← Back
Primarily 3 family with 1 store or office
497 COURT STREET
BROOKLYN · BIN 3336360
💬 Discuss this project
1931Year Built
3Stories
S3Building Class
R6AZoning
7,050 sfGross Floor Area
4Units
13 Open Violations 11 unresolved · 2 paperwork only ▸FDNY Report ↗
Primarily 3 family with 1 store or office · 1,760 sf lot · 4.01 FAR built · Flood zone X500
Locations of Work
Architecture
Permit Issued — active, not yet Signed-off
RoofUnder Construction1p · 1 filing · 6 docs
1 job · most recent 04/28/2025
FiledStatusContractorScope
04/28/2025Permit IssuedRICHARD NEU—
1 job · most recent 04/21/2026
FiledStatusContractorScope
04/21/2026Permit IssuedPIONEER GENERAL CONSTRUCT1 scope_items
1 job · most recent 10/09/2023
Sidewalk Shed
FiledStatusContractorScope
10/09/2023Permit IssuedZKW ENTERPRISES INCSidewalk Shed
Building Lifecycle
All (29)Filed (3)Permit Issued (3)Violation (18)Objection (2)Special Inspection (3)
08/14/2026
Permit issued — Structural
B01389679-I1-GC-CX
04/21/2026
Filed — Alteration
FACADE REPAIRS AS PER PLAN. NO CHANGE TO USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B01389679-I1
04/20/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Thomas Cataldo
04/20/2026
Special inspection requirement — Tenant Protection Plan Compliance
Thomas Cataldo
04/20/2026
Special inspection requirement — Final
Thomas Cataldo
12/08/2025
Violation issued (ECB, open)
Construction
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/07/2025
Permit issued — Sidewalk Shed
B00944835-I1-SH
09/09/2025
Objection raised — Scope
09/09/2025
Objection raised — Cost
08/22/2025
Filed — Alteration
Repair of front facade. No change in use, occupancy nor egress.
B01210199-I1
05/01/2025
Violation issued (ECB, open)
Construction
10/31/2024
Violation issued (ECB, open)
Boilers
10/10/2024
Permit issued — Sidewalk Shed
B00944835-I1-SH
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/12/2024
Violation issued (ECB, closed)
Unknown
05/06/2024
Violation issued (ECB, closed)
Unknown
10/09/2023
Filed — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B00944835-I1
10/04/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/04/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/04/2023
Violation issued (ECB, open)
Construction
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/03/2015
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/25/1999
Violation issued (ECB, closed)
Construction
08/25/1999
Violation issued (DOB, closed)
VW*-VIOLATION - WORK W/O PERMIT DISMISSED
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NAPCO309/01/2026
ZKW ENTERPRISES607/08/2026
OWNER OF 497 COURT STREET103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CATALDO ENGINEERING, P.C.104/21/2026
BRIAN E. FLYNN, PE, PC108/22/2025
ASR ENGINEERING PC110/09/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ADVANCED BUILDERS SERVICES103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ZKW ENTERPRISES INCGeneral Contractor207/08/2026
RICHARD NEUElectrical103/22/2026
PIONEER GENERAL CONSTRUCTGeneral Contractor108/16/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CATALDO ENGINEERING, P.C.2174104/21/2026
BRIAN E. FLYNN, PE, PC2837108/22/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedPIONEER GENERAL CONSTRUCT08/14/2026
DOB NOWSidewalk ShedPermit IssuedZKW ENTERPRISES INC10/07/2025
DOB NOWSidewalk ShedPermit IssuedZKW ENTERPRISES INC10/10/2024
BISPLISSUEDEPN PLUMBING05/26/2000
BISOTISSUEDNORTH AMERICAN FINCANCIAL09/27/1999
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
04/20/2026Structural Stability – Alterations of existing buildingsThomas Cataldospecial
04/20/2026Tenant Protection Plan ComplianceThomas Cataldospecial
04/20/2026FinalThomas Cataldoprogress
▾Documents — 19 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/26/2026B00944835-I1Request digital key ↗
08/20/2026B01210199-I1Request digital key ↗
08/17/2026B01389679-I1Request digital key ↗
▸Applications & Permits5
▸BISPLAN / WORK APPROVAL APPLICATION5
05/22/2025300938644Open ↗
05/21/2025300938644Open ↗
02/12/2025300938644Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications6
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/20/2026B01210199-I1Open ↗
08/17/2026B01389679-I1Open ↗
08/13/2026B00944835-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/22/2026B01389679-I1Open ↗
08/22/2026B01389679-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/22/2026B01389679-I1Open ↗
▸Trade Schedules & Equipment3
▸BISSCHEDULE B - PLUMBING3
05/22/2025300938644Open ↗
05/21/2025300938644Open ↗
02/11/2025300938644Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/20/2026B01210199-I1Open ↗
08/17/2026B01389679-I1Open ↗