← Back
Three families
766 EAST 2 STREET
BROOKLYN · BIN 3338879
💬 Discuss this project
1994Year Built
3Stories
C0Building Class
R5Zoning
5,520 sfGross Floor Area
3Units
Rent Stabilized3 Open Violations 1 unresolved · 2 paperwork only ▸
Three families · 3,875 sf lot · 1.42 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
766 E 28-EARLENE HALL103/22/2026
THE OWNER OF103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ASHER ARCHITECT208/31/2026
Building Lifecycle
All (37)Filed (2)Violation (20)Objection (12)Special Inspection (3)
09/15/2026
Objection raised — Other
09/15/2026
Objection resolved — Resolved
09/14/2026
Objection raised — Scope
09/14/2026
Objection raised — Other
08/31/2026
Filed — Alteration
File to comply with Violation #39192564H: FOR ELECTRICAL WWP, FOR 2-CONDENSER UNITINSTALLED AND MOUNTED TO 2ND FLOO RBRICK WALL AT EXPOSURE #2, FOR SPLIT UNIT SYSTEM.
B01432684-S1
08/25/2026
Special inspection requirement — Mechanical Systems
08/25/2026
Special inspection requirement — Final
08/13/2026
Objection resolved — Addressed
08/13/2026
Objection resolved — Resolved
08/13/2026
Objection resolved — Resolved
08/13/2026
Objection resolved — Addressed
08/06/2026
Objection raised — Other
08/06/2026
Objection raised — Scope
08/06/2026
Objection raised — Scope
08/06/2026
Objection raised — Other
07/24/2026
Filed — Alteration
File to comply with Violation #39192564H: FOR ELECTRICAL WWP, FOR 2-CONDENSER UNITINSTALLED AND MOUNTED TO 2ND FLOO RBRICK WALL AT EXPOSURE #2, FOR SPLIT UNIT SYSTEM.
B01432684-I1
07/17/2026
Special inspection requirement — Final
06/29/2026
Violation issued (ECB, open)
Construction
06/15/2026
Violation issued (ECB, open)
Unknown
05/07/2026
Violation issued (HPD, closed)
A
06/12/2025
Violation issued (HPD, closed)
A
04/16/2024
Violation issued (HPD, closed)
A
11/20/2023
Violation issued (HPD, closed)
I
03/30/2023
Violation issued (HPD, closed)
A
03/08/2022
Violation issued (HPD, closed)
A
04/16/2021
Violation issued (HPD, closed)
A
11/04/2019
Violation issued (HPD, closed)
I
12/07/2017
Violation issued (HPD, closed)
I
10/19/2015
Violation issued (HPD, closed)
I
07/15/2004
Violation issued (ECB, open)
Construction
03/16/1995
Violation issued (ECB, closed)
Construction
01/20/1993
Violation issued (DOB, closed)
VP*-VIOLATION UNSERVED ECB- DISMISSED
02/06/1992
Violation issued (ECB, closed)
Construction
08/26/1991
Violation issued (ECB, closed)
Construction
03/01/1990
Violation issued (ECB, closed)
Construction
02/01/1990
Violation issued (ECB, closed)
Construction
02/01/1990
Violation issued (ECB, closed)
Construction
Nothing on file for this building.
1 project · most recent 08/31/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/31/2026——Heating and Air Conditioning Systems
Heat / Cool
Friedrich MR18Y3J 18,000 BTU · Split System ×1
MR24Y3J 24,000 BTU · Split System ×1
1 project · most recent 06/16/2026
General Wiring
FiledStatusContractorScope
06/16/2026Permit IssuedLND ELECTRIC LLCGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
08/25/2026Mechanical Systems—special
08/25/2026Final—progress
07/17/2026Final—progress
▾Documents — 3 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/15/2026B01432684-I1Request digital key ↗
▸Seals & Professional Certifications2
▸DOB NOWDPL-1: Design Professional Seal & Signature2
09/23/2026B01432684-S1Open ↗
08/16/2026B01432684-I1Open ↗