Factory, industrial, semi-fireproof
467 PROSPECT AVENUE
BROOKLYN · BIN 3337817
💬 Discuss this project
1910Year Built
2Stories
F4Building Class
R7AZoning
38,650 sfGross Floor Area
1Units
0 Open Violations
Factory, industrial, semi-fireproof · Owner of record: ARROW LINEN SUPPLY CO INC · 31,142 sf lot · 1.24 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DEVELOPING NY STATE209/13/2026
AARON LINEN SUPPLY CO103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SEVERUD ASSOCIATES208/20/2026
HAMISH WHITEFIELD ARCHITECTS P.C.107/30/2026
Building Lifecycle
All (39)Filed (3)Violation (5)Objection (3)Special Inspection (28)
08/26/2026
Objection raised — Other
08/24/2026
Objection raised — Other
08/24/2026
Objection raised — Other
08/20/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
Proposed vertical and horizontal enlargement to an existing 1-story building. Conversion from manufacturing to residential on first floor. Total 10-story and cellar residential building
B01434126-S4
08/20/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
Proposed vertical and horizontal enlargement to an existing 1-story building. Conversion from manufacturing to residential on first floor. Total 10-story and cellar residential building
B01434126-S3
08/20/2026
Special inspection requirement — Concrete - Cast-In-Place
08/20/2026
Special inspection requirement — Structural Steel - Details
08/20/2026
Special inspection requirement — Structural Steel - High Strength Bolting
08/20/2026
Special inspection requirement — Structural Steel - Welding
08/20/2026
Special inspection requirement — Final
08/20/2026
Special inspection requirement — Masonry
08/20/2026
Special inspection requirement — Post-installed Anchors
08/20/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
07/30/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
Proposed vertical and horizontal enlargement to an existing 1-story building. Conversion from manufacturing to residential on first floor. Total 10-story and cellar residential building
B01434126-I1
07/28/2026
Special inspection requirement — Insulation placement and R values
07/28/2026
Special inspection requirement — Fenestration air leakage
07/28/2026
Special inspection requirement — Lighting in dwelling units
07/28/2026
Special inspection requirement — Electrical motors and elevators
07/28/2026
Special inspection requirement — Interior lighting power
07/28/2026
Special inspection requirement — Exterior lighting power
07/28/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
07/28/2026
Special inspection requirement — Maintenance information
07/28/2026
Special inspection requirement — Lighting controls
07/28/2026
Special inspection requirement — Protection of exposed foundation insulation
07/28/2026
Special inspection requirement — Fenestration areas
07/28/2026
Special inspection requirement — Metering
07/28/2026
Special inspection requirement — Concrete - Cast-In-Place
07/28/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
07/28/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/28/2026
Special inspection requirement — Energy Code Compliance Inspections
07/28/2026
Special inspection requirement — Fire-Resistance Rated Construction
07/28/2026
Special inspection requirement — Preliminary
07/28/2026
Special inspection requirement — Air barrier - visual inspection
07/21/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/27/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
06/30/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
07/05/1996
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BISOTISSUEDARROW LINEN SUPPLY INC09/17/1996
BISMHISSUEDARROW LINEN SUPPLY INC09/12/1996
1 project · most recent 08/20/2026
Sprinkler System
FiledStatusContractorScope
08/20/2026——Sprinkler System
1 project · most recent 08/20/2026
Steel Concrete Masonry
FiledStatusContractorScope
08/20/2026——Steel, Concrete, Masonry
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
08/20/2026Concrete - Cast-In-Place—special
08/20/2026Structural Steel - Details—special
08/20/2026Structural Steel - High Strength Bolting—special
08/20/2026Structural Steel - Welding—special
08/20/2026Final—progress
08/20/2026Masonry—special
08/20/2026Post-installed Anchors—special
08/20/2026Structural Stability – Alterations of existing buildings—special
07/28/2026Insulation placement and R values—energy_progress
07/28/2026Fenestration air leakage—energy_progress
07/28/2026Lighting in dwelling units—energy_progress
07/28/2026Electrical motors and elevators—energy_progress
07/28/2026Interior lighting power—energy_progress
07/28/2026Exterior lighting power—energy_progress
07/28/2026Fenestration and door U-factor and product ratings—energy_progress
07/28/2026Maintenance information—energy_progress
07/28/2026Lighting controls—energy_progress
07/28/2026Protection of exposed foundation insulation—energy_progress
07/28/2026Fenestration areas—energy_progress
07/28/2026Metering—energy_progress
07/28/2026Concrete - Cast-In-Place—special
07/28/2026Exterior Insulation and Finish Systems (EIFS)—special
07/28/2026Fire-Resistant Penetrations and Joints—special
07/28/2026Energy Code Compliance Inspections—progress
07/28/2026Fire-Resistance Rated Construction—progress
Latest 25 of 28.
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/16/2026B01434126-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram1
08/16/2026B01434126-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/16/2026B01434126-I1Open ↗
▸Seals & Professional Certifications3
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/22/2026B01434126-S4Open ↗
08/22/2026B01434126-S3Open ↗
08/16/2026B01434126-I1Open ↗
▸Other Documents1
▸DOB NOWSite Survey: Initial1
08/16/2026B01434126-I1Open ↗