← Back
Elevator apt, fireproof without stores
Starrett City
180 BETHEL LOOP · BIN 3343588
💬 Discuss this project
1970Year Built
20Stories
D3Building Class
R5Zoning
1,688,760 sfGross Floor Area
2,926Units
LL97 CoveredRent Stabilized28 Open Violations 24 unresolved · 4 paperwork only ▸FISP: SAFEFDNY Report ↗
Elevator apt, fireproof without stores · Owner of record: BSC HOUSING COMPANY, INC. · 1,073,857 sf lot · 1.57 FAR built · Flood zone AE
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BSC HOUSING COMPANY203/22/2026
GRENADIER REALTY503/22/2026
STARRETT CITY INC403/22/2026
STARRETT COOP103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NEW YORK ENGINEERING ASSOC., P.C.110/18/2024
PAUL PERDEK, PROF. ENG. PLLC206/14/2022
TIFFANI LEE SIMPLE103/18/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE DESIGN SOLUTION403/21/2026
NEW YORK ENGINEERING ASSOCIATES P C203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HIGH QUALITY ELECTRIC OFElectrical103/22/2026
IRVING BAPTISTEElectrical103/21/2026
PNA CONTRACTING CORPGeneral Contractor104/08/2026
PROTO RESTORATION CONSTRUCTIONGeneral Contractor107/08/2026
ADVANCED PLUMBING MECHPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NEW YORK ENGINEERING ASSO851110/18/2024
SIMPLE DESIGN STUDIO-ARCH7915103/18/2022
Building Lifecycle
All (86)Filed (4)Permit Issued (3)Signed Off (3)Facade (FISP) (12)Violation (60)Inspection (3)Special Inspection (1)
08/19/2026
Violation issued (HPD, open)
B
12/24/2025
Violation issued (HPD, closed)
C
12/24/2025
Violation issued (HPD, closed)
C
12/24/2025
Violation issued (HPD, closed)
A
12/24/2025
Violation issued (HPD, closed)
C
12/06/2025
Violation issued (HPD, closed)
B
11/11/2025
Violation issued (HPD, closed)
B
11/11/2025
Violation issued (HPD, closed)
C
11/11/2025
Violation issued (HPD, closed)
A
11/11/2025
Violation issued (HPD, closed)
B
11/11/2025
Violation issued (HPD, closed)
C
09/21/2025
Violation issued (HPD, closed)
B
05/31/2025
Violation issued (HPD, closed)
B
05/31/2025
Violation issued (HPD, closed)
B
05/31/2025
Violation issued (HPD, closed)
A
02/24/2025
Violation issued (HPD, closed)
A
02/24/2025
Violation issued (HPD, closed)
A
02/24/2025
Violation issued (HPD, closed)
A
01/23/2025
Signed off — Alteration
REGISTER GAS DRYERS (BUILDING NO. D5).
B01094947-I1
12/28/2024
Violation issued (HPD, closed)
C
12/28/2024
Violation issued (HPD, closed)
A
12/28/2024
Violation issued (HPD, closed)
C
12/16/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/13/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/06/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/18/2024
Permit issued — Plumbing
B01094947-I1-PL
11/08/2024
Violation issued (HPD, closed)
A
10/18/2024
Filed — Alteration
REGISTER GAS DRYERS (BUILDING NO. D5).
B01094947-I1
08/21/2024
Violation issued (HPD, closed)
B
08/12/2024
Special inspection requirement — Tenant Protection Plan Compliance
LOUIS ARENA
05/16/2024
Violation issued (HPD, closed)
B
05/01/2024
Violation issued (HPD, closed)
B
05/01/2024
Violation issued (HPD, closed)
B
11/05/2023
Violation issued (HPD, closed)
B
10/16/2023
Violation issued (HPD, closed)
B
10/16/2023
Violation issued (HPD, closed)
C
10/16/2023
Violation issued (HPD, closed)
A
06/26/2023
Violation issued (HPD, closed)
A
05/24/2023
Violation issued (HPD, closed)
C
05/24/2023
Violation issued (HPD, closed)
C
05/24/2023
Violation issued (HPD, closed)
A
02/20/2023
Cycle 9 facade report submitted
02/02/2023
Cycle 9 facade report signed — SAFE
01/13/2023
Cycle 9 facade inspection completed
01/11/2023
Signed off — Alteration
B00693568-I1
11/05/2022
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00716795-I1
11/01/2022
Violation issued (FDNY_NOV, closed)
10/03/2022
Violation issued (HPD, closed)
A
10/03/2022
Violation issued (HPD, closed)
B
10/03/2022
Violation issued (HPD, closed)
B
07/07/2022
Permit issued — General Construction
B00693568-I1-GC
06/14/2022
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00716795-P1
04/21/2022
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00716795-I1
04/21/2022
Permit issued — Sidewalk Shed
B00716795-I1-SH
03/18/2022
Filed — Alteration
B00693568-I1
10/06/2021
Violation issued (HPD, closed)
B
10/06/2021
Violation issued (HPD, closed)
C
10/06/2021
Violation issued (HPD, closed)
B
10/06/2021
Violation issued (HPD, closed)
C
10/06/2021
Violation issued (HPD, closed)
C
Latest 60 of 86 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offADVANCED PLUMBING MECH11/18/2024
DOB NOWGeneral ConstructionSigned-offPNA CONTRACTING CORP07/07/2022
DOB NOWSidewalk ShedSigned-offPROTO RESTORATION CONSTRU04/21/2022
BISOTISSUEDALLSTATE RESTORATION CORP.04/18/2012
BISEQISSUEDROCK SCAFFOLDING CORP03/14/2012
BISOTISSUEDALLSTATE RESTORATION CORP.02/29/2012
BISOTISSUEDALLSTATE RESTORATION CORP.11/09/2006
BISOTISSUEDNJK CONTR INC04/07/2000
1 project · most recent 04/22/2022
FiledStatusContractorScope
04/22/2022CompleteHIGH QUALITY ELECTRIC OF—
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
12/16/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/13/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/06/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
08/12/2024Tenant Protection Plan ComplianceLOUIS ARENAspecial
▾Documents — 37 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/30/2026B00693568-I1Request digital key ↗
08/29/2026B00716795-I1Request digital key ↗
08/29/2026B00716795-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits5
▸BISWORK PERMIT APPLICATION3
04/23/2012320344695Open ↗
03/16/2012320432064Open ↗
03/09/2012320344695Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION2
03/14/2012320432064Open ↗
11/07/2011320344695Open ↗
▸Seals & Professional Certifications11
▸BISTECHNICAL REPORT: RESPONSIBILITY-CERTIFICATION4
05/09/2014320432064Open ↗
11/07/2011320344695Open ↗
06/26/2012320344695Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/29/2026B00716795-I1Open ↗
08/23/2026B01094947-I1Open ↗
08/13/2026B00716795-P1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
03/14/2012320432064Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
03/14/2012320432064Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/30/2026B01094947-I1Open ↗
▸Environmental & Asbestos2
▸BISTHIS IS NOT AN ASBESTOS PROJECT1
11/07/2011320344695Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026B00693568-I1Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
06/26/2012320344695Open ↗
▸BISTR8: Energy Code Progress Inspections1
11/07/2011320344695Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026B00693568-I1Open ↗
▸Approvals, Objections & Sign-offs9
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter4
08/29/2026B00716795-I1Open ↗
08/13/2026B01094947-I1Open ↗
08/13/2026B00693568-I1Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
05/09/2014320432064Open ↗
11/07/2011320344695Open ↗
▸BISCERTIFICATE OF OCCUPANCY - LOC: REQUEST2
05/09/2014320432064Open ↗
06/26/2012320344695Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
03/14/2012320432064Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
06/26/2012320344695Open ↗
11/07/2011320344695Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
03/14/2012320432064Open ↗