← Back
One family attached or semi-detached
559 LINWOOD STREET
BROOKLYN · BIN 3343422
💬 Discuss this project
1992Year Built
2Stories
A5Building Class
R5Zoning
1,134 sfGross Floor Area
1Units
One family attached or semi-detached · 1,224 sf lot · 0.93 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MOMENTUM SOLAR209/14/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MXV SIA LLC9281209/14/2026
Building Lifecycle
All (8)Filed (2)Permit Issued (1)Special Inspection (5)
09/14/2026
Filed — Alteration
Installation of solar panels, rooftop, grid tied, railed, 5 modules, 2.175 KW
B01393517-P1
09/14/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mina Makar
09/14/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Mina Makar
09/14/2026
Special inspection requirement — Energy Code Compliance Inspections
Mina Makar
09/14/2026
Special inspection requirement — Final
Mina Makar
09/14/2026
Special inspection requirement — Air barrier - visual inspection
Mina Makar
05/01/2026
Permit issued — Solar
B01393517-I1-SL
04/27/2026
Filed — Alteration
Installation of solar panels, rooftop, grid tied, railed, 5 modules, 2.175 KW
B01393517-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offMOMENTUM SOLAR05/01/2026
BISPLISSUEDDUO PLUMBING & HTG CORP.12/30/1991
BIS—ISSUEDM.R.L.S. CONSTR.12/09/1991
2 projects · most recent 09/16/2026
FiledStatusContractorScope
09/16/2026Permit IssuedISLAND ELECTRIC CORP—
04/27/2026CompleteISLAND ELECTRIC CORP—
1 project · most recent 09/14/2026
FiledStatusContractorScope
09/14/2026Signed-offMOMENTUM SOLAR5 panels, 2.17 kw, 1,224 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
09/14/2026Fire-Resistant Penetrations and JointsMina Makarspecial
09/14/2026Structural Stability – Alterations of existing buildingsMina Makarspecial
09/14/2026Energy Code Compliance InspectionsMina Makarprogress
09/14/2026FinalMina Makarprogress
09/14/2026Air barrier - visual inspectionMina Makarenergy_progress
▾Documents — 6 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/17/2026B01393517-I1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature2
09/23/2026B01393517-P1Open ↗
08/17/2026B01393517-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
09/23/2026B01393517-P1Open ↗
09/23/2026B01393517-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/23/2026B01393517-P1Open ↗