← Back
Elevator apt, fireproof without stores
Starrett City
180 BETHEL LOOP · BIN 3343597
💬 Discuss this project
1970Year Built
20Stories
D3Building Class
R5Zoning
1,688,760 sfGross Floor Area
2,926Units
LL97 CoveredRent Stabilized28 Open Violations 24 unresolved · 4 paperwork only ▸FISP: SAFEFDNY Report ↗
Elevator apt, fireproof without stores · Owner of record: BSC HOUSING COMPANY, INC. · 1,073,857 sf lot · 1.57 FAR built · Flood zone AE
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BSC HOUSING COMPANY1307/08/2026
PNA CONTRACTING703/22/2026
ROCKPOINT GROUP LLC103/22/2026
GREMADIER REALTY203/22/2026
GRENADIER REALTY303/22/2026
GRENADIRE REALTY203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE DESIGN SOLUTION403/21/2026
SELECT TYPE203/21/2026
NEW YORK ENGINEERING103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
D.B. DEMOLITION, INCGeneral Contractor107/08/2026
PNA CONTRACTING CORPGeneral Contractor107/08/2026
PROTO ENTERPRISE GROUP LLGeneral Contractor107/08/2026
ADVANCED PLUMBING MECHPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SANDEEP GUNNALA ENGINEERI8482104/18/2025
NEW YORK ENGINEERING ASSO851110/22/2024
SIMPLE DESIGN STUDIO-ARCH7915103/17/2022
Building Lifecycle
All (102)Filed (6)Permit Issued (5)Signed Off (5)Facade (FISP) (13)Violation (60)Inspection (3)Objection (2)Special Inspection (8)
06/21/2026
Violation issued (HPD, open)
B
06/21/2026
Violation issued (HPD, open)
B
06/21/2026
Violation issued (HPD, open)
C
06/21/2026
Violation issued (HPD, open)
B
06/21/2026
Violation issued (HPD, open)
B
05/13/2026
Violation issued (HPD, closed)
B
05/13/2026
Violation issued (HPD, open)
B
03/13/2026
Violation issued (HPD, closed)
B
01/25/2026
Violation issued (HPD, closed)
A
01/25/2026
Violation issued (HPD, closed)
B
11/24/2025
Signed off — Alteration
install outrigger suspended scaffolding during facade restoration work and work inspection
B01293052-I1
10/06/2025
Permit issued — Suspended Scaffold
B01293052-I1-SC
10/06/2025
Objection resolved — Addressed
10/02/2025
Objection raised — Other
09/25/2025
Filed — Alteration
install outrigger suspended scaffolding during facade restoration work and work inspection
B01293052-I1
08/15/2025
Signed off — Alteration
REMOVAL OF EXISTING CONCRETE SIDEWALK AND ASPHALT DRIVEWAY, INSTALLATION OF NEW CURB, REINSTALLEXISTING LIGHTING ON NEW CONCRETE FOOTING, INSTALL GUARDRAIL, PERMEABLE PAVERS, BOLLARDS.
B01207604-I1
07/17/2025
Violation issued (ECB, closed)
Construction
05/08/2025
Permit issued — General Construction
B01207604-I1-GC
04/18/2025
Filed — Alteration
REMOVAL OF EXISTING CONCRETE SIDEWALK AND ASPHALT DRIVEWAY, INSTALLATION OF NEW CURB, REINSTALLEXISTING LIGHTING ON NEW CONCRETE FOOTING, INSTALL GUARDRAIL, PERMEABLE PAVERS, BOLLARDS.
B01207604-I1
04/18/2025
Special inspection requirement — Tenant Protection Plan Compliance
Sandeep Gunnala
04/17/2025
Special inspection requirement — Concrete - Cast-In-Place
Sandeep Gunnala
04/08/2025
Special inspection requirement — Final
Sandeep Gunnala
01/15/2025
Signed off — Alteration
REGISTER GAS DRYERS (BUILDING E1)
B01093995-I1
12/31/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/26/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/03/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
11/13/2024
Permit issued — Plumbing
B01093995-I1-PL
11/08/2024
Violation issued (HPD, closed)
A
10/22/2024
Filed — Alteration
REGISTER GAS DRYERS (BUILDING E1)
B01093995-I1
08/09/2024
Special inspection requirement — Tenant Protection Plan Compliance
LOUIS ARENA
05/30/2024
Violation issued (ECB, closed)
Construction
05/30/2024
Violation issued (ECB, closed)
Construction
10/31/2023
Violation issued (HPD, closed)
C
10/26/2023
Violation issued (FDNY_NOV, closed)
05/24/2023
Violation issued (HPD, closed)
A
04/27/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00724064-I1
04/13/2023
Violation issued (FDNY_NOV, closed)
02/20/2023
Cycle 9 facade report submitted
02/08/2023
Cycle 9 facade inspection completed
02/02/2023
Cycle 9 facade report signed — SAFE
01/25/2023
Violation issued (ECB, closed)
Construction
01/09/2023
Signed off — Alteration
B00692721-I1
11/17/2022
Violation issued (ECB, closed)
Unknown
09/27/2022
Violation issued (ECB, closed)
Construction
09/27/2022
Violation issued (ECB, closed)
Construction
08/16/2022
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00724064-P1
08/16/2022
Violation issued (ECB, closed)
Construction
08/16/2022
Violation issued (ECB, closed)
Construction
08/16/2022
Violation issued (ECB, closed)
Construction
08/16/2022
Violation issued (ECB, closed)
Site Safety
07/17/2022
Violation issued (HPD, closed)
B
07/07/2022
Permit issued — General Construction
B00692721-I1-GC
06/08/2022
Permit issued — Sidewalk Shed
B00724064-I1-SH
06/07/2022
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00724064-I1
03/17/2022
Filed — Alteration
B00692721-I1
03/17/2022
Special inspection requirement — Air barrier - visual inspection
Tiffani Simple
03/06/2022
Special inspection requirement — Final
Tiffani Simple
03/06/2022
Special inspection requirement — Post-installed Anchors
Tiffani Simple
03/06/2022
Special inspection requirement — Masonry
Tiffani Simple
04/30/2021
Violation issued (ECB, closed)
Elevators
Latest 60 of 102 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldSigned-offBAY RESTORATION CORP10/06/2025
DOB NOWGeneral ConstructionSigned-offD.B. DEMOLITION, INC05/08/2025
DOB NOWPlumbingSigned-offADVANCED PLUMBING MECH11/13/2024
DOB NOWGeneral ConstructionSigned-offPNA CONTRACTING CORP07/07/2022
DOB NOWSidewalk ShedSigned-offPROTO ENTERPRISE GROUP LL06/08/2022
BISOTISSUEDALLSTATE RESTORATION CORP.11/07/2012
BISEQISSUEDADVANCED CONSTRUCTION EQUIPMENT10/26/2012
BISEQISSUEDALLSTATE RESTORATION CORP.10/25/2012
BISEQISSUEDADVANCED CONSTRUCTION EQUIPMENT10/04/2012
BISOTISSUEDALLSTATE RESTORATION CORP.05/30/2007
2 projects · most recent 11/25/2025
FiledStatusContractorScope
11/25/2025CompleteQUEENSBORO ELEC'L CONTR'G—
06/20/2022CompleteHIGH QUALITY ELECTRIC OF—
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
12/31/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/26/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/03/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
04/18/2025Tenant Protection Plan ComplianceSandeep Gunnalaspecial
04/17/2025Concrete - Cast-In-PlaceSandeep Gunnalaspecial
04/08/2025FinalSandeep Gunnalaprogress
08/09/2024Tenant Protection Plan ComplianceLOUIS ARENAspecial
03/17/2022Air barrier - visual inspectionTiffani Simpleenergy_progress
03/06/2022FinalTiffani Simpleprogress
03/06/2022Post-installed AnchorsTiffani Simplespecial
03/06/2022MasonryTiffani Simplespecial
▾Documents — 49 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/30/2026B00692721-I1Request digital key ↗
08/29/2026B00724064-P1Request digital key ↗
08/29/2026B00724064-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits5
▸BISWORK PERMIT APPLICATION3
11/08/2012320341055Open ↗
10/27/2012320507260Open ↗
10/05/2012320507260Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION2
10/05/2012320507260Open ↗
09/02/2011320341055Open ↗
▸Seals & Professional Certifications19
▸DOB NOWSpecial Inspector Seal & Signature5
09/20/2026B01093995-I1Open ↗
09/01/2026B01207604-I1Open ↗
09/01/2026B01207604-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/29/2026B00724064-I1Open ↗
08/29/2026B00724064-P1Open ↗
08/21/2026B01207604-I1Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
02/13/2013320341055Open ↗
10/05/2012320507260Open ↗
09/02/2011320341055Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
09/01/2026B01207604-I1Open ↗
08/30/2026B00692721-I1Open ↗
08/30/2026B00692721-I1Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
10/05/2012320507260Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
10/05/2012320507260Open ↗
▸Environmental & Asbestos2
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
09/02/2011320341055Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026B00692721-I1Open ↗
▸Energy Compliance2
▸BISTECHNICAL REPORT: ENERGY1
09/20/2011320341055Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026B00692721-I1Open ↗
▸Approvals, Objections & Sign-offs9
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter5
08/29/2026B00724064-P1Open ↗
08/29/2026B00724064-I1Open ↗
08/13/2026B01207604-I1Open ↗
Showing 3 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
10/05/2012320507260Open ↗
07/29/2011320341055Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
02/13/2013320341055Open ↗
05/01/2013320507260Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
02/13/2013320341055Open ↗
09/02/2011320341055Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET2
10/05/2012320507260Open ↗
09/02/2011320341055Open ↗
▸Other Documents2
▸DOB NOWManufacturer's Specifications1
08/13/2026B01293052-I1Open ↗
▸DOB NOWCalculations1
08/13/2026B01293052-I1Open ↗