, new lighting and mechanical.
B00924770-I1
07/20/2023
Violation issued (ECB, closed)
Plumbing
07/20/2023
Violation issued (ECB, closed)
Construction
07/20/2023
Violation issued (ECB, closed)
Construction
04/02/2022
Violation issued (HPD, open)
B
04/02/2022
Violation issued (HPD, open)
B
04/02/2022
Violation issued (HPD, open)
B
04/02/2022
Violation issued (HPD, open)
B
04/02/2022
Violation issued (HPD, open)
B
09/25/2020
Violation issued (ECB, closed)
Construction
10/21/2019
Filed — Alteration
B00247746-I1
10/21/2019
Permit issued — Sidewalk Shed
B00247746-I1-SH
06/09/2004
Violation issued (HPD, open)
B
06/09/2004
Violation issued (HPD, open)
C
06/09/2004
Violation issued (HPD, open)
B
06/09/2004
Violation issued (HPD, open)
A
06/09/2004
Violation issued (HPD, open)
A
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BILLY ENTERPRISES407/08/2026
141 NEVINS STREET LLC303/22/2026
ALL TAIB PROPERTIES LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/31/2022$1.6M—— → —$665/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
STEFANO MORISI R.A.602/06/2025
ASHRAF CORP103/18/2024
HAIDER ENGINEERING, P.E.110/21/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SNR EXPEDITING DESIGN203/21/2026
AN TONG FAN203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
INFINITI ESC PLUMBING CORPlumbing707/08/2026
INFINITI ESC PLUMBING CORGeneral Contractor203/22/2026
AN AMERICAN COMPANY, INCGeneral Contractor107/08/2026
BILLY ENTERPRISES INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DYO DESIGN OFFICE LLC6701702/06/2025
JAY KAVI CORPORATION8500103/18/2024
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offINFINITI ESC PLUMBING COR11/09/2023
DOB NOWMechanical SystemsSigned-offAN AMERICAN COMPANY, INC09/11/2023
DOB NOWSidewalk ShedPermit IssuedBILLY ENTERPRISES INC10/21/2019
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
10/10/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/04/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/14/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/16/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/16/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 23
DateRequirementInspectorRole
02/06/2025HVAC-R and service water heating equipmentstefano morisienergy_progress
02/06/2025Fenestration areasstefano morisienergy_progress
02/06/2025Fire-Resistant Penetrations and Jointsstefano morisispecial
02/06/2025Mechanical Systemsstefano morisispecial
02/06/2025Finalstefano morisiprogress
02/06/2025HVAC-R and service water heating system controlsstefano morisienergy_progress
02/06/2025Fenestration air leakagestefano morisienergy_progress
02/06/2025HVAC-R and service water piping design and insulationstefano morisienergy_progress
02/06/2025Lighting controlsstefano morisienergy_progress
02/06/2025Fenestration and door U-factor and product ratingsstefano morisienergy_progress
02/06/2025Lighting in dwelling unitsstefano morisienergy_progress
02/06/2025Meteringstefano morisienergy_progress
02/06/2025Interior lighting powerstefano morisienergy_progress
10/03/2024HVAC-R and service water heating equipmentstefano morisienergy_progress
10/03/2024Fire-Resistant Penetrations and Jointsstefano morisispecial
03/18/2024Tenant Protection Plan Compliance—special
12/19/2023Final—progress
12/19/2023Mechanical SystemsJay Kavispecial
12/19/2023Fire-Resistant Penetrations and JointsJay Kavispecial
12/01/2023HVAC-R and service water heating equipmentstefano morisienergy_progress
12/01/2023Fire-Resistant Penetrations and Jointsstefano morisispecial
11/22/2023Fire-Resistant Penetrations and Jointsstefano morisispecial
11/22/2023HVAC-R and service water heating equipmentstefano morisienergy_progress
▾Documents — 34 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch7
08/26/2026B00924770-I1Request digital key ↗
08/26/2026B00924770-P1Request digital key ↗
08/26/2026B00938149-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/02/2026B00247746-I1Request digital key ↗
▸Seals & Professional Certifications18
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/26/2026B00938149-I1Open ↗
08/26/2026B00938149-P3Open ↗
08/26/2026B00938149-P2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
08/24/2026B00938149-P1Open ↗
08/23/2026B00924770-P1Open ↗
08/23/2026B00924770-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/24/2026B00938149-P1Open ↗
08/23/2026B00924770-P1Open ↗
08/23/2026B00924770-P1Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection1
▸DOB NOWTenant Protection Plan1
08/13/2026B00247746-I1Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/26/2026B00938149-I1Open ↗
08/26/2026B00938149-P3Open ↗
08/26/2026B00938149-P2Open ↗
Showing 3 of 7 on file for this type