← Back
Elevator apt, fireproof without stores
Starrett City
1325 PENNSYLVANIA AVENUE · BIN 3340240
💬 Discuss this project
1972Year Built
17Stories
D3Building Class
R5Zoning
1,485,000 sfGross Floor Area
2,222Units
LL97 CoveredRent Stabilized18 Open Violations 15 unresolved · 3 paperwork only ▸FISP: SAFEFDNY Report ↗
Elevator apt, fireproof without stores · Owner of record: BSC HOUSING COMPANY, INC. · 883,293 sf lot · 1.68 FAR built · Flood zone AE
Locations of Work
Structural
Roof1p · 1 filing · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BAY RESTORATION CORP.503/22/2026
BSC HOUSING COMPANY303/22/2026
GRAMADIEN REALTY103/22/2026
GREMADIEN REALTY103/22/2026
OWNER OF 1520 HORNELL103/22/2026
STARRET CITY ASSOCS103/22/2026
STARRET CITY HOUSING103/22/2026
GRENADIRE REALTY403/21/2026
GRENADIER REALTY203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BAY RESTORATION203/21/2026
COWLEY ENGINEERING203/21/2026
THERESA VOLTAGGIO203/21/2026
SELECT TYPE203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BAY RESTORATION CORPGeneral Contractor403/21/2026
ADVANCED PLUMBING MECHPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
COWLEY ENGINEERING186301/16/2024
Building Lifecycle
All (116)Filed (6)Permit Issued (3)Signed Off (3)Facade (FISP) (13)Violation (60)Inspection (2)Objection (14)Special Inspection (15)
07/08/2026
Special inspection requirement — Concrete - Cast-In-Place
07/08/2026
Special inspection requirement — Tenant Protection Plan Compliance
07/08/2026
Special inspection requirement — Final
06/29/2026
Filed — Alteration
REMOVAL OF EXISTING CONCRETE SIDEWALK AND ASPHALT DRIVEWAY, INSTALLATION OF NEW CURB, REINSTALLEXISTING LIGHTING ON NEW CONCRETE FOOTING, INSTALL GUARDRAIL, PERMEABLE PAVERS, BOLLARDS.
B01207608-P1
06/26/2026
Special inspection requirement — Tenant Protection Plan Compliance
06/26/2026
Special inspection requirement — Concrete - Cast-In-Place
06/26/2026
Special inspection requirement — Final
04/18/2025
Filed — Alteration
REMOVAL OF EXISTING CONCRETE SIDEWALK AND ASPHALT DRIVEWAY, INSTALLATION OF NEW CURB, REINSTALLEXISTING LIGHTING ON NEW CONCRETE FOOTING, INSTALL GUARDRAIL, PERMEABLE PAVERS, BOLLARDS.
B01207608-I1
02/01/2025
Violation issued (HPD, closed)
C
11/17/2024
Violation issued (HPD, closed)
C
11/17/2024
Violation issued (HPD, closed)
C
05/31/2024
Cycle 9 facade report signed — SAFE
03/06/2024
Signed off — Alteration
B00948803-I1
02/20/2024
Cycle 9 facade report submitted
02/09/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/05/2024
Signed off — Alteration
Facade Repairs as per plans filed herewith. No change to use, egress, or occupancy.
B00811682-I1
01/29/2024
Special inspection requirement — Post-installed Anchors
Eric Cowley
01/29/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Eric Cowley
01/29/2024
Special inspection requirement — Tenant Protection Plan Compliance
Eric Cowley
01/29/2024
Special inspection requirement — Final
Eric Cowley
01/23/2024
Objection raised — Scope
01/23/2024
Objection resolved — Addressed
01/19/2024
Signed off — Alteration
CONSTRUCTION EQUIPMENT- SIDEWALK- SHED PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION, LIVE LOAD 300 # PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2022 BUILDING CODE.
B00933232-I1
01/16/2024
Filed — Alteration
Facade Repairs as per plans filed herewith. No change to use, egress, or occupancy.
B00811682-P1
01/15/2024
Cycle 9 facade inspection completed
01/10/2024
Special inspection requirement — Post-installed Anchors
Eric Cowley
01/10/2024
Special inspection requirement — Final
Eric Cowley
01/10/2024
Special inspection requirement — Tenant Protection Plan Compliance
Eric Cowley
01/10/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Eric Cowley
12/19/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/20/2023
Permit issued — Sidewalk Shed
B00933232-I1-SH
11/20/2023
Permit issued — General Construction
B00811682-I1-GC
11/13/2023
Permit issued — Plumbing
B00948803-I1-PL
10/25/2023
Filed — Alteration
B00948803-I1
10/20/2023
Special inspection requirement — Tenant Protection Plan Compliance
Eric Cowley
10/04/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/25/2023
Objection resolved — Addressed
09/25/2023
Objection resolved — Addressed
09/25/2023
Objection resolved — Addressed
09/25/2023
Objection resolved — Addressed
09/25/2023
Objection resolved — Addressed
09/25/2023
Objection resolved — Addressed
09/21/2023
Objection raised — Other
09/21/2023
Objection raised — Other
09/21/2023
Objection raised — Other
09/21/2023
Objection raised — Other
09/21/2023
Objection raised — Other
09/21/2023
Objection raised — Other
09/14/2023
Filed — Alteration
CONSTRUCTION EQUIPMENT- SIDEWALK- SHED PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION, LIVE LOAD 300 # PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2022 BUILDING CODE.
B00933232-I1
01/18/2023
Filed — Alteration
Facade Repairs as per plans filed herewith. No change to use, egress, or occupancy.
B00811682-I1
07/27/2022
Violation issued (ECB, closed)
Construction
07/23/2021
Violation issued (HPD, closed)
A
05/26/2021
Violation issued (ECB, closed)
Elevators
12/17/2020
Violation issued (HPD, closed)
A
12/17/2020
Violation issued (HPD, closed)
B
12/17/2020
Violation issued (HPD, closed)
B
12/17/2020
Violation issued (HPD, closed)
B
11/24/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
11/24/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/30/2020
Violation issued (HPD, closed)
C
Latest 60 of 116 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offBAY RESTORATION CORP11/20/2023
DOB NOWGeneral ConstructionSigned-offBAY RESTORATION CORP11/20/2023
DOB NOWPlumbingSigned-offADVANCED PLUMBING MECH11/13/2023
BISEQISSUEDADVANCED CONSTRUCTION EQUIPMENT07/05/2013
BISOTISSUEDALLSTATE RESTORATION CORP.04/10/2013
BISOTISSUEDNJKONTRACTING INC04/17/2002
BISOTISSUEDNJKONTRACTING INC01/30/2002
BISEQISSUEDBRIDGEWORKS09/03/1992
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
02/09/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/19/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
07/08/2026Concrete - Cast-In-Place—special
07/08/2026Tenant Protection Plan Compliance—special
07/08/2026Final—progress
06/26/2026Tenant Protection Plan Compliance—special
06/26/2026Concrete - Cast-In-Place—special
06/26/2026Final—progress
01/29/2024Post-installed AnchorsEric Cowleyspecial
01/29/2024Structural Stability – Alterations of existing buildingsEric Cowleyspecial
01/29/2024Tenant Protection Plan ComplianceEric Cowleyspecial
01/29/2024FinalEric Cowleyprogress
01/10/2024Post-installed AnchorsEric Cowleyspecial
01/10/2024FinalEric Cowleyprogress
01/10/2024Tenant Protection Plan ComplianceEric Cowleyspecial
01/10/2024Structural Stability – Alterations of existing buildingsEric Cowleyspecial
10/20/2023Tenant Protection Plan ComplianceEric Cowleyspecial
▾Documents — 49 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/27/2026B00811682-I1Request digital key ↗
08/26/2026B00933232-I1Request digital key ↗
08/26/2026B00948803-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits4
▸BISPLAN / WORK APPROVAL APPLICATION2
07/03/2013340072076Open ↗
02/27/2012320422379Open ↗
▸BISWORK PERMIT APPLICATION2
07/03/2013340072076Open ↗
04/11/2013320422379Open ↗
▸Seals & Professional Certifications18
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/27/2026B00811682-P1Open ↗
08/27/2026B00811682-I1Open ↗
08/26/2026B00933232-I1Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
09/19/2013340072076Open ↗
03/19/2012320422379Open ↗
02/27/2012320422379Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/27/2026B00811682-I1Open ↗
08/28/2026B00948803-I1Open ↗
08/23/2026B00811682-P1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
09/27/2026B00811682-I1Open ↗
08/23/2026B00811682-P1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
07/03/2013340072076Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
07/03/2013340072076Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
07/03/2013340072076Open ↗
▸Environmental & Asbestos4
▸BISTHIS IS NOT AN ASBESTOS PROJECT2
03/09/2012320422379Open ↗
03/09/2012320422379Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/27/2026B00811682-I1Open ↗
08/14/2026B00811682-P1Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY1
02/27/2012320422379Open ↗
▸BISEN2 - As Built Energy Analysis1
09/11/2013320422379Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
07/03/2013340072076Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
07/03/2013340072076Open ↗
▸Approvals, Objections & Sign-offs8
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter5
08/21/2026B01207608-P1Open ↗
08/13/2026B00811682-I1Open ↗
08/13/2026B00811682-P1Open ↗
Showing 3 of 5 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
09/11/2013320422379Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
02/27/2012320422379Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
09/19/2013340072076Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
09/11/2013320422379Open ↗
02/27/2012320422379Open ↗
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET1
07/03/2013340072076Open ↗
▸BISEFILING COVER SHEET1
02/27/2012320422379Open ↗
▸Other Documents1
▸BISFEE EXEMPTION DOCUMENTATION1
07/03/2013340072076Open ↗