Roof100p · 1 filing · 9 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Scope of Work consists of installation of four new gas fired unit heaters connected to two existing service with 1 existing gas meter, 1 new gas meter and new gas piping. No change in use, egress or occupancy. PW1b (Sch B): Fixtures: First Floor 1- Gas Meter, 1- Gas Piping, 4- Gas Furnaces; Risers: 2 Risers on First Floor; Gas Equipment: 2 Modine PDP300 Unit Heaters rated 300,000 BTUH and 2 Modine HD125 Unit Heaters rated 125,000 BTUH. Gas Usage: Heat
On file for this job
9 documents · 100 drawing sheets
Bulkhead13p · 1 filing · 9 docs
ArchitectureMechanicalPlumbingStructural
Scope of Work consists of installation of four new gas fired unit heaters connected to two existing service with 1 existing gas meter, 1 new gas meter and new gas piping. No change in use, egress or occupancy. PW1b (Sch B): Fixtures: First Floor 1- Gas Meter, 1- Gas Piping, 4- Gas Furnaces; Risers: 2 Risers on First Floor; Gas Equipment: 2 Modine PDP300 Unit Heaters rated 300,000 BTUH and 2 Modine HD125 Unit Heaters rated 125,000 BTUH. Gas Usage: Heat
On file for this job
9 documents · 13 drawing sheets
Penthouse3p · 1 filing · 9 docs
Fire ProtectionPlumbing
Scope of Work consists of installation of four new gas fired unit heaters connected to two existing service with 1 existing gas meter, 1 new gas meter and new gas piping. No change in use, egress or occupancy. PW1b (Sch B): Fixtures: First Floor 1- Gas Meter, 1- Gas Piping, 4- Gas Furnaces; Risers: 2 Risers on First Floor; Gas Equipment: 2 Modine PDP300 Unit Heaters rated 300,000 BTUH and 2 Modine HD125 Unit Heaters rated 125,000 BTUH. Gas Usage: Heat
On file for this job
9 documents · 3 drawing sheets
Floor 811p · 1 filing · 9 docs
Fire Protection
Scope of Work consists of installation of four new gas fired unit heaters connected to two existing service with 1 existing gas meter, 1 new gas meter and new gas piping. No change in use, egress or occupancy. PW1b (Sch B): Fixtures: First Floor 1- Gas Meter, 1- Gas Piping, 4- Gas Furnaces; Risers: 2 Risers on First Floor; Gas Equipment: 2 Modine PDP300 Unit Heaters rated 300,000 BTUH and 2 Modine HD125 Unit Heaters rated 125,000 BTUH. Gas Usage: Heat
On file for this job
9 documents · 1 drawing sheet
Floor 80
Floor 79
Floor 78
Floor 77
Floor 76
Floor 75
Floor 74
Floor 73
Floor 72
Floor 71
Floor 70
Floor 69
Floor 681p · 1 filing · 9 docs
Plumbing
Scope of Work consists of installation of four new gas fired unit heaters connected to two existing service with 1 existing gas meter, 1 new gas meter and new gas piping. No change in use, egress or occupancy. PW1b (Sch B): Fixtures: First Floor 1- Gas Meter, 1- Gas Piping, 4- Gas Furnaces; Risers: 2 Risers on First Floor; Gas Equipment: 2 Modine PDP300 Unit Heaters rated 300,000 BTUH and 2 Modine HD125 Unit Heaters rated 125,000 BTUH. Gas Usage: Heat
On file for this job
9 documents · 1 drawing sheet
Floor 671p · 1 filing · 9 docs
Plumbing
Scope of Work consists of installation of four new gas fired unit heaters connected to two existing service with 1 existing gas meter, 1 new gas meter and new gas piping. No change in use, egress or occupancy. PW1b (Sch B): Fixtures: First Floor 1- Gas Meter, 1- Gas Piping, 4- Gas Furnaces; Risers: 2 Risers on First Floor; Gas Equipment: 2 Modine PDP300 Unit Heaters rated 300,000 BTUH and 2 Modine HD125 Unit Heaters rated 125,000 BTUH. Gas Usage: Heat
On file for this job
9 documents · 1 drawing sheet
Floor 661p · 1 filing · 9 docs
Plumbing
Scope of Work consists of installation of four new gas fired unit heaters connected to two existing service with 1 existing gas meter, 1 new gas meter and new gas piping. No change in use, egress or occupancy. PW1b (Sch B): Fixtures: First Floor 1- Gas Meter, 1- Gas Piping, 4- Gas Furnaces; Risers: 2 Risers on First Floor; Gas Equipment: 2 Modine PDP300 Unit Heaters rated 300,000 BTUH and 2 Modine HD125 Unit Heaters rated 125,000 BTUH. Gas Usage: Heat
On file for this job
9 documents · 1 drawing sheet
Floor 651p · 1 filing · 9 docs
Plumbing
Scope of Work consists of installation of four new gas fired unit heaters connected to two existing service with 1 existing gas meter, 1 new gas meter and new gas piping. No change in use, egress or occupancy. PW1b (Sch B): Fixtures: First Floor 1- Gas Meter, 1- Gas Piping, 4- Gas Furnaces; Risers: 2 Risers on First Floor; Gas Equipment: 2 Modine PDP300 Unit Heaters rated 300,000 BTUH and 2 Modine HD125 Unit Heaters rated 125,000 BTUH. Gas Usage: Heat
On file for this job
9 documents · 1 drawing sheet
Floor 641p · 1 filing · 9 docs
Plumbing
Scope of Work consists of installation of four new gas fired unit heaters connected to two existing service with 1 existing gas meter, 1 new gas meter and new gas piping. No change in use, egress or occupancy. PW1b (Sch B): Fixtures: First Floor 1- Gas Meter, 1- Gas Piping, 4- Gas Furnaces; Risers: 2 Risers on First Floor; Gas Equipment: 2 Modine PDP300 Unit Heaters rated 300,000 BTUH and 2 Modine HD125 Unit Heaters rated 125,000 BTUH. Gas Usage: Heat
On file for this job
9 documents · 1 drawing sheet
Floor 631p · 1 filing · 9 docs
Plumbing
Scope of Work consists of installation of four new gas fired unit heaters connected to two existing service with 1 existing gas meter, 1 new gas meter and new gas piping. No change in use, egress or occupancy. PW1b (Sch B): Fixtures: First Floor 1- Gas Meter, 1- Gas Piping, 4- Gas Furnaces; Risers: 2 Risers on First Floor; Gas Equipment: 2 Modine PDP300 Unit Heaters rated 300,000 BTUH and 2 Modine HD125 Unit Heaters rated 125,000 BTUH. Gas Usage: Heat
On file for this job
9 documents · 1 drawing sheet
Floor 621p · 1 filing · 9 docs
Plumbing
Scope of Work consists of installation of four new gas fired unit heaters connected to two existing service with 1 existing gas meter, 1 new gas meter and new gas piping. No change in use, egress or occupancy. PW1b (Sch B): Fixtures: First Floor 1- Gas Meter, 1- Gas Piping, 4- Gas Furnaces; Risers: 2 Risers on First Floor; Gas Equipment: 2 Modine PDP300 Unit Heaters rated 300,000 BTUH and 2 Modine HD125 Unit Heaters rated 125,000 BTUH. Gas Usage: Heat
On file for this job
9 documents · 1 drawing sheet
Floor 611p · 1 filing · 9 docs
Plumbing
Scope of Work consists of installation of four new gas fired unit heaters connected to two existing service with 1 existing gas meter, 1 new gas meter and new gas piping. No change in use, egress or occupancy. PW1b (Sch B): Fixtures: First Floor 1- Gas Meter, 1- Gas Piping, 4- Gas Furnaces; Risers: 2 Risers on First Floor; Gas Equipment: 2 Modine PDP300 Unit Heaters rated 300,000 BTUH and 2 Modine HD125 Unit Heaters rated 125,000 BTUH. Gas Usage: Heat
On file for this job
9 documents · 1 drawing sheet
Floor 601p · 1 filing · 9 docs
Plumbing
Scope of Work consists of installation of four new gas fired unit heaters connected to two existing service with 1 existing gas meter, 1 new gas meter and new gas piping. No change in use, egress or occupancy. PW1b (Sch B): Fixtures: First Floor 1- Gas Meter, 1- Gas Piping, 4- Gas Furnaces; Risers: 2 Risers on First Floor; Gas Equipment: 2 Modine PDP300 Unit Heaters rated 300,000 BTUH and 2 Modine HD125 Unit Heaters rated 125,000 BTUH. Gas Usage: Heat
On file for this job
9 documents · 1 drawing sheet
Floor 591p · 1 filing · 9 docs
Plumbing
Scope of Work consists of installation of four new gas fired unit heaters connected to two existing service with 1 existing gas meter, 1 new gas meter and new gas piping. No change in use, egress or occupancy. PW1b (Sch B): Fixtures: First Floor 1- Gas Meter, 1- Gas Piping, 4- Gas Furnaces; Risers: 2 Risers on First Floor; Gas Equipment: 2 Modine PDP300 Unit Heaters rated 300,000 BTUH and 2 Modine HD125 Unit Heaters rated 125,000 BTUH. Gas Usage: Heat
On file for this job
9 documents · 1 drawing sheet
Floor 581p · 1 filing · 9 docs
Plumbing
Scope of Work consists of installation of four new gas fired unit heaters connected to two existing service with 1 existing gas meter, 1 new gas meter and new gas piping. No change in use, egress or occupancy. PW1b (Sch B): Fixtures: First Floor 1- Gas Meter, 1- Gas Piping, 4- Gas Furnaces; Risers: 2 Risers on First Floor; Gas Equipment: 2 Modine PDP300 Unit Heaters rated 300,000 BTUH and 2 Modine HD125 Unit Heaters rated 125,000 BTUH. Gas Usage: Heat
On file for this job
9 documents · 1 drawing sheet
Floor 571p · 1 filing · 9 docs
Plumbing
Scope of Work consists of installation of four new gas fired unit heaters connected to two existing service with 1 existing gas meter, 1 new gas meter and new gas piping. No change in use, egress or occupancy. PW1b (Sch B): Fixtures: First Floor 1- Gas Meter, 1- Gas Piping, 4- Gas Furnaces; Risers: 2 Risers on First Floor; Gas Equipment: 2 Modine PDP300 Unit Heaters rated 300,000 BTUH and 2 Modine HD125 Unit Heaters rated 125,000 BTUH. Gas Usage: Heat
On file for this job
9 documents · 1 drawing sheet
Floor 561p · 1 filing · 9 docs
Plumbing
Scope of Work consists of installation of four new gas fired unit heaters connected to two existing service with 1 existing gas meter, 1 new gas meter and new gas piping. No change in use, egress or occupancy. PW1b (Sch B): Fixtures: First Floor 1- Gas Meter, 1- Gas Piping, 4- Gas Furnaces; Risers: 2 Risers on First Floor; Gas Equipment: 2 Modine PDP300 Unit Heaters rated 300,000 BTUH and 2 Modine HD125 Unit Heaters rated 125,000 BTUH. Gas Usage: Heat
On file for this job
9 documents · 1 drawing sheet
Floor 551p · 1 filing · 9 docs
Plumbing
Scope of Work consists of installation of four new gas fired unit heaters connected to two existing service with 1 existing gas meter, 1 new gas meter and new gas piping. No change in use, egress or occupancy. PW1b (Sch B): Fixtures: First Floor 1- Gas Meter, 1- Gas Piping, 4- Gas Furnaces; Risers: 2 Risers on First Floor; Gas Equipment: 2 Modine PDP300 Unit Heaters rated 300,000 BTUH and 2 Modine HD125 Unit Heaters rated 125,000 BTUH. Gas Usage: Heat
On file for this job
9 documents · 1 drawing sheet
Floor 541p · 1 filing · 9 docs
Plumbing
Scope of Work consists of installation of four new gas fired unit heaters connected to two existing service with 1 existing gas meter, 1 new gas meter and new gas piping. No change in use, egress or occupancy. PW1b (Sch B): Fixtures: First Floor 1- Gas Meter, 1- Gas Piping, 4- Gas Furnaces; Risers: 2 Risers on First Floor; Gas Equipment: 2 Modine PDP300 Unit Heaters rated 300,000 BTUH and 2 Modine HD125 Unit Heaters rated 125,000 BTUH. Gas Usage: Heat
On file for this job
9 documents · 1 drawing sheet
Floor 531p · 1 filing · 9 docs
Plumbing
Scope of Work consists of installation of four new gas fired unit heaters connected to two existing service with 1 existing gas meter, 1 new gas meter and new gas piping. No change in use, egress or occupancy. PW1b (Sch B): Fixtures: First Floor 1- Gas Meter, 1- Gas Piping, 4- Gas Furnaces; Risers: 2 Risers on First Floor; Gas Equipment: 2 Modine PDP300 Unit Heaters rated 300,000 BTUH and 2 Modine HD125 Unit Heaters rated 125,000 BTUH. Gas Usage: Heat
On file for this job
9 documents · 1 drawing sheet
Floor 521p · 1 filing · 9 docs
Plumbing
Scope of Work consists of installation of four new gas fired unit heaters connected to two existing service with 1 existing gas meter, 1 new gas meter and new gas piping. No change in use, egress or occupancy. PW1b (Sch B): Fixtures: First Floor 1- Gas Meter, 1- Gas Piping, 4- Gas Furnaces; Risers: 2 Risers on First Floor; Gas Equipment: 2 Modine PDP300 Unit Heaters rated 300,000 BTUH and 2 Modine HD125 Unit Heaters rated 125,000 BTUH. Gas Usage: Heat
On file for this job
9 documents · 1 drawing sheet
Floor 511p · 1 filing · 9 docs
Plumbing
Scope of Work consists of installation of four new gas fired unit heaters connected to two existing service with 1 existing gas meter, 1 new gas meter and new gas piping. No change in use, egress or occupancy. PW1b (Sch B): Fixtures: First Floor 1- Gas Meter, 1- Gas Piping, 4- Gas Furnaces; Risers: 2 Risers on First Floor; Gas Equipment: 2 Modine PDP300 Unit Heaters rated 300,000 BTUH and 2 Modine HD125 Unit Heaters rated 125,000 BTUH. Gas Usage: Heat
On file for this job
9 documents · 1 drawing sheet
Floor 501p · 1 filing · 9 docs
Plumbing
Scope of Work consists of installation of four new gas fired unit heaters connected to two existing service with 1 existing gas meter, 1 new gas meter and new gas piping. No change in use, egress or occupancy. PW1b (Sch B): Fixtures: First Floor 1- Gas Meter, 1- Gas Piping, 4- Gas Furnaces; Risers: 2 Risers on First Floor; Gas Equipment: 2 Modine PDP300 Unit Heaters rated 300,000 BTUH and 2 Modine HD125 Unit Heaters rated 125,000 BTUH. Gas Usage: Heat
On file for this job
9 documents · 1 drawing sheet
Floor 491p · 1 filing · 9 docs
Plumbing
Scope of Work consists of installation of four new gas fired unit heaters connected to two existing service with 1 existing gas meter, 1 new gas meter and new gas piping. No change in use, egress or occupancy. PW1b (Sch B): Fixtures: First Floor 1- Gas Meter, 1- Gas Piping, 4- Gas Furnaces; Risers: 2 Risers on First Floor; Gas Equipment: 2 Modine PDP300 Unit Heaters rated 300,000 BTUH and 2 Modine HD125 Unit Heaters rated 125,000 BTUH. Gas Usage: Heat
On file for this job
9 documents · 1 drawing sheet
Floor 483p · 1 filing · 9 docs
Fire ProtectionPlumbing
Scope of Work consists of installation of four new gas fired unit heaters connected to two existing service with 1 existing gas meter, 1 new gas meter and new gas piping. No change in use, egress or occupancy. PW1b (Sch B): Fixtures: First Floor 1- Gas Meter, 1- Gas Piping, 4- Gas Furnaces; Risers: 2 Risers on First Floor; Gas Equipment: 2 Modine PDP300 Unit Heaters rated 300,000 BTUH and 2 Modine HD125 Unit Heaters rated 125,000 BTUH. Gas Usage: Heat
On file for this job
9 documents · 3 drawing sheets
Floor 471p · 1 filing · 9 docs
Plumbing
Scope of Work consists of installation of four new gas fired unit heaters connected to two existing service with 1 existing gas meter, 1 new gas meter and new gas piping. No change in use, egress or occupancy. PW1b (Sch B): Fixtures: First Floor 1- Gas Meter, 1- Gas Piping, 4- Gas Furnaces; Risers: 2 Risers on First Floor; Gas Equipment: 2 Modine PDP300 Unit Heaters rated 300,000 BTUH and 2 Modine HD125 Unit Heaters rated 125,000 BTUH. Gas Usage: Heat
On file for this job
9 documents · 1 drawing sheet
Floor 461p · 1 filing · 9 docs
Plumbing
Scope of Work consists of installation of four new gas fired unit heaters connected to two existing service with 1 existing gas meter, 1 new gas meter and new gas piping. No change in use, egress or occupancy. PW1b (Sch B): Fixtures: First Floor 1- Gas Meter, 1- Gas Piping, 4- Gas Furnaces; Risers: 2 Risers on First Floor; Gas Equipment: 2 Modine PDP300 Unit Heaters rated 300,000 BTUH and 2 Modine HD125 Unit Heaters rated 125,000 BTUH. Gas Usage: Heat
On file for this job
9 documents · 1 drawing sheet
Floor 451p · 1 filing · 9 docs
Plumbing
Scope of Work consists of installation of four new gas fired unit heaters connected to two existing service with 1 existing gas meter, 1 new gas meter and new gas piping. No change in use, egress or occupancy. PW1b (Sch B): Fixtures: First Floor 1- Gas Meter, 1- Gas Piping, 4- Gas Furnaces; Risers: 2 Risers on First Floor; Gas Equipment: 2 Modine PDP300 Unit Heaters rated 300,000 BTUH and 2 Modine HD125 Unit Heaters rated 125,000 BTUH. Gas Usage: Heat
On file for this job
9 documents · 1 drawing sheet
Floor 441p · 1 filing · 9 docs
Plumbing
Scope of Work consists of installation of four new gas fired unit heaters connected to two existing service with 1 existing gas meter, 1 new gas meter and new gas piping. No change in use, egress or occupancy. PW1b (Sch B): Fixtures: First Floor 1- Gas Meter, 1- Gas Piping, 4- Gas Furnaces; Risers: 2 Risers on First Floor; Gas Equipment: 2 Modine PDP300 Unit Heaters rated 300,000 BTUH and 2 Modine HD125 Unit Heaters rated 125,000 BTUH. Gas Usage: Heat
On file for this job
9 documents · 1 drawing sheet
Floor 431p · 1 filing · 9 docs
Plumbing
Scope of Work consists of installation of four new gas fired unit heaters connected to two existing service with 1 existing gas meter, 1 new gas meter and new gas piping. No change in use, egress or occupancy. PW1b (Sch B): Fixtures: First Floor 1- Gas Meter, 1- Gas Piping, 4- Gas Furnaces; Risers: 2 Risers on First Floor; Gas Equipment: 2 Modine PDP300 Unit Heaters rated 300,000 BTUH and 2 Modine HD125 Unit Heaters rated 125,000 BTUH. Gas Usage: Heat
On file for this job
9 documents · 1 drawing sheet
Floor 421p · 1 filing · 9 docs
Plumbing
Scope of Work consists of installation of four new gas fired unit heaters connected to two existing service with 1 existing gas meter, 1 new gas meter and new gas piping. No change in use, egress or occupancy. PW1b (Sch B): Fixtures: First Floor 1- Gas Meter, 1- Gas Piping, 4- Gas Furnaces; Risers: 2 Risers on First Floor; Gas Equipment: 2 Modine PDP300 Unit Heaters rated 300,000 BTUH and 2 Modine HD125 Unit Heaters rated 125,000 BTUH. Gas Usage: Heat
On file for this job
9 documents · 1 drawing sheet
Floor 411p · 1 filing · 9 docs
Plumbing
Scope of Work consists of installation of four new gas fired unit heaters connected to two existing service with 1 existing gas meter, 1 new gas meter and new gas piping. No change in use, egress or occupancy. PW1b (Sch B): Fixtures: First Floor 1- Gas Meter, 1- Gas Piping, 4- Gas Furnaces; Risers: 2 Risers on First Floor; Gas Equipment: 2 Modine PDP300 Unit Heaters rated 300,000 BTUH and 2 Modine HD125 Unit Heaters rated 125,000 BTUH. Gas Usage: Heat
On file for this job
9 documents · 1 drawing sheet
Floor 401p · 1 filing · 9 docs
Plumbing
Scope of Work consists of installation of four new gas fired unit heaters connected to two existing service with 1 existing gas meter, 1 new gas meter and new gas piping. No change in use, egress or occupancy. PW1b (Sch B): Fixtures: First Floor 1- Gas Meter, 1- Gas Piping, 4- Gas Furnaces; Risers: 2 Risers on First Floor; Gas Equipment: 2 Modine PDP300 Unit Heaters rated 300,000 BTUH and 2 Modine HD125 Unit Heaters rated 125,000 BTUH. Gas Usage: Heat
On file for this job
9 documents · 1 drawing sheet
Floor 393p · 1 filing · 9 docs
DMPlumbing
Scope of Work consists of installation of four new gas fired unit heaters connected to two existing service with 1 existing gas meter, 1 new gas meter and new gas piping. No change in use, egress or occupancy. PW1b (Sch B): Fixtures: First Floor 1- Gas Meter, 1- Gas Piping, 4- Gas Furnaces; Risers: 2 Risers on First Floor; Gas Equipment: 2 Modine PDP300 Unit Heaters rated 300,000 BTUH and 2 Modine HD125 Unit Heaters rated 125,000 BTUH. Gas Usage: Heat
On file for this job
9 documents · 3 drawing sheets
Floor 381p · 1 filing · 9 docs
Plumbing
Scope of Work consists of installation of four new gas fired unit heaters connected to two existing service with 1 existing gas meter, 1 new gas meter and new gas piping. No change in use, egress or occupancy. PW1b (Sch B): Fixtures: First Floor 1- Gas Meter, 1- Gas Piping, 4- Gas Furnaces; Risers: 2 Risers on First Floor; Gas Equipment: 2 Modine PDP300 Unit Heaters rated 300,000 BTUH and 2 Modine HD125 Unit Heaters rated 125,000 BTUH. Gas Usage: Heat
On file for this job
9 documents · 1 drawing sheet
Floor 373p · 1 filing · 9 docs
MechanicalPlumbing
Scope of Work consists of installation of four new gas fired unit heaters connected to two existing service with 1 existing gas meter, 1 new gas meter and new gas piping. No change in use, egress or occupancy. PW1b (Sch B): Fixtures: First Floor 1- Gas Meter, 1- Gas Piping, 4- Gas Furnaces; Risers: 2 Risers on First Floor; Gas Equipment: 2 Modine PDP300 Unit Heaters rated 300,000 BTUH and 2 Modine HD125 Unit Heaters rated 125,000 BTUH. Gas Usage: Heat
On file for this job
9 documents · 3 drawing sheets
Floor 364p · 1 filing · 9 docs
MechanicalPlumbing
Scope of Work consists of installation of four new gas fired unit heaters connected to two existing service with 1 existing gas meter, 1 new gas meter and new gas piping. No change in use, egress or occupancy. PW1b (Sch B): Fixtures: First Floor 1- Gas Meter, 1- Gas Piping, 4- Gas Furnaces; Risers: 2 Risers on First Floor; Gas Equipment: 2 Modine PDP300 Unit Heaters rated 300,000 BTUH and 2 Modine HD125 Unit Heaters rated 125,000 BTUH. Gas Usage: Heat
On file for this job
9 documents · 4 drawing sheets
Floor 351p · 1 filing · 9 docs
Plumbing
Scope of Work consists of installation of four new gas fired unit heaters connected to two existing service with 1 existing gas meter, 1 new gas meter and new gas piping. No change in use, egress or occupancy. PW1b (Sch B): Fixtures: First Floor 1- Gas Meter, 1- Gas Piping, 4- Gas Furnaces; Risers: 2 Risers on First Floor; Gas Equipment: 2 Modine PDP300 Unit Heaters rated 300,000 BTUH and 2 Modine HD125 Unit Heaters rated 125,000 BTUH. Gas Usage: Heat
On file for this job
9 documents · 1 drawing sheet
Floor 341p · 1 filing · 9 docs
Plumbing
Scope of Work consists of installation of four new gas fired unit heaters connected to two existing service with 1 existing gas meter, 1 new gas meter and new gas piping. No change in use, egress or occupancy. PW1b (Sch B): Fixtures: First Floor 1- Gas Meter, 1- Gas Piping, 4- Gas Furnaces; Risers: 2 Risers on First Floor; Gas Equipment: 2 Modine PDP300 Unit Heaters rated 300,000 BTUH and 2 Modine HD125 Unit Heaters rated 125,000 BTUH. Gas Usage: Heat
On file for this job
9 documents · 1 drawing sheet
Floor 331p · 1 filing · 9 docs
Plumbing
Scope of Work consists of installation of four new gas fired unit heaters connected to two existing service with 1 existing gas meter, 1 new gas meter and new gas piping. No change in use, egress or occupancy. PW1b (Sch B): Fixtures: First Floor 1- Gas Meter, 1- Gas Piping, 4- Gas Furnaces; Risers: 2 Risers on First Floor; Gas Equipment: 2 Modine PDP300 Unit Heaters rated 300,000 BTUH and 2 Modine HD125 Unit Heaters rated 125,000 BTUH. Gas Usage: Heat
On file for this job
9 documents · 1 drawing sheet
Floor 322p · 1 filing · 9 docs
ArchitecturePlumbing
Scope of Work consists of installation of four new gas fired unit heaters connected to two existing service with 1 existing gas meter, 1 new gas meter and new gas piping. No change in use, egress or occupancy. PW1b (Sch B): Fixtures: First Floor 1- Gas Meter, 1- Gas Piping, 4- Gas Furnaces; Risers: 2 Risers on First Floor; Gas Equipment: 2 Modine PDP300 Unit Heaters rated 300,000 BTUH and 2 Modine HD125 Unit Heaters rated 125,000 BTUH. Gas Usage: Heat
On file for this job
9 documents · 2 drawing sheets
Floor 312p · 1 filing · 9 docs
MechanicalPlumbing
Scope of Work consists of installation of four new gas fired unit heaters connected to two existing service with 1 existing gas meter, 1 new gas meter and new gas piping. No change in use, egress or occupancy. PW1b (Sch B): Fixtures: First Floor 1- Gas Meter, 1- Gas Piping, 4- Gas Furnaces; Risers: 2 Risers on First Floor; Gas Equipment: 2 Modine PDP300 Unit Heaters rated 300,000 BTUH and 2 Modine HD125 Unit Heaters rated 125,000 BTUH. Gas Usage: Heat
On file for this job
9 documents · 2 drawing sheets
Floor 302p · 1 filing · 9 docs
MechanicalPlumbing
Scope of Work consists of installation of four new gas fired unit heaters connected to two existing service with 1 existing gas meter, 1 new gas meter and new gas piping. No change in use, egress or occupancy. PW1b (Sch B): Fixtures: First Floor 1- Gas Meter, 1- Gas Piping, 4- Gas Furnaces; Risers: 2 Risers on First Floor; Gas Equipment: 2 Modine PDP300 Unit Heaters rated 300,000 BTUH and 2 Modine HD125 Unit Heaters rated 125,000 BTUH. Gas Usage: Heat
On file for this job
9 documents · 2 drawing sheets
Floor 293p · 1 filing · 9 docs
Fire ProtectionMechanicalPlumbing
Scope of Work consists of installation of four new gas fired unit heaters connected to two existing service with 1 existing gas meter, 1 new gas meter and new gas piping. No change in use, egress or occupancy. PW1b (Sch B): Fixtures: First Floor 1- Gas Meter, 1- Gas Piping, 4- Gas Furnaces; Risers: 2 Risers on First Floor; Gas Equipment: 2 Modine PDP300 Unit Heaters rated 300,000 BTUH and 2 Modine HD125 Unit Heaters rated 125,000 BTUH. Gas Usage: Heat
On file for this job
9 documents · 3 drawing sheets
Floor 283p · 1 filing · 9 docs
ArchitectureMechanicalPlumbing
Scope of Work consists of installation of four new gas fired unit heaters connected to two existing service with 1 existing gas meter, 1 new gas meter and new gas piping. No change in use, egress or occupancy. PW1b (Sch B): Fixtures: First Floor 1- Gas Meter, 1- Gas Piping, 4- Gas Furnaces; Risers: 2 Risers on First Floor; Gas Equipment: 2 Modine PDP300 Unit Heaters rated 300,000 BTUH and 2 Modine HD125 Unit Heaters rated 125,000 BTUH. Gas Usage: Heat
On file for this job
9 documents · 3 drawing sheets
Floor 273p · 1 filing · 9 docs
ArchitectureMechanicalPlumbing
Scope of Work consists of installation of four new gas fired unit heaters connected to two existing service with 1 existing gas meter, 1 new gas meter and new gas piping. No change in use, egress or occupancy. PW1b (Sch B): Fixtures: First Floor 1- Gas Meter, 1- Gas Piping, 4- Gas Furnaces; Risers: 2 Risers on First Floor; Gas Equipment: 2 Modine PDP300 Unit Heaters rated 300,000 BTUH and 2 Modine HD125 Unit Heaters rated 125,000 BTUH. Gas Usage: Heat
On file for this job
9 documents · 3 drawing sheets
Floor 264p · 1 filing · 9 docs
ArchitectureMechanicalPlumbing
Scope of Work consists of installation of four new gas fired unit heaters connected to two existing service with 1 existing gas meter, 1 new gas meter and new gas piping. No change in use, egress or occupancy. PW1b (Sch B): Fixtures: First Floor 1- Gas Meter, 1- Gas Piping, 4- Gas Furnaces; Risers: 2 Risers on First Floor; Gas Equipment: 2 Modine PDP300 Unit Heaters rated 300,000 BTUH and 2 Modine HD125 Unit Heaters rated 125,000 BTUH. Gas Usage: Heat
On file for this job
9 documents · 4 drawing sheets
Floor 254p · 1 filing · 9 docs
ArchitectureMechanicalPlumbing
Scope of Work consists of installation of four new gas fired unit heaters connected to two existing service with 1 existing gas meter, 1 new gas meter and new gas piping. No change in use, egress or occupancy. PW1b (Sch B): Fixtures: First Floor 1- Gas Meter, 1- Gas Piping, 4- Gas Furnaces; Risers: 2 Risers on First Floor; Gas Equipment: 2 Modine PDP300 Unit Heaters rated 300,000 BTUH and 2 Modine HD125 Unit Heaters rated 125,000 BTUH. Gas Usage: Heat
On file for this job
9 documents · 4 drawing sheets
Floor 244p · 1 filing · 9 docs
ArchitectureMechanicalPlumbing
Scope of Work consists of installation of four new gas fired unit heaters connected to two existing service with 1 existing gas meter, 1 new gas meter and new gas piping. No change in use, egress or occupancy. PW1b (Sch B): Fixtures: First Floor 1- Gas Meter, 1- Gas Piping, 4- Gas Furnaces; Risers: 2 Risers on First Floor; Gas Equipment: 2 Modine PDP300 Unit Heaters rated 300,000 BTUH and 2 Modine HD125 Unit Heaters rated 125,000 BTUH. Gas Usage: Heat
On file for this job
9 documents · 4 drawing sheets
Floor 235p · 1 filing · 9 docs
ArchitectureMechanicalPlumbing
Scope of Work consists of installation of four new gas fired unit heaters connected to two existing service with 1 existing gas meter, 1 new gas meter and new gas piping. No change in use, egress or occupancy. PW1b (Sch B): Fixtures: First Floor 1- Gas Meter, 1- Gas Piping, 4- Gas Furnaces; Risers: 2 Risers on First Floor; Gas Equipment: 2 Modine PDP300 Unit Heaters rated 300,000 BTUH and 2 Modine HD125 Unit Heaters rated 125,000 BTUH. Gas Usage: Heat
On file for this job
9 documents · 5 drawing sheets
Floor 223p · 1 filing · 9 docs
ArchitecturePlumbing
Scope of Work consists of installation of four new gas fired unit heaters connected to two existing service with 1 existing gas meter, 1 new gas meter and new gas piping. No change in use, egress or occupancy. PW1b (Sch B): Fixtures: First Floor 1- Gas Meter, 1- Gas Piping, 4- Gas Furnaces; Risers: 2 Risers on First Floor; Gas Equipment: 2 Modine PDP300 Unit Heaters rated 300,000 BTUH and 2 Modine HD125 Unit Heaters rated 125,000 BTUH. Gas Usage: Heat
On file for this job
9 documents · 3 drawing sheets
Floor 214p · 1 filing · 9 docs
ArchitectureMechanicalPlumbing
Scope of Work consists of installation of four new gas fired unit heaters connected to two existing service with 1 existing gas meter, 1 new gas meter and new gas piping. No change in use, egress or occupancy. PW1b (Sch B): Fixtures: First Floor 1- Gas Meter, 1- Gas Piping, 4- Gas Furnaces; Risers: 2 Risers on First Floor; Gas Equipment: 2 Modine PDP300 Unit Heaters rated 300,000 BTUH and 2 Modine HD125 Unit Heaters rated 125,000 BTUH. Gas Usage: Heat
On file for this job
9 documents · 4 drawing sheets
Floor 204p · 1 filing · 9 docs
ArchitectureMechanicalPlumbing
Scope of Work consists of installation of four new gas fired unit heaters connected to two existing service with 1 existing gas meter, 1 new gas meter and new gas piping. No change in use, egress or occupancy. PW1b (Sch B): Fixtures: First Floor 1- Gas Meter, 1- Gas Piping, 4- Gas Furnaces; Risers: 2 Risers on First Floor; Gas Equipment: 2 Modine PDP300 Unit Heaters rated 300,000 BTUH and 2 Modine HD125 Unit Heaters rated 125,000 BTUH. Gas Usage: Heat
On file for this job
9 documents · 4 drawing sheets
Floor 195p · 1 filing · 9 docs
ArchitectureMechanicalPlumbing
Scope of Work consists of installation of four new gas fired unit heaters connected to two existing service with 1 existing gas meter, 1 new gas meter and new gas piping. No change in use, egress or occupancy. PW1b (Sch B): Fixtures: First Floor 1- Gas Meter, 1- Gas Piping, 4- Gas Furnaces; Risers: 2 Risers on First Floor; Gas Equipment: 2 Modine PDP300 Unit Heaters rated 300,000 BTUH and 2 Modine HD125 Unit Heaters rated 125,000 BTUH. Gas Usage: Heat
On file for this job
9 documents · 5 drawing sheets
Floor 186p · 1 filing · 9 docs
ArchitectureGeneralMechanicalPlumbing
Scope of Work consists of installation of four new gas fired unit heaters connected to two existing service with 1 existing gas meter, 1 new gas meter and new gas piping. No change in use, egress or occupancy. PW1b (Sch B): Fixtures: First Floor 1- Gas Meter, 1- Gas Piping, 4- Gas Furnaces; Risers: 2 Risers on First Floor; Gas Equipment: 2 Modine PDP300 Unit Heaters rated 300,000 BTUH and 2 Modine HD125 Unit Heaters rated 125,000 BTUH. Gas Usage: Heat
On file for this job
9 documents · 6 drawing sheets
Floor 177p · 1 filing · 9 docs
ArchitectureGeneralMechanicalPlumbing
Scope of Work consists of installation of four new gas fired unit heaters connected to two existing service with 1 existing gas meter, 1 new gas meter and new gas piping. No change in use, egress or occupancy. PW1b (Sch B): Fixtures: First Floor 1- Gas Meter, 1- Gas Piping, 4- Gas Furnaces; Risers: 2 Risers on First Floor; Gas Equipment: 2 Modine PDP300 Unit Heaters rated 300,000 BTUH and 2 Modine HD125 Unit Heaters rated 125,000 BTUH. Gas Usage: Heat
On file for this job
9 documents · 7 drawing sheets
Floor 164p · 1 filing · 9 docs
ArchitectureMechanicalPlumbing
Scope of Work consists of installation of four new gas fired unit heaters connected to two existing service with 1 existing gas meter, 1 new gas meter and new gas piping. No change in use, egress or occupancy. PW1b (Sch B): Fixtures: First Floor 1- Gas Meter, 1- Gas Piping, 4- Gas Furnaces; Risers: 2 Risers on First Floor; Gas Equipment: 2 Modine PDP300 Unit Heaters rated 300,000 BTUH and 2 Modine HD125 Unit Heaters rated 125,000 BTUH. Gas Usage: Heat
On file for this job
9 documents · 4 drawing sheets
Floor 155p · 1 filing · 9 docs
ArchitectureMechanicalPlumbing
Scope of Work consists of installation of four new gas fired unit heaters connected to two existing service with 1 existing gas meter, 1 new gas meter and new gas piping. No change in use, egress or occupancy. PW1b (Sch B): Fixtures: First Floor 1- Gas Meter, 1- Gas Piping, 4- Gas Furnaces; Risers: 2 Risers on First Floor; Gas Equipment: 2 Modine PDP300 Unit Heaters rated 300,000 BTUH and 2 Modine HD125 Unit Heaters rated 125,000 BTUH. Gas Usage: Heat
On file for this job
9 documents · 5 drawing sheets
Floor 144p · 1 filing · 9 docs
ArchitectureFire ProtectionMechanicalPlumbing
Scope of Work consists of installation of four new gas fired unit heaters connected to two existing service with 1 existing gas meter, 1 new gas meter and new gas piping. No change in use, egress or occupancy. PW1b (Sch B): Fixtures: First Floor 1- Gas Meter, 1- Gas Piping, 4- Gas Furnaces; Risers: 2 Risers on First Floor; Gas Equipment: 2 Modine PDP300 Unit Heaters rated 300,000 BTUH and 2 Modine HD125 Unit Heaters rated 125,000 BTUH. Gas Usage: Heat
On file for this job
9 documents · 4 drawing sheets
Floor 134p · 1 filing · 9 docs
ArchitectureMechanicalPlumbing
Scope of Work consists of installation of four new gas fired unit heaters connected to two existing service with 1 existing gas meter, 1 new gas meter and new gas piping. No change in use, egress or occupancy. PW1b (Sch B): Fixtures: First Floor 1- Gas Meter, 1- Gas Piping, 4- Gas Furnaces; Risers: 2 Risers on First Floor; Gas Equipment: 2 Modine PDP300 Unit Heaters rated 300,000 BTUH and 2 Modine HD125 Unit Heaters rated 125,000 BTUH. Gas Usage: Heat
On file for this job
9 documents · 4 drawing sheets
Floor 125p · 1 filing · 9 docs
ArchitectureMechanicalPlumbing
Scope of Work consists of installation of four new gas fired unit heaters connected to two existing service with 1 existing gas meter, 1 new gas meter and new gas piping. No change in use, egress or occupancy. PW1b (Sch B): Fixtures: First Floor 1- Gas Meter, 1- Gas Piping, 4- Gas Furnaces; Risers: 2 Risers on First Floor; Gas Equipment: 2 Modine PDP300 Unit Heaters rated 300,000 BTUH and 2 Modine HD125 Unit Heaters rated 125,000 BTUH. Gas Usage: Heat
On file for this job
9 documents · 5 drawing sheets
Floor 114p · 1 filing · 9 docs
ArchitectureMechanicalPlumbing
Scope of Work consists of installation of four new gas fired unit heaters connected to two existing service with 1 existing gas meter, 1 new gas meter and new gas piping. No change in use, egress or occupancy. PW1b (Sch B): Fixtures: First Floor 1- Gas Meter, 1- Gas Piping, 4- Gas Furnaces; Risers: 2 Risers on First Floor; Gas Equipment: 2 Modine PDP300 Unit Heaters rated 300,000 BTUH and 2 Modine HD125 Unit Heaters rated 125,000 BTUH. Gas Usage: Heat
On file for this job
9 documents · 4 drawing sheets
Floor 105p · 1 filing · 9 docs
ArchitectureFire ProtectionMechanicalPlumbing
Scope of Work consists of installation of four new gas fired unit heaters connected to two existing service with 1 existing gas meter, 1 new gas meter and new gas piping. No change in use, egress or occupancy. PW1b (Sch B): Fixtures: First Floor 1- Gas Meter, 1- Gas Piping, 4- Gas Furnaces; Risers: 2 Risers on First Floor; Gas Equipment: 2 Modine PDP300 Unit Heaters rated 300,000 BTUH and 2 Modine HD125 Unit Heaters rated 125,000 BTUH. Gas Usage: Heat
On file for this job
9 documents · 5 drawing sheets
Floor 95p · 1 filing · 9 docs
ArchitectureEquipmentMechanicalPlumbing
Scope of Work consists of installation of four new gas fired unit heaters connected to two existing service with 1 existing gas meter, 1 new gas meter and new gas piping. No change in use, egress or occupancy. PW1b (Sch B): Fixtures: First Floor 1- Gas Meter, 1- Gas Piping, 4- Gas Furnaces; Risers: 2 Risers on First Floor; Gas Equipment: 2 Modine PDP300 Unit Heaters rated 300,000 BTUH and 2 Modine HD125 Unit Heaters rated 125,000 BTUH. Gas Usage: Heat
On file for this job
9 documents · 5 drawing sheets
Floor 811p · 1 filing · 9 docs
ArchitectureEquipmentMechanicalPlumbingStructural
Scope of Work consists of installation of four new gas fired unit heaters connected to two existing service with 1 existing gas meter, 1 new gas meter and new gas piping. No change in use, egress or occupancy. PW1b (Sch B): Fixtures: First Floor 1- Gas Meter, 1- Gas Piping, 4- Gas Furnaces; Risers: 2 Risers on First Floor; Gas Equipment: 2 Modine PDP300 Unit Heaters rated 300,000 BTUH and 2 Modine HD125 Unit Heaters rated 125,000 BTUH. Gas Usage: Heat
On file for this job
9 documents · 11 drawing sheets
Floor 712p · 1 filing · 9 docs
ArchitectureDMEquipmentFire ProtectionMechanicalPlumbingStructural
Scope of Work consists of installation of four new gas fired unit heaters connected to two existing service with 1 existing gas meter, 1 new gas meter and new gas piping. No change in use, egress or occupancy. PW1b (Sch B): Fixtures: First Floor 1- Gas Meter, 1- Gas Piping, 4- Gas Furnaces; Risers: 2 Risers on First Floor; Gas Equipment: 2 Modine PDP300 Unit Heaters rated 300,000 BTUH and 2 Modine HD125 Unit Heaters rated 125,000 BTUH. Gas Usage: Heat
On file for this job
9 documents · 12 drawing sheets
Floor 616p · 1 filing · 9 docs
ArchitectureEquipmentFire ProtectionMechanicalPlumbingStructural
Scope of Work consists of installation of four new gas fired unit heaters connected to two existing service with 1 existing gas meter, 1 new gas meter and new gas piping. No change in use, egress or occupancy. PW1b (Sch B): Fixtures: First Floor 1- Gas Meter, 1- Gas Piping, 4- Gas Furnaces; Risers: 2 Risers on First Floor; Gas Equipment: 2 Modine PDP300 Unit Heaters rated 300,000 BTUH and 2 Modine HD125 Unit Heaters rated 125,000 BTUH. Gas Usage: Heat
On file for this job
9 documents · 16 drawing sheets
Floor 515p · 1 filing · 9 docs
ArchitectureDMEquipmentFire ProtectionMechanicalPlumbingStructural
Scope of Work consists of installation of four new gas fired unit heaters connected to two existing service with 1 existing gas meter, 1 new gas meter and new gas piping. No change in use, egress or occupancy. PW1b (Sch B): Fixtures: First Floor 1- Gas Meter, 1- Gas Piping, 4- Gas Furnaces; Risers: 2 Risers on First Floor; Gas Equipment: 2 Modine PDP300 Unit Heaters rated 300,000 BTUH and 2 Modine HD125 Unit Heaters rated 125,000 BTUH. Gas Usage: Heat
On file for this job
9 documents · 15 drawing sheets
Floor 418p · 1 filing · 9 docs
ArchitectureDMEquipmentFire ProtectionMechanicalPlumbingStructural
Scope of Work consists of installation of four new gas fired unit heaters connected to two existing service with 1 existing gas meter, 1 new gas meter and new gas piping. No change in use, egress or occupancy. PW1b (Sch B): Fixtures: First Floor 1- Gas Meter, 1- Gas Piping, 4- Gas Furnaces; Risers: 2 Risers on First Floor; Gas Equipment: 2 Modine PDP300 Unit Heaters rated 300,000 BTUH and 2 Modine HD125 Unit Heaters rated 125,000 BTUH. Gas Usage: Heat
On file for this job
9 documents · 18 drawing sheets
Floor 339p · 1 filing · 9 docs
ArchitectureDMEquipmentFire ProtectionMechanicalPlumbingStructural
Scope of Work consists of installation of four new gas fired unit heaters connected to two existing service with 1 existing gas meter, 1 new gas meter and new gas piping. No change in use, egress or occupancy. PW1b (Sch B): Fixtures: First Floor 1- Gas Meter, 1- Gas Piping, 4- Gas Furnaces; Risers: 2 Risers on First Floor; Gas Equipment: 2 Modine PDP300 Unit Heaters rated 300,000 BTUH and 2 Modine HD125 Unit Heaters rated 125,000 BTUH. Gas Usage: Heat
On file for this job
9 documents · 39 drawing sheets
Floor 269p · 1 filing · 9 docs
ArchitectureDMElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Scope of Work consists of installation of four new gas fired unit heaters connected to two existing service with 1 existing gas meter, 1 new gas meter and new gas piping. No change in use, egress or occupancy. PW1b (Sch B): Fixtures: First Floor 1- Gas Meter, 1- Gas Piping, 4- Gas Furnaces; Risers: 2 Risers on First Floor; Gas Equipment: 2 Modine PDP300 Unit Heaters rated 300,000 BTUH and 2 Modine HD125 Unit Heaters rated 125,000 BTUH. Gas Usage: Heat
On file for this job
9 documents · 69 drawing sheets
Floor 171p · 1 filing · 9 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructuralOther
Scope of Work consists of installation of four new gas fired unit heaters connected to two existing service with 1 existing gas meter, 1 new gas meter and new gas piping. No change in use, egress or occupancy. PW1b (Sch B): Fixtures: First Floor 1- Gas Meter, 1- Gas Piping, 4- Gas Furnaces; Risers: 2 Risers on First Floor; Gas Equipment: 2 Modine PDP300 Unit Heaters rated 300,000 BTUH and 2 Modine HD125 Unit Heaters rated 125,000 BTUH. Gas Usage: Heat
On file for this job
9 documents · 71 drawing sheets
Mezzanine12p · 1 filing · 9 docs
ArchitecturePlumbingStructural
Scope of Work consists of installation of four new gas fired unit heaters connected to two existing service with 1 existing gas meter, 1 new gas meter and new gas piping. No change in use, egress or occupancy. PW1b (Sch B): Fixtures: First Floor 1- Gas Meter, 1- Gas Piping, 4- Gas Furnaces; Risers: 2 Risers on First Floor; Gas Equipment: 2 Modine PDP300 Unit Heaters rated 300,000 BTUH and 2 Modine HD125 Unit Heaters rated 125,000 BTUH. Gas Usage: Heat
On file for this job
9 documents · 12 drawing sheets
Cellar112p · 1 filing · 9 docs
ArchitectureCivilDMElectricalFire ProtectionGeneralMechanicalPlumbingStructuralOther
Scope of Work consists of installation of four new gas fired unit heaters connected to two existing service with 1 existing gas meter, 1 new gas meter and new gas piping. No change in use, egress or occupancy. PW1b (Sch B): Fixtures: First Floor 1- Gas Meter, 1- Gas Piping, 4- Gas Furnaces; Risers: 2 Risers on First Floor; Gas Equipment: 2 Modine PDP300 Unit Heaters rated 300,000 BTUH and 2 Modine HD125 Unit Heaters rated 125,000 BTUH. Gas Usage: Heat
On file for this job
9 documents · 112 drawing sheets
Sub-Cellar4p · 1 filing · 9 docs
ArchitectureGeneralPlumbingStructural
Scope of Work consists of installation of four new gas fired unit heaters connected to two existing service with 1 existing gas meter, 1 new gas meter and new gas piping. No change in use, egress or occupancy. PW1b (Sch B): Fixtures: First Floor 1- Gas Meter, 1- Gas Piping, 4- Gas Furnaces; Risers: 2 Risers on First Floor; Gas Equipment: 2 Modine PDP300 Unit Heaters rated 300,000 BTUH and 2 Modine HD125 Unit Heaters rated 125,000 BTUH. Gas Usage: Heat
On file for this job
9 documents · 4 drawing sheets
Basement29p · 1 filing · 9 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Scope of Work consists of installation of four new gas fired unit heaters connected to two existing service with 1 existing gas meter, 1 new gas meter and new gas piping. No change in use, egress or occupancy. PW1b (Sch B): Fixtures: First Floor 1- Gas Meter, 1- Gas Piping, 4- Gas Furnaces; Risers: 2 Risers on First Floor; Gas Equipment: 2 Modine PDP300 Unit Heaters rated 300,000 BTUH and 2 Modine HD125 Unit Heaters rated 125,000 BTUH. Gas Usage: Heat
On file for this job
9 documents · 29 drawing sheets