Church, synagogue, chapel
2544 CHURCH AVENUE
BROOKLYN · BIN 3338999
💬 Discuss this project
1920Year Built
2Stories
M1Building Class
R6Zoning
67,000 sfGross Floor Area
1Units
LL97 Covered2 Open Violations ▸FDNY Report ↗
Church, synagogue, chapel · Owner of record: HOLY CROSS R C CHURCH · 111,152 sf lot · 0.6 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Permit Issued — active, not yet Signed-off
Roof2p · 1 filing · 11 docs
Floor 1Under Construction5p · 2 filings · 15 docs
CellarUnder Construction7p · 2 filings · 15 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ROCKLYN ASSET909/01/2026
HOLY CROSS CHURCH103/21/2026
HOLY CROSS R C CHURCH203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
STUDIOS ARCHITECTURE106/03/2026
ANDREW ROBERT LEVENBAUM P.E.110/11/2024
NEW YORK ENGINEERING ASSOC., P.C.602/22/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NEW YORK ENGINEERING ASSOCIATES1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NY CITY PLUMBER CORPPlumbing307/08/2026
PARISH PROPERTY MANAGEMENTGeneral Contractor207/03/2026
VICTORIA RESTORATION CORP.General Contractor204/09/2026
JOSEPH PITTELLIElectrical103/21/2026
ABILENE INCGeneral Contractor107/08/2026
CONROCK CONSTRUCTION LLCGeneral Contractor108/20/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
C.M. TESTING LABORATORY,1352110/11/2024
NEW YORK ENGINEERING ASSO851502/22/2023
Building Lifecycle
All (76)Filed (8)Permit Issued (10)Signed Off (5)Violation (15)Inspection (4)Objection (12)Special Inspection (22)
08/19/2026
Permit issued — General Construction
B01173690-I1-GC
07/01/2026
Permit issued — General Construction
B01173690-I1-GC
06/12/2026
Permit issued — General Construction
B01173690-I1-GC
06/03/2026
Filed — Alteration
Architectural modifications on Cellar and 1st floor as per plans filed herewith. No change in use, egress or occupancy.
B01173690-I1
04/28/2026
Signed off — Alteration
Facade restoration as per plans filed herewith ( Cracked & spallled brick replacement, Cracked & spallled stone patching, cut & point all brick & stone mortar joints. embedded iron & steel fastener removal. (CONTINUED UNDER COMMENT SECTION)
B01078752-I1
02/25/2026
Signed off — Alteration
B00637186-I1
02/25/2026
Special inspection requirement — Final
Sara Schuster
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/06/2025
Permit issued — General Construction
B01078752-I1-GC
03/26/2025
Permit issued — General Construction
B01078752-I1-GC
12/04/2024
Objection resolved — Addressed
11/26/2024
Objection resolved — Addressed
11/25/2024
Objection raised — Scope
11/25/2024
Objection raised — Scope
11/19/2024
Objection resolved — Addressed
10/25/2024
Objection resolved — Addressed
10/18/2024
Objection resolved — Addressed
10/18/2024
Objection resolved — Addressed
10/17/2024
Violation issued (FDNY_NOV, closed)
10/16/2024
Objection raised — Scope
10/16/2024
Objection raised — Scope
10/16/2024
Objection raised — Other
10/16/2024
Objection raised — Scope
10/11/2024
Filed — Alteration
Facade restoration as per plans filed herewith ( Cracked & spallled brick replacement, Cracked & spallled stone patching, cut & point all brick & stone mortar joints. embedded iron & steel fastener removal. (CONTINUED UNDER COMMENT SECTION)
B01078752-I1
10/09/2024
Special inspection requirement — Energy Code Compliance Inspections
JOHN SEMIOLI
10/09/2024
Special inspection requirement — Preliminary
JOHN SEMIOLI
10/09/2024
Special inspection requirement — Fenestration air leakage
JOHN SEMIOLI
10/09/2024
Special inspection requirement — Masonry
JOHN SEMIOLI
10/09/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
JOHN SEMIOLI
10/09/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
JOHN SEMIOLI
10/02/2024
Special inspection requirement — Final
JOHN SEMIOLI
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/24/2023
Signed off — Alteration
INSTALL NEW CHIMNEY LINER IN EXISTING MASONRY CHIMNEY
B00644702-I1
02/22/2023
Filed — Alteration
INSTALL NEW CHIMNEY LINER IN EXISTING MASONRY CHIMNEY
B00644702-P1
01/09/2023
Signed off — Alteration
CONNECT EXISTING GAS PIPING TO REPLACEMENT BOILER AND GAS/OIL BURNER.
B00636998-I1
01/09/2023
Signed off — Alteration
REPLACE BOILER AND GAS BURNER
B00662524-I1
01/09/2023
Special inspection requirement — Final
LOUIS ARENA
01/09/2023
Special inspection requirement — Energy Code Compliance Inspections
LOUIS ARENA
01/09/2023
Special inspection requirement — Chimneys and vents
LOUIS ARENA
12/08/2022
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
10/24/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/25/2022
Permit issued — Plumbing
B00636998-I1-PL
07/15/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/15/2022
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
03/11/2022
Special inspection requirement — Heating Systems
LOUIS ARENA
03/11/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
LOUIS ARENA
03/11/2022
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
03/11/2022
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
03/11/2022
Special inspection requirement — Maintenance information
LOUIS ARENA
03/09/2022
Filed — Alteration
REPLACE BOILER AND GAS BURNER
B00662524-P1
02/25/2022
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
02/25/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
LOUIS ARENA
02/25/2022
Special inspection requirement — Maintenance information
LOUIS ARENA
02/25/2022
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
02/25/2022
Special inspection requirement — Heating Systems
LOUIS ARENA
01/24/2022
Permit issued — Boiler Equipment
B00662524-I1-BE
01/21/2022
Filed — Alteration
REPLACE BOILER AND GAS BURNER
B00662524-I1
Latest 60 of 76 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedCONROCK CONSTRUCTION LLC08/19/2026
DOB NOWGeneral ConstructionPermit IssuedPARISH PROPERTY MANAGEMENT07/01/2026
DOB NOWGeneral ConstructionPermit IssuedPARISH PROPERTY MANAGEMENT06/12/2026
DOB NOWGeneral ConstructionSigned-offWAULDWELL WINGATE CO, LLC05/06/2025
DOB NOWGeneral ConstructionSigned-offWAULDWELL WINGATE CO, LLC03/26/2025
DOB NOWPlumbingSigned-offNY CITY PLUMBER CORP07/25/2022
DOB NOWBoiler EquipmentSigned-offNY CITY PLUMBER CORP01/24/2022
DOB NOWBoiler EquipmentSigned-offABILENE, INC01/06/2022
DOB NOWPlumbingSigned-offNY CITY PLUMBER CORP01/06/2022
DOB NOWGeneral ConstructionSigned-offABILENE INC01/06/2022
1 project · most recent 01/14/2022
FiledStatusContractorScope
01/14/2022Permit IssuedABILENE ELECTRIC INC—
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
12/08/2022Pass-Final Boiler Equipment InspectionPassView ↗
10/24/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/15/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/15/2022Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
02/25/2026FinalSara Schusterprogress
10/09/2024Energy Code Compliance InspectionsJOHN SEMIOLIprogress
10/09/2024PreliminaryJOHN SEMIOLIprogress
10/09/2024Fenestration air leakageJOHN SEMIOLIenergy_progress
10/09/2024MasonryJOHN SEMIOLIspecial
10/09/2024Fenestration and door U-factor and product ratingsJOHN SEMIOLIenergy_progress
10/09/2024Structural Stability – Alterations of existing buildingsJOHN SEMIOLIspecial
10/02/2024FinalJOHN SEMIOLIprogress
01/09/2023FinalLOUIS ARENAprogress
01/09/2023Energy Code Compliance InspectionsLOUIS ARENAprogress
01/09/2023Chimneys and ventsLOUIS ARENAspecial
03/11/2022Heating SystemsLOUIS ARENAspecial
03/11/2022HVAC-R and service water piping design and insulationLOUIS ARENAenergy_progress
03/11/2022HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
03/11/2022HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
03/11/2022Maintenance informationLOUIS ARENAenergy_progress
02/25/2022HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
02/25/2022HVAC-R and service water piping design and insulationLOUIS ARENAenergy_progress
02/25/2022Maintenance informationLOUIS ARENAenergy_progress
02/25/2022HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
02/25/2022Heating SystemsLOUIS ARENAspecial
11/24/2021Energy Code Compliance InspectionsLOUIS ARENAprogress
▾Documents — 66 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/31/2026B00644702-I1Request digital key ↗
08/31/2026B00644702-P1Request digital key ↗
08/31/2026B00637186-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits2
▸BISPLACE OF ASSEMBLY1
08/03/2010320176055Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
08/17/2012320537763Open ↗
▸Seals & Professional Certifications25
▸DOB NOWProgress Inspector Seal & Signature11
09/23/2026B00662524-I1Open ↗
09/01/2026B01078752-I1Open ↗
09/01/2026B01078752-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/31/2026B00637186-I1Open ↗
08/31/2026B00636998-I1Open ↗
08/31/2026B00662524-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/23/2026B00662524-I1Open ↗
09/01/2026B01078752-I1Open ↗
09/01/2026B01078752-I1Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
08/03/2010320176055Open ↗
▸Trade Schedules & Equipment1
▸BISFA - FDNY APPROVAL : FD-FAA1
09/24/2013320537763Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/31/2026B00637186-I1Open ↗
08/31/2026B00636998-I1Open ↗
08/31/2026B00662524-P1Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
08/17/2012320537763Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/13/2026B01078752-I1Open ↗
▸Energy Compliance5
▸DOB NOWPreliminary Commissioning Report Certification3
08/31/2026B00662524-I1Open ↗
08/13/2026B00637186-I1Open ↗
08/13/2026B00644702-I1Open ↗
▸DOB NOWEN2: As Built Energy Analysis2
08/31/2026B00662524-I1Open ↗
08/13/2026B00637186-I1Open ↗
▸Approvals, Objections & Sign-offs13
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter7
08/31/2026B00637186-I1Open ↗
08/31/2026B00636998-I1Open ↗
08/31/2026B00662524-I1Open ↗
Showing 3 of 7 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
12/19/2013320537763Open ↗
12/19/2013320537763Open ↗
08/17/2012320537763Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
08/17/2012320537763Open ↗
08/03/2010320176055Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
12/19/2013320537763Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
12/19/2013320537763Open ↗
08/17/2012320537763Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
08/17/2012320537763Open ↗