← Back
Primarily 1 family with 1 store or office
607 BRISTOL STREET
BROOKLYN · BIN 3338529
💬 Discuss this project
1930Year Built
2Stories
S1Building Class
R6Zoning
2,240 sfGross Floor Area
2Units
1 Open Violation 0 unresolved · 1 paperwork only ▸FDNY Report ↗
Primarily 1 family with 1 store or office · 2,000 sf lot · 1.12 FAR built · Flood zone X
Locations of Work
Mechanical
Roof3p · 1 filing · 7 docs
Floor 13p · 1 filing · 7 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ASHRAF CORP108/17/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUPERIOR FIRE CONTROL103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUPERIOR FIRE CONTROL INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JAY KAVI CORPORATION8500108/17/2023
Building Lifecycle
All (9)Filed (1)Permit Issued (1)Violation (3)Special Inspection (4)
08/25/2023
Permit issued — Mechanical Systems
B00900498-I1-MS
08/17/2023
Filed — Alteration
INSTALL EXISTING DELI KITCHEN HOOD AND DUCTWORK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY
B00900498-I1
07/06/2023
Special inspection requirement — Tenant Protection Plan Compliance
Jay Kavi
07/06/2023
Special inspection requirement — Mechanical Systems
Jay Kavi
07/06/2023
Special inspection requirement — Final
BRIAN MCCAFFREY
07/06/2023
Special inspection requirement — Duct leakage testing, insulation and design
AKM HOQUE
06/08/2021
Violation issued (FDNY_NOV, closed)
09/01/2006
Violation issued (ECB, open)
Boilers
08/06/2003
Violation issued (ECB, closed)
Boilers
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedSUPERIOR FIRE CONTROL INC08/25/2023
BISOTISSUEDMETROPOLITAN LAUNDRY MACHINERY09/17/2003
BISOTISSUEDMETROPOLITAN LAUNDRY MACHINERY06/28/2001
1 project · most recent 08/17/2023
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/17/2023Permit IssuedSUPERIOR FIRE CONTROL INCVentilation Systems
Ventilation
Pen Vent USBI18DD 2,000 CFM · Kitchen Exhaust ×1
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
07/06/2023Tenant Protection Plan ComplianceJay Kavispecial
07/06/2023Mechanical SystemsJay Kavispecial
07/06/2023FinalBRIAN MCCAFFREYprogress
07/06/2023Duct leakage testing, insulation and designAKM HOQUEenergy_progress
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/27/2026B00900498-I1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWProgress Inspector Seal & Signature2
08/31/2026B00900498-I1Open ↗
08/31/2026B00900498-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/31/2026B00900498-I1Open ↗
08/31/2026B00900498-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/27/2026B00900498-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/27/2026B00900498-I1Open ↗