← Back
Single or multiple dwelling with stores or offices
2 2 STREET
BROOKLYN · BIN 3336314
💬 Discuss this project
1920Year Built
3Stories
S9Building Class
R6BZoning
4,630 sfGross Floor Area
4Units
Rent Stabilized6 Open Violations ▸FDNY Report ↗
Single or multiple dwelling with stores or offices · 2,088 sf lot · 2.22 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Roof6p · 1 filing · 20 docs
Floor 19p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
365 SMITH SANDWICH1807/08/2026
J & M DONUT CORP203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AYALA ENGINEERING PC702/06/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUN503/21/2026
YBL NY403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
URBAN CONSTR & DESIGN LLCGeneral Contractor303/21/2026
WILLDAN ELECTRICAL OF NYElectrical203/22/2026
CROSSFIELD PLBG.&HTGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A&B WORLD CONSULTING, INC5704502/06/2025
AYALA ENGINEERING P.C.9207502/06/2025
Building Lifecycle
All (51)Filed (5)Permit Issued (2)Violation (26)Inspection (3)Objection (2)Special Inspection (13)
11/20/2025
Violation issued (HPD, closed)
I
06/05/2025
Violation issued (HPD, closed)
A
03/20/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/24/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
02/24/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/18/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Pablo Ayala
02/18/2025
Special inspection requirement — Tenant Protection Plan Compliance
Alexander Bomstein
02/06/2025
Filed — Alteration
JOB FILED INTERIOR RENOVATION OF EXIST. STORE INCLUDING NEW COUNTER AND COOKING EQUIPMENT, NEW FLOOR TILE AND NEW PAINT, REPLACE KITCHEN HOOD AND FIRE SUPPRESSION SYSTEM AS PER PLAN. NO CHANGE OF USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B01121930-P3
01/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Pablo Ayala
01/22/2025
Special inspection requirement — Tenant Protection Plan Compliance
Alexander Bomstein
01/22/2025
Special inspection requirement — Final
Pablo Ayala
01/22/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Pablo Ayala
01/22/2025
Special inspection requirement — Interior lighting power
Pablo Ayala
01/22/2025
Special inspection requirement — Energy Code Compliance Inspections
Pablo Ayala
01/22/2025
Special inspection requirement — Mechanical Systems
Pablo Ayala
01/16/2025
Filed — Alteration
JOB FILED INTERIOR RENOVATION OF EXIST. STORE INCLUDING NEW COUNTER AND COOKING EQUIPMENT, NEW FLOOR TILE AND NEW PAINT, REPLACE KITCHEN HOOD AND FIRE SUPPRESSION SYSTEM AS PER PLAN. NO CHANGE OF USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B01121930-P1
01/16/2025
Filed — Alteration
JOB FILED INTERIOR RENOVATION OF EXIST. STORE INCLUDING NEW COUNTER AND COOKING EQUIPMENT, NEW FLOOR TILE AND NEW PAINT, REPLACE KITCHEN HOOD AND FIRE SUPPRESSION SYSTEM AS PER PLAN. NO CHANGE OF USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B01121930-P2
12/30/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Pablo Ayala
12/30/2024
Special inspection requirement — Tenant Protection Plan Compliance
Alexander Bomstein
11/29/2024
Violation issued (HPD, closed)
I
11/18/2024
Permit issued — Plumbing
B01121930-S1-PL
11/04/2024
Permit issued — General Construction
B01121930-I1-GC-CX
10/24/2024
Objection resolved — Addressed
10/22/2024
Objection raised — Other
10/09/2024
Filed — Alteration
JOB FILED INTERIOR RENOVATION OF EXIST. STORE INCLUDING NEW COUNTER AND COOKING EQUIPMENT, NEW FLOOR TILE AND NEW PAINT, REPLACE KITCHEN HOOD AND FIRE SUPPRESSION SYSTEM AS PER PLAN. NO CHANGE OF USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B01121930-I1
10/09/2024
Filed — Alteration
JOB FILED INTERIOR RENOVATION OF EXIST. STORE INCLUDING NEW COUNTER AND COOKING EQUIPMENT, NEW FLOOR TILE AND NEW PAINT, REPLACE KITCHEN HOOD AND FIRE SUPPRESSION SYSTEM AS PER PLAN. NO CHANGE OF USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B01121930-S1
09/24/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
09/24/2024
Special inspection requirement — Tenant Protection Plan Compliance
04/03/2024
Violation issued (HPD, closed)
A
11/22/2023
Violation issued (HPD, closed)
I
03/17/2023
Violation issued (HPD, closed)
A
11/14/2022
Violation issued (HPD, closed)
I
03/21/2022
Violation issued (FDNY_ORDER, closed)
03/21/2022
Violation issued (FDNY_ORDER, closed)
03/21/2022
Violation issued (FDNY_ORDER, closed)
02/18/2022
Violation issued (HPD, closed)
A
04/05/2021
Violation issued (HPD, closed)
A
10/28/2019
Violation issued (HPD, closed)
I
10/12/2018
Violation issued (HPD, closed)
I
11/15/2017
Violation issued (HPD, closed)
I
11/01/2016
Violation issued (HPD, closed)
I
10/06/2015
Violation issued (HPD, closed)
I
02/05/2015
Violation issued (HPD, closed)
I
02/10/1997
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/29/1995
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/25/1994
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/01/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/16/1993
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/01/1993
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/13/1985
Violation issued (HPD, open)
C
06/28/1985
Violation issued (HPD, open)
A
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedCROSSFIELD PLBG.&HTG11/18/2024
DOB NOWGeneral ConstructionPermit IssuedURBAN CONSTR & DESIGN LLC11/04/2024
BISMHISSUEDTRITOWER MASON SPECIALTY CORP.08/09/2007
BISFPISSUEDMASTER FIRE SYSTEMS, INC04/12/2006
BISOTISSUEDEMANUEL BROS CONST CORP07/10/1998
BISFPISSUEDMASTER FIRE PREVENT SYS, INC.02/26/1997
BISOTISSUEDJUAN MAGANA DBA JM CONSTRUCTION04/14/1993
BISFPISSUEDPROTECTION SYSTEM SPEC. INC04/14/1993
1 project · most recent 02/06/2025
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
02/06/2025Permit IssuedURBAN CONSTR & DESIGN LLCVentilation Systems
Ventilation
Dayton 56JN93 3,000 CFM · Exhaust Fan ×2
2 projects · most recent 02/06/2025
Gas Water/Sanitary
FiledStatusContractorScope
02/06/2025Permit IssuedCROSSFIELD PLBG.&HTGGas, Water/Sanitary
———Gas, Water/Sanitary
1 project · most recent 09/16/2019
General Wiring
FiledStatusContractorScope
09/16/2019CompleteWILLDAN ELECTRICAL OF NYGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
03/20/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/24/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/24/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
02/18/2025Fire-Resistant Penetrations and JointsPablo Ayalaspecial
02/18/2025Tenant Protection Plan ComplianceAlexander Bomsteinspecial
01/22/2025Fire-Resistant Penetrations and JointsPablo Ayalaspecial
01/22/2025Tenant Protection Plan ComplianceAlexander Bomsteinspecial
01/22/2025FinalPablo Ayalaprogress
01/22/2025HVAC-R and service water piping design and insulationPablo Ayalaenergy_progress
01/22/2025Interior lighting powerPablo Ayalaenergy_progress
01/22/2025Energy Code Compliance InspectionsPablo Ayalaprogress
01/22/2025Mechanical SystemsPablo Ayalaspecial
12/30/2024Fire-Resistant Penetrations and JointsPablo Ayalaspecial
12/30/2024Tenant Protection Plan ComplianceAlexander Bomsteinspecial
09/24/2024Fire-Resistant Penetrations and Joints—special
09/24/2024Tenant Protection Plan Compliance—special
▾Documents — 23 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/23/2026B01121930-P3Request digital key ↗
08/23/2026B01121930-S1Request digital key ↗
08/23/2026B01121930-P2Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications13
▸DOB NOWSpecial Inspector Seal & Signature6
09/20/2026B01121930-I1Open ↗
09/20/2026B01121930-I1Open ↗
09/01/2026B01121930-S1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/23/2026B01121930-I1Open ↗
08/23/2026B01121930-P3Open ↗
08/23/2026B01121930-P2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
09/20/2026B01121930-I1Open ↗
09/20/2026B01121930-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/23/2026B01121930-P3Open ↗
08/23/2026B01121930-P2Open ↗
08/23/2026B01121930-P1Open ↗
Showing 3 of 5 on file for this type