← Back
Elevator apt, fireproof without stores
Starrett City
180 BETHEL LOOP · BIN 3343586
💬 Discuss this project
1970Year Built
20Stories
D3Building Class
R5Zoning
1,688,760 sfGross Floor Area
2,926Units
LL97 CoveredRent Stabilized30 Open Violations 26 unresolved · 4 paperwork only ▸FISP: SAFEFDNY Report ↗
Elevator apt, fireproof without stores · Owner of record: BSC HOUSING COMPANY, INC. · 1,073,857 sf lot · 1.57 FAR built · Flood zone AE
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BSC HOUSING COMPANY503/22/2026
PNA CONTRACTING303/22/2026
STARRETT CITY INC603/22/2026
GREMADIER REALTY203/22/2026
GRENADIRE REALTY203/21/2026
GREANDIER REALTY203/21/2026
GRENADIER REALTY203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NEW YORK ENGINEERING ASSOC., P.C.110/21/2024
PAUL PERDEK, PROF. ENG. PLLC104/22/2022
TIFFANI LEE SIMPLE103/18/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NEW YORK ENGINEERING ASSOCIATES P C203/21/2026
AE DESIGN SOLUTION203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PNA CONTRACTING CORPGeneral Contractor203/21/2026
ASANKOMAH, KOFIElectrical103/21/2026
IRVING BAPTISTEElectrical103/21/2026
SPIELER, RONALDElectrical103/21/2026
PROTO ENTERPRISE GROUP LLGeneral Contractor107/08/2026
ADVANCED PLUMBING MECHPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NEW YORK ENGINEERING ASSO851110/21/2024
SIMPLE DESIGN STUDIO-ARCH7915103/18/2022
Building Lifecycle
All (91)Filed (3)Permit Issued (3)Signed Off (3)Facade (FISP) (12)Violation (60)Inspection (2)Objection (2)Special Inspection (6)
01/30/2025
Signed off — Alteration
REGISTER GAS DRYERS (BUILDING NO. D3).
B01094871-I1
01/27/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/23/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/07/2025
Violation issued (HPD, closed)
C
01/04/2025
Violation issued (HPD, closed)
C
01/04/2025
Violation issued (HPD, closed)
C
01/02/2025
Permit issued — Plumbing
B01094871-I1-PL
10/21/2024
Filed — Alteration
REGISTER GAS DRYERS (BUILDING NO. D3).
B01094871-I1
08/12/2024
Special inspection requirement — Tenant Protection Plan Compliance
LOUIS ARENA
06/06/2023
Cycle 9 facade report signed — SAFE
02/20/2023
Cycle 9 facade report submitted
01/13/2023
Cycle 9 facade inspection completed
01/06/2023
Signed off — Alteration
EXTERIOR FACADE RESTORATION INCLUDING MASONRY REPLACEMENT, MORTAR JOINT REPLACEMENT, SEALANT REPLACEMENT, WINDOW SILL REPLACEMENT AND CONCRETE SLAB EDGE PATCHING.
B00693558-I1
11/05/2022
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00716739-I1
11/01/2022
Violation issued (FDNY_NOV, closed)
07/30/2022
Violation issued (ECB, closed)
Construction
07/30/2022
Violation issued (ECB, closed)
Construction
07/30/2022
Violation issued (ECB, closed)
Construction
07/23/2022
Permit issued — Sidewalk Shed
B00716739-I1-SH
07/13/2022
Permit issued — General Construction
B00693558-I1-GC
06/22/2022
Violation issued (HPD, closed)
A
06/22/2022
Violation issued (HPD, closed)
C
06/07/2022
Violation issued (HPD, closed)
C
04/22/2022
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00716739-I1
04/11/2022
Special inspection requirement — Final
Paul Perdek
03/22/2022
Objection raised — Admin
03/22/2022
Objection resolved — Addressed
03/18/2022
Filed — Alteration
EXTERIOR FACADE RESTORATION INCLUDING MASONRY REPLACEMENT, MORTAR JOINT REPLACEMENT, SEALANT REPLACEMENT, WINDOW SILL REPLACEMENT AND CONCRETE SLAB EDGE PATCHING.
B00693558-I1
03/18/2022
Special inspection requirement — Air barrier - visual inspection
Tiffani Simple
03/07/2022
Special inspection requirement — Masonry
Tiffani Simple
03/07/2022
Special inspection requirement — Post-installed Anchors
Tiffani Simple
03/07/2022
Special inspection requirement — Final
Tiffani Simple
06/17/2021
Violation issued (HPD, closed)
B
06/17/2021
Violation issued (HPD, closed)
B
06/03/2021
Violation issued (HPD, closed)
C
04/08/2021
Violation issued (ECB, open)
Construction
04/08/2021
Violation issued (ECB, closed)
Elevators
04/08/2021
Violation issued (ECB, closed)
Elevators
11/18/2020
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/15/2020
Violation issued (HPD, closed)
C
07/29/2020
Violation issued (ECB, closed)
Elevators
07/16/2020
Violation issued (ECB, closed)
Elevators
06/05/2020
Violation issued (HPD, closed)
A
01/21/2020
Violation issued (HPD, closed)
B
01/21/2020
Violation issued (HPD, closed)
C
10/25/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/25/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/05/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/05/2018
Violation issued (HPD, closed)
B
12/05/2018
Violation issued (HPD, closed)
B
11/16/2018
Violation issued (HPD, closed)
B
11/14/2018
Violation issued (HPD, closed)
A
11/14/2018
Violation issued (HPD, closed)
A
11/14/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/05/2018
Cycle 8 facade report signed — SAFE
01/26/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/24/2018
Cycle 8 facade inspection completed
10/20/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
06/29/2017
Violation issued (ECB, closed)
Construction
05/18/2017
Violation issued (HPD, closed)
C
Latest 60 of 91 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offADVANCED PLUMBING MECH01/02/2025
DOB NOWSidewalk ShedSigned-offPROTO ENTERPRISE GROUP LL07/23/2022
DOB NOWGeneral ConstructionSigned-offPNA CONTRACTING CORP07/13/2022
BISEQISSUEDROCK SCAFFOLDING CORP02/16/2012
BISOTISSUEDALLSTATE RESTORATION CORP.01/10/2012
BISOTISSUEDPRETEE CONSTSRUCTION CO INC01/10/2005
BISOTISSUEDNJK CONTRACTING INC10/10/2001
BISSPISSUEDP R PLBG & HTG INC10/11/1991
BIS—ISSUEDWERNER KREBS INC07/25/1991
1 project · most recent 04/22/2022
FiledStatusContractorScope
04/22/2022CompleteHIGH QUALITY ELECTRIC OF—
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
01/27/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/23/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
08/12/2024Tenant Protection Plan ComplianceLOUIS ARENAspecial
04/11/2022FinalPaul Perdekprogress
03/18/2022Air barrier - visual inspectionTiffani Simpleenergy_progress
03/07/2022MasonryTiffani Simplespecial
03/07/2022Post-installed AnchorsTiffani Simplespecial
03/07/2022FinalTiffani Simpleprogress
▾Documents — 36 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/29/2026B00716739-I1Request digital key ↗
08/23/2026B01094871-I1Request digital key ↗
08/15/2026B00693558-I1Request digital key ↗
▸Applications & Permits3
▸BISWORK PERMIT APPLICATION2
02/21/2012320431136Open ↗
01/10/2012320344686Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
02/21/2012320431136Open ↗
▸Seals & Professional Certifications16
▸BISTECHNICAL REPORT: RESPONSIBILITY-CERTIFICATION5
05/09/2014320431136Open ↗
03/23/2012320344686Open ↗
01/10/2012320344686Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/01/2026B00693558-I1Open ↗
09/01/2026B00693558-I1Open ↗
08/28/2026B01094871-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature3
09/01/2026B00716739-I1Open ↗
09/01/2026B00693558-I1Open ↗
09/01/2026B00693558-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/23/2026B01094871-I1Open ↗
08/13/2026B00716739-I1Open ↗
08/13/2026B00693558-I1Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
02/21/2012320431136Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
02/21/2012320431136Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026B00693558-I1Open ↗
▸Energy Compliance2
▸BISTR8: Energy Code Progress Inspections1
12/16/2011320344686Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026B00693558-I1Open ↗
▸Approvals, Objections & Sign-offs9
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
03/23/2012320344686Open ↗
03/21/2012320344686Open ↗
05/09/2014320431136Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter3
08/13/2026B01094871-I1Open ↗
08/13/2026B00693558-I1Open ↗
08/13/2026B00716739-I1Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
05/09/2014320431136Open ↗
12/16/2011320344686Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
02/21/2012320431136Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
03/21/2012320344686Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
02/21/2012320431136Open ↗