ECB12/08/2025FAILURE TO MAINTAIN BUILDING WALL(S) OR APPURTENANCES. OBSERVED LARGE BULGE ON MASONRY WALL & STRESS CRACKS AT 1ST FLOOR AT EXPOSURE #1 STILL PRESENT., MAINTAIN EXTERIOR BUILDING WALL.., REPAIR AND/REPLACE$2K due
DOB11/14/2025VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
ECB05/01/2025OBSERVED LARGE BULGE ON MASONRY WALL & STRESS CRACKS AT 1ST FLOOR AT EXPOSURE #1 STILL PRESENT., MAINTAIN EXTERIOR BUILDING WALL$8K due
DOB09/23/2024VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
DOB10/04/2023FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. AT TIME OF INSPECTION OBSERVED AT EXPOSURE 1,BETWEEN 1ST AND 2ND FLOORS LARGE BULGE IN FACADE MASONRY FINISH,ALSO OBSERVED SEVERAL STRESS CRACK AT FRONT OF BUILDING.
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
DOB04/25/2023VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
DOB03/03/2015VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT
ECB10/31/2024FAILURE TO FILE REQUIRED ANNUAL BOILER INSPECTION REPORTS FOR LOW-PRESSURE BOILER 300000820769N0001 IN ACCORDANCE WITH THE RULES OF THE DEPARTMENT.1RCNY 103-01(D)(1)REQUIRES THAT AN ANNUAL INSPECTION REPORT FORNothing owed — awaiting certificate of correction
ECB10/04/2023AT EXPOSURE 1, BETWEEN 1ST AND 2ND FLOORS, DECORATIVE MASONRY HAS LARGE BULGE ON WALL, ALSO OBSERVED SEVERAL STRESS CRACKS AT 1ST FLOOR., MAINTAIN EXTERIOR BUILDING WALLNothing owed — awaiting certificate of correction
Primarily 3 family with 1 store or office · 1,760 sf lot · 4.01 FAR built · Flood zone X500