ECB04/09/2026FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS. NO CERTIFICATE OF CORRECTION ON FILE FOR VIO#39083708P AS OF 4/9/2026., FILE A CERTIFICATE O$1K due
ECB04/09/2026UNLAWFUL ACTS. FAILURE TO COMPLY WITH COMMISSIONER'S ORDER. FOR WORK WITHOUT A PERMIT FOR VIO#39083709R . NO PERMIT ON FILE AS OF 4/9/2026., COMPLY WITH COMMISSIONER'S ORDER$2K due
ECB04/13/2023OBSERVED AT EXTERIOR EXP2 INSTALLED SWING STAGE SCAFFOLD ATTACHED TO ROOF PARAPET WALL WITH C HOOKS WITH NO NOTIFICATION OR ENGINEER REPORT GIVEN/PROVIDED FOR STRUCTURAL INTEGRITY SUPPORT FOR SCAFFOLD INSTALLAT$2K due
ECB04/13/2023OBSERVED AT EXTERIOR EXP 1&2 REPLACING ALL 2ND STORY WINDOW LINTELS, INSTALLED A SWING STAGE SCAFFOLD WITH NO PERMITS OR APPROVALS ISSUED FROM DOB, OBTAIN PERMIT; STOP ALL WORK AT EXTERIOR OBTAIN ALL REQUIRED P$2K due
ECB04/13/2023OBSERVED 2 WORKERS ON SITE ERECTING/USING SWING SCAFFOLD WITH NO CERTIFICATION AS A SCAFFOLD ERECTOR/USER, DISCONTINUE ACTIVITY AND OBTAIN A SUPPORTED SCAFFOLD CERTIFICATE OF COMPLETION AS REQUIRED; DISCONTINUE$5K due
HPD10/17/2012SECTION 27-2046.1, 2046.2 HMC: PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES. IN THE ENTIRE APARTMENT LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
HPD10/10/2012SECTION 27-2031 ADMIN. CODE: PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY, APARTMENT AT SOUTH
ECB04/04/2023FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT TIME OF INSPECTION, OBSERVED AT TWO (2) STORY MIXED USE BUILDING, FACADE IS IN A STATE OF DISREPAIR. THE DEFECT INCLUDES MISSING BRICK MORTAR JOINTS, HONothing owed — awaiting certificate of correction
ECB06/12/2017FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER/INSTALLATION MAINTAINCE OF PLUMBING MATERIALS OR EQUIPMENT-PC 102.3;27-902. INSTALLED PROHIBITED MATERIALS PVC DRAINAGE PIPING CONNECTED TO STORM OUT.Nothing owed — awaiting certificate of correction
ECB06/12/2017FAILURE TO HAVE NEW OR ALTERED PLUMBING SYSTEMS TESTED-OBSERVED LEFT SIDE BLDG STORM PIPING FOR ROOF-INSTALLED 2"WASTE PIPING NO INSPECTION ON FILE. REMEDY: PERFORM INSPECTION.Nothing owed — awaiting certificate of correction
ECB07/03/2012B201. FOUND NEW BOILER INSTALLED; GALAXY AHX 230, 231,000 BTU - WORK W/O PERMIT.Nothing owed — awaiting certificate of correction
Single or multiple dwelling with stores or offices · 2,000 sf lot · 1.85 FAR built · Flood zone X